| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 CrAdmitted-Finance 5 A WEST REST CAMP DEHRADUN | ₹7.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.9 Cr+₹19.2 L (2.51%)Admitted-Finance | ₹7.9 Cr+₹19.2 L (2.51%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non Responsive-1- Certificates i not issued by employer/executive agency and one details is given, no details of current years is submitted |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S DOON INFRASTRUCTURE L1 | Technical Consultant And Construction Associates L2 |
|---|---|---|---|---|---|
| 1.00 | Bridge Work
Excavation for Structures
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Mechanical Means.
Up to 3.0 M. | 123.84 | Cum | - | - |
| 2.00 | Providing and Laying Cutting Edge of Mild Steel weighing 40 kg per metre for Well Foundation complete as per Drawing and Technical Specification. | 9.62 | MT | - | - |
| 3.00Sinking of 6 m external diameter well (other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level. Sandy Soil. | |||||
| 3.10 | Abutments 2 no. ( A1 , A2 )
Up to 3.0 M | 6 | RM | - | - |
| 3.20 | Beyond 3 m upto 10 m depth | 14 | RM | - | - |
| 3.30 | Beyond 10 m upto 20 m | 15.6 | RM | - | - |
| 3.40 | Piers 6 no. ( P1 to P7 )
Depth below bed level upto 3.0 M | 18 | RM | - | - |
| 3.50 | Beyond 3 m upto 10 m depth | 42 | RM | - | - |
| 3.60 | Beyond 10 m upto 20 m | 46.8 | RM | - | - |
| 4.00Plain/Reinforced Cement Concrete, in Well Foundation complete as per Drawing and Technical Specification Concrete to be placed using tremie pipe Using Batching Plant, Transit Mixer and Crane/concrete pump | |||||
Tender Value
₹8.6 Cr
EMD Value
₹17.5 L
Closing Date
7 Feb 2020, 3:00 pmClosed
Superintending Engineer
SE, Civil Circle, PWD, Haridwar.
Construction of RCC Prestressed bridge of 175 m span over the Ban Ganga River at Bhowawali Ghat in Khanpur Constituency Under Central Road Fund.
2020_pwd_21969_1
3386/06C-Civil Circle/2019 Dated 28/12/2019
Open Tender
Civil Works
Item Rate
540 days
Laksar
As Per Bid Document
2 documents required · 2 mandatory
₹5,900
EE, CD, PWD, Laksar
₹17.5 L
Haridwar
11 Mar 2020
3 Jan 2020
7 Feb 2020
3 Jan 2020
7 Feb 2020
11 Jan 2020
10 Jan 2020
Amount
Bridge Work Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Mechanical Means. Up to 3.0 M.
Providing and Laying Cutting Edge of Mild Steel weighing 40 kg per metre for Well Foundation complete as per Drawing and Technical Specification.
Sinking of 6 m external diameter well (other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level. Sandy Soil.
Abutments 2 no. ( A1 , A2 ) Up to 3.0 M
Beyond 3 m upto 10 m depth
Beyond 10 m upto 20 m
Piers 6 no. ( P1 to P7 ) Depth below bed level upto 3.0 M
Beyond 3 m upto 10 m depth
Beyond 10 m upto 20 m
Plain/Reinforced Cement Concrete, in Well Foundation complete as per Drawing and Technical Specification Concrete to be placed using tremie pipe Using Batching Plant, Transit Mixer and Crane/concrete pump
Well curb RCC M 35 Grade (If curb concrete is carried out within steel liner, cost of formwork shall be excluded.)
Well steining RCC M - 35
Bottom plug PCC M - 25
Top plug PCC M - 15
Well Cap RCC M - 30
Sand Filling in Wells complete as per Drawing and Technical Specifications
70% qty obtain from of well
30% qty fill from querry
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications. RCC Grade M 35 Using Batching Plant, Transit Mixer and Concrete Pump Hight up to 5 M.
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification Grade PSC M 40 Hight 5 to 10 M.
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
High tensile steel wires/strands including all accessories for stressing, stressing operations and grouting complete as per drawing and Technical Specifications
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, completre assembly to be of cast steel / fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete asper drawing and approved technical specifications. (Including the Cost of Bearing Assembly)
Drainage Spouts complete as per drawing and Technical specification
Reinforced Cement Concrete Crash Barrier metre Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-20 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/ 1/94-DO III dated 24 June 1994 as per dimensions in the \ approved drawing and at locations directed by the Engineer, all as specified
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification
Reinforced cement concrete (M 30) approach slab excluding reinforcement and formwork complete as per drawing and Technical specification
Providing and laying of strip seal expansion joint catering to maximum horizontal movement upto 70 mm ( complete as per approved drawings and standard specifications ) to be installed by the manufacturer / supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
Providing and constructing one span service road to reach island location from one pier location to another pier location
Providing and constructing temporary island 16 m diameter for construction of well foundation for 8 m dia. Well. Assuming depth of water 1.0 m and height of island to be 1.25m.
Protection Work Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material Mechanical Means Depth upto 3 m
Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions (Zinc plus PVC coated), of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 2.7mm/3.7mm, edge/selvedge wire diameter 3.4/4.4 mm and lacing wire diameter 2.2/3.2 mm. (The work includes filling boulders in the gabions).
6.0 M. SPAN BOX CULVERT Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.)
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M15
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 R.C.C. grade M 25
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC M 25 Using Batching Plant, Transit Mixer and Concrete Pump
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Drainage Spouts complete as per drawing and Technical specification
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-20 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified)
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
PCC M15 grade levelling course below approach slab complete as per drawing and technical specifications.
Reinforced cement concrete (M-30) approach slab including formwork but excluding reinforcement steel, complete as per drawing and Technical specification
Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications.
PROTECTION WORK Curtain wall complete as per drawing and Technical specification Cement concrete Grade M15
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. Boulder laid dry without wire crates.
Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions (Zinc plus PVC coated), of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 2.7mm/3.7mm, edge/selvedge wire diameter 3.4/4.4 mm and lacing wire diameter 2.2/3.2 mm. (The work includes filling boulders in the gabions).
APPROCH ROAD Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.)
Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions (Zinc plus PVC coated), of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 2.7mm/3.7mm, edge/selvedge wire diameter 3.4/4.4 mm and lacing wire diameter 2.2/3.2 mm. (The work includes filling boulders in the gabions).
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification
Providing and laying Pitching on slopes laid over prepared filter media including boulderapron laid dry in front of toe of embankment complete as per drawing and Technical specifications
Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. Using naturally occuring gravel
Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) By Manual Means Grading- II (Using Screening Crushable type such as Moorum or Gravel) Using Screening Type-A (13.2mm Agg.)
Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) By Manual Means Grading- III (Using Screening Crushable type such as Moorum or Gravel) Using Screening Type-B (11.2mm Agg.)
Tack coat Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
Open - Graded Premix Surfacing (Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades.) Mechanical method using Penetration grade Bitumen and HMP of appropriate capacity not less than 75 tonnes/hour
Seal CoatProviding and laying of premix sand seal coat with HMP of appropriate capacity not less than 75 tonnes/ hours using Crushed Sand or Grit Passing 2.36 mm and retained on 180 micron and penetration bitumen of suitable grade. Type B
Brick on edge pavement with straight overburnt bricks laid on edge including preparation of subgrade to prescribed camber and including supply of bricks, filling joints with local sand and spreading blinding coat 1cm(3/8")depth of local sand over the entire surface and including supply of all materials, labour and T&P etc. required for proper completion of the work.
Direction and Place Identification signs upto 0.9 sqm size board. (Providing and erecting direction and place identification retro-reflectorised sign asper IRC:67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing)
AFP (Aluminum-backed flexible prismatic sheeting) Hazard Marker: Providing and fixing Aluminum-backed flexible prismatic sheeting consisting of Yellow colored flexible prismatic sheeting with non-metallic prismatic lens as retro reflective elements and conforming to ASTM D 4956-09 Type VI specification values for reboundable sheeting. AFP sheeting shall be of 1ft width and laminated at the back with a 50 micron thick Aluminum (Al) foil with pressure sensitive adhesive and liner. AFP sheeting shall have screen printed arrow/slant line pattern in black color on top & shall not crack when tested for flexibility as per section S2.2.2 of ASTM D 4956-09. The AFP sheeting shall be applied with a neoprene contact adhesive with Polychloroprene as base & the edges of the product shall be sealed all around with a two-part epoxy based structural adhesive and shall be extremely resistant to peel-off & product specification shall confirm to IRC Accreditation.
Retro- reflectorised Traffic signs (Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)
90 cm equilateral triangle
60 cm equilateral triangle
60 cm circular
80 mm x 60 mm rectangular
Technical Consultant And Construction Associates
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.71 MB
bid.pdf
Tender Documents • 3.08 MB
Drawings.pdf
Other Document • 1.11 MB
BOQ_26206.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .