Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.4 LAccepted-AOC | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹23.5 L+₹13,149.05 (0.56%)Rejected-Finance 59 NEW MARKET CLOCK TOWER DEHRADUN UK PIN 248001 | DEHRADUN | UTTARAKHAND | 248001 | L2 | Rejected-Finance Being not lowest | |
| 3 | L3₹23.5 L+₹14,795.44 (0.63%)Rejected-Finance | L3 | Rejected-Finance Being not lowest | |
| 4 | L4₹26.6 L+₹3.2 L (13.8%)Rejected-Finance | L4 | Rejected-Finance Being not lowest | |
| 5 | L5₹27.7 L+₹4.3 L (18.6%)Rejected-Finance RAJKOT ROAD AIR FORCE STATION HALWARA 141106 PUNJAB | HALWARA | LUDHIANA | PUNJAB | 141106 | L5 | Rejected-Finance Being not lowest |
Tender Value
Refer Docs
EMD Value
₹57,000
Closing Date
26 Oct 2020, 6:00 pmClosed
GE (AF) Halwara
GE (AF) Halwara
OUTSOURCING FOR MANNING AND OPERATION OF DG SETS IN ZONE B AREA AT AF STATION HALWARA
2020_MES_383628_1
GE/HAL-45/2020-21
Open Tender
Civil Works
Item Rate
334 days
GE (AF) Halwara
MES ENLISTED CONTRACTORS CLASS D CATEGORY d v
11 documents required · 11 mandatory
₹500
Yes
GE (AF) Halwara
₹57,000
Yes
27 Nov 2020
5 Oct 2020
28 Oct 2020
5 Oct 2020
26 Oct 2020
19 Oct 2020
Amount
Manning, operation and general routine maintenance of diesel engine generator set of capacity 125 KVA-01 No, 160 KVA-01 No & 62.5 KVA-01 No installed at 13 ORP in three shifts each of 8 hours round the clock for all days including sunday & holydays (01 No operator per shift) generating set comprising of engine alternator, fuel tank, control panel, radiator, battery 12 Volts, change over switch etc. including routine maintenance of generator set all as specified and as directed. Note :- (i) Daily attendance shall be marked in attendance register by the JE Concerned. Attendance shall be checked by the EIC and GE on their visit. (ii) "Dos" and "Don'ts" standing orders of operating machines maintenance programme shall be displayed in each installtaion. (iii) Log book, log sheet shall be filled shift wise. (iv) Operator shall be in proper uniform (Over all combination as approved by the GE and cost of uniform included in the rate quoted) in case of non provision of uniform Rs. 1000/- shall be deducted per uniform from the payment dues. (v) Surrounding area shall be kept clean and tidy.
Semi-Skilled workers (ITI qualified), One operator in Three shifts only
All as per Srl item No. 1 here-in-before but DG Set of capacity 180 KVA - 1 No installed at S-4, one operator per shift of 08 hrs for three shifts.
Semi-Skilled workers (ITI qualified), One operator in Three shifts only
All as per Srl item No. 1 here-in-before but DG set pf capacity 100 KVA installed at OBD , one operator per shift of 8 hours for two shifts.
Semi-Skilled workers (ITI qualified), One operator in two shifts only
All as per Srl item No 1 hereinbefore but DG set of capacity 50 KVA - 01 No installed at MRB, one operator per shift of 08 hours for one shift only
Semi-Skilled workers (ITI qualified), One operator in one shift only
All as per Srl item No 1 hereinbefore but DG set of capacity 50 KVA - 01 No installed at Headquarter, one operator per shift of 08 hours for one shift only
Semi-Skilled workers (ITI qualified), One operator in one shift only
All as per Srl item No 1 hereinbefore but DG set of capacity 20 KVA - 02 No installed at 221 Sqn Control, one operator per shift of 08 hours for one shift only
Semi-Skilled workers (ITI qualified), One operator in one shift only
All as per Srl item No 1 hereinbefore but DG set of capacity 20 KVA - 01 and DG set of Capacity 40 KVA - 01 No installed at 2215 Sqn , one operator per shift of 08 hours for one shift only
Semi-Skilled workers (ITI qualified), One operator in one shift only
NOTES for Srl.No. 1 to 7.01 including sub paras here-in-before:- (i) For detail about attending the complaints, priorities, penalties, qualifications etc please refer Sch 'A' Notes and tender documents. (ii) The rates quoted in Column 13, shall not be less than the minimum wages as notified by the GOI/ state Govt/local body,whichever is higher failing which the tender shall be treated as non-bonafide. (iii) The contractor shall also quote rate/percentage against EPF, ESIC, Bonus, LWC, GST and OH&P in respecive column i.e, Column No 14,16,20,22 & 26, as per latest instructions of concern department as on "end date of bid submission". (iv) The bid shall be treated as Non-bonafide on following reasons:- (a) Quoting Nil against OH&P. (b) Quotating less than Minimum wages (c) Quotating LWC less than 1% (d) Quotating Less/Nil against EPF, ESIC & Bonus w.r.t same as applicable according to total number of workmen/wages as per instruction in vogue.
NOTES(Contd/-) (v) The financial effect involved against EPF, ESIC & Bonus shall be paid only after submission of valid and authenticate document in support of proof of payment failing which payment against these heads shall not be made. (vi) Contractor is required to quote upto two digits after decimal place or otherwise it will be considered by rounding off to two digits after decimal place. (vii) For further detail instructions, refer tender documents.
M/s badrinath Traders
M/S J N TRADERS
M/S SANGA SINGH AND CO
CHOUDHARY ENTERPRISES
M/s GURFATEH BUILDERS
JASSI TRADERS
airstack india
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .