| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83.8 CrAccepted-AOC 11 JAMES HICKEY SARANI 2ND FLOOR KOLKATA 700069 | KOLKATA | KOLKATA | WEST BENGAL | 700069 | ₹83.8 Cr | L1 | Accepted-AOC being lowest |
| 2 | L2₹83.9 Cr+₹12.6 L (0.15%)Rejected-Finance | ₹83.9 Cr+₹12.6 L (0.15%) | L2 | Rejected-Finance NOT BEING LOWEST |
| 3 | L3₹84.1 Cr+₹28.6 L (0.34%)Rejected-Finance | ₹84.1 Cr+₹28.6 L (0.34%) | L3 | Rejected-Finance NOT BEING LOWEST |
| 4 | L4₹86.1 Cr+₹2.4 Cr (2.81%)Rejected-Finance PLOT NO 341 LUV KUSH MARG KANAK VRINDAVAN PANCHYAWALA SIRSI ROAD JAIPUR 302034 RAJASTHAN | JAIPUR | JAIPUR | RAJASTHAN | 302034 | ₹86.1 Cr+₹2.4 Cr (2.81%) | L4 | Rejected-Finance NOT BEING LOWEST |
| 5 | L5₹86.7 Cr+₹2.9 Cr (3.48%)Rejected-Finance | ₹86.7 Cr+₹2.9 Cr (3.48%) | L5 | Rejected-Finance NOT BEING LOWEST |
| Sl No | Description | Qty | Unit | Komal Buildcon Pvt. Ltd. L4 | SHRI GURMUKHDAS CONTRACTORS PVT. LTD. L27 | K KUMAR RAJA PROJECTS P LIMITED L22 | Indus Projects Private Limited L16 | HTE INFRA LLP L18 | DES RAJ AND SONS BUILDERS PVT LTD L19 | Hariom Projects Pvt Ltd L29 | D R STEEL CONSTRUCTION COMPANY PRIVATE LIMITED L1 | SVS PROJECTS L26 | M/s Matadeen Ramchandra Agarwal L28 | NSC Projects Pvt. Ltd. L6 | jd constructions L11 | SOOD ASSOCIATES PVT LTD L25 | anjaliinfratech L2 | LUMOS INFRA PVT LTD L20 | City Promoter and Buildwell Pvt. Ltd. L8 | RAGHUSONS INFRA ENGINEERING PVT. LTD L9 | M/s Aadhar Stumbh Infra Pvt Ltd L21 | M/s Shree Riddhi Siddhi Buildwell Limited L17 | R V RAYANAM L10 | K GOWDA AND COMPANY L15 | JYOTI ENTERPRISES L3 | CHHABINDRA KUMAR PRADHAN L14 | Som Projects Pvt. Ltd. L5 | NJR Constructions Private Limited L7 | PNSC INFRASTRUCTURE PRIVATE LIMITED L24 | MAHINDER PAL CONSTRUCTIONS PVT LTD L23 | Vriddhi Infratech India Private Limited L12 | SHRADHA SABOORI PROJECTS INDIA PRIVATE LIMITED L13 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| .10Schedule "A" Part – I to Schedule "A" Part – XIX: NOTE: Schedule "A" Part – I to Part – XIX are prepriced by MES. Bidders shall insert their Lumpsum amount in Green coloured field under Column - 6 only | ||||||||||||||||||||||||||||||||
| 1.00 | Lumpsum price worked out by the contractor for "Buildings & Structures", as listed in Schedule "A" Part – I . | 1 | EACH JOB | 56,19,71,100 ₹56,19,71,100 | 67,07,40,000 ₹67,07,40,000 | 62,00,00,000 ₹62,00,00,000 | 58,37,76,890.01 ₹58,37,76,890.01 | 63,44,83,500 ₹63,44,83,500 | 62,78,36,530 ₹62,78,36,530 | 93,66,18,500 ₹93,66,18,500 | 54,65,88,295 ₹54,65,88,295 | 71,30,39,999 ₹71,30,39,999 | 68,40,00,000 ₹68,40,00,000 | 55,54,27,300 ₹55,54,27,300 | 56,80,13,800 ₹56,80,13,800 | 66,33,07,179 ₹66,33,07,179 | 55,95,62,300.15 ₹55,95,62,300.15 | 59,19,44,400 ₹59,19,44,400 | 53,47,76,742.1 ₹53,47,76,742.1 | 57,30,23,198.3 ₹57,30,23,198.3 | 57,93,11,319.5 ₹57,93,11,319.5 | 65,11,22,947.86 ₹65,11,22,947.86 | 52,26,94,805 ₹52,26,94,805 | 58,00,00,000 ₹58,00,00,000 | 51,88,88,000 ₹51,88,88,000 Lowest | 59,76,23,030 ₹59,76,23,030 | 56,00,11,000 ₹56,00,11,000 | 55,57,26,216.98 ₹55,57,26,216.98 | 59,00,00,000 ₹59,00,00,000 | 65,00,00,000 ₹65,00,00,000 | 57,76,12,800 ₹57,76,12,800 | 61,05,00,000 ₹61,05,00,000 |
| 2.00 | Lumpsum price worked out by the contractor for "Site Clearance / Earthwork/ Excavation", as listed in Schedule "A" Part – II . | 1 | EACH JOB | 22,45,931.98 ₹22,45,931.98 | 21,26,100 ₹21,26,100 | 20,00,000 ₹20,00,000 | 19,03,226.43 ₹19,03,226.43 | 17,25,000 ₹17,25,000 | 19,16,528.63 ₹19,16,528.63 | 29,94,575.98 ₹29,94,575.98 | 12,84,850 ₹12,84,850 Lowest | 20,39,999 ₹20,39,999 | 36,00,000 ₹36,00,000 | 13,41,260 ₹13,41,260 | 23,95,660.79 ₹23,95,660.79 | 21,86,040.47 ₹21,86,040.47 | 21,12,620.55 ₹21,12,620.55 | 18,03,522.2 ₹18,03,522.2 | 26,95,117 ₹26,95,117 | 21,80,919.74 ₹21,80,919.74 | 20,96,203.19 ₹20,96,203.19 | 17,96,745.59 ₹17,96,745.59 | 29,94,576 ₹29,94,576 | 28,00,000 ₹28,00,000 | 17,96,745 ₹17,96,745 | 17,96,745.59 ₹17,96,745.59 | 16,50,000 ₹16,50,000 | 29,94,575.98 ₹29,94,575.98 | 29,94,575.98 ₹29,94,575.98 | 22,00,000 ₹22,00,000 | 27,90,400 ₹27,90,400 | 32,94,033 ₹32,94,033 |
| 3.00 | Lumpsum price worked out by the contractor for "Pile foundation", as listed in Schedule "A" Part – III | 1 | EACH JOB | 9,12,12,559.2 ₹9,12,12,559.2 | 10,97,81,000 ₹10,97,81,000 | 9,30,00,000 ₹9,30,00,000 | 9,05,97,860.64 ₹9,05,97,860.64 | 9,23,42,000 ₹9,23,42,000 | 9,22,98,423 ₹9,22,98,423 | 10,85,86,380 ₹10,85,86,380 | 8,17,44,195 ₹8,17,44,195 | 8,82,66,949 ₹8,82,66,949 | 12,33,00,000 ₹12,33,00,000 | 8,51,41,500 ₹8,51,41,500 | 9,07,78,213.68 ₹9,07,78,213.68 | 10,85,86,380 ₹10,85,86,380 | 8,42,74,800 ₹8,42,74,800 | 11,40,35,000 ₹11,40,35,000 | 10,80,90,878.9 ₹10,80,90,878.9 | 8,99,41,012.69 ₹8,99,41,012.69 | 10,85,86,380 ₹10,85,86,380 | 8,16,67,800 ₹8,16,67,800 | 10,02,06,000 ₹10,02,06,000 | 9,40,00,000 ₹9,40,00,000 | 9,68,14,550 ₹9,68,14,550 | 8,90,40,831.6 ₹8,90,40,831.6 | 9,50,00,000 ₹9,50,00,000 | 10,85,86,380 ₹10,85,86,380 | 10,31,86,380 ₹10,31,86,380 | 9,75,00,000 ₹9,75,00,000 | 8,16,41,000 ₹8,16,41,000 Lowest | 10,60,86,380 ₹10,60,86,380 |
| 4.00 | Lumpsum price worked out by the contractor for "Internal Electrification", as listed in Schedule "A" Part – IV . | 1 | EACH JOB | 70,49,776.47 ₹70,49,776.47 | 95,03,100 ₹95,03,100 | 63,00,000 ₹63,00,000 | 1,19,84,367.55 ₹1,19,84,367.55 | 58,12,815 ₹58,12,815 | 59,21,812.23 ₹59,21,812.23 | 93,99,701.96 ₹93,99,701.96 | 1,02,77,035 ₹1,02,77,035 | 1,05,89,999 ₹1,05,89,999 | 99,00,000 ₹99,00,000 | 1,15,35,720 ₹1,15,35,720 | 90,34,040 ₹90,34,040 | 78,01,752.63 ₹78,01,752.63 | 82,81,580 ₹82,81,580 | 59,06,730 ₹59,06,730 | 89,29,715.95 ₹89,29,715.95 | 78,79,676.16 ₹78,79,676.16 | 93,99,701.96 ₹93,99,701.96 | 84,59,731.76 ₹84,59,731.76 | 93,99,701.96 ₹93,99,701.96 | 86,00,000 ₹86,00,000 | 79,17,368 ₹79,17,368 | 79,89,746.67 ₹79,89,746.67 | 78,50,000 ₹78,50,000 | 62,93,172 ₹62,93,172 | 93,99,701.96 ₹93,99,701.96 | 85,00,000 ₹85,00,000 | 96,63,940 ₹96,63,940 | 49,85,950 ₹49,85,950 Lowest |
| 5.00 | Lumpsum price worked out by the contractor for "Internal Water Supply", as listed in Schedule "A" Part – V . | 1 | EACH JOB | 55,47,232.23 ₹55,47,232.23 | 60,30,400 ₹60,30,400 | 90,00,000 ₹90,00,000 | 77,49,155.44 ₹77,49,155.44 | 53,39,817 ₹53,39,817 | 54,27,936.91 ₹54,27,936.91 | 59,64,765.84 ₹59,64,765.84 | 64,28,015 ₹64,28,015 | 59,64,765.84 ₹59,64,765.84 | 72,00,000 ₹72,00,000 | 42,02,460 ₹42,02,460 Lowest | 56,49,816.24 ₹56,49,816.24 | 59,64,765.84 ₹59,64,765.84 | 61,20,820 ₹61,20,820 | 62,27,960 ₹62,27,960 | 53,68,288.5 ₹53,68,288.5 | 49,40,555.9 ₹49,40,555.9 | 59,64,765.84 ₹59,64,765.84 | 53,68,289.26 ₹53,68,289.26 | 59,64,765.09 ₹59,64,765.09 | 53,00,000 ₹53,00,000 | 50,24,121 ₹50,24,121 | 60,84,061.16 ₹60,84,061.16 | 59,64,765.84 ₹59,64,765.84 | 42,19,200 ₹42,19,200 | 59,64,765.84 ₹59,64,765.84 | 65,00,000 ₹65,00,000 | 62,79,490 ₹62,79,490 | 44,56,950 ₹44,56,950 |
| 6.00 | Lumpsum price worked out by the contractor for "Sewage Disposal B/R", as listed in Schedule "A" Part – VI . | 1 | EACH JOB | 7,88,034.23 ₹7,88,034.23 | 9,40,600 ₹9,40,600 | 12,35,000 ₹12,35,000 | 10,22,463.69 ₹10,22,463.69 | 8,30,986 ₹8,30,986 | 9,00,731.6 ₹9,00,731.6 | 8,47,348.63 ₹8,47,348.63 | 8,76,255 ₹8,76,255 | 10,54,899 ₹10,54,899 | 11,70,000 ₹11,70,000 | 7,52,100 ₹7,52,100 | 8,79,421.6 ₹8,79,421.6 | 9,06,663.03 ₹9,06,663.03 | 7,80,033.81 ₹7,80,033.81 | 7,70,381.85 ₹7,70,381.85 | 7,62,613.9 ₹7,62,613.9 | 10,52,161.27 ₹10,52,161.27 | 9,74,451 ₹9,74,451 | 7,62,613.77 ₹7,62,613.77 | 8,47,348.63 ₹8,47,348.63 | 8,47,348.63 ₹8,47,348.63 | 7,13,721 ₹7,13,721 | 8,47,348.63 ₹8,47,348.63 | 8,47,348.63 ₹8,47,348.63 | 6,00,000 ₹6,00,000 Lowest | 8,47,348.63 ₹8,47,348.63 | 10,00,000 ₹10,00,000 | 8,40,529.52 ₹8,40,529.52 | 6,00,000 ₹6,00,000 Lowest |
| 7.00 | Lumpsum price worked out by the contractor for "External Water Supply", as listed in Schedule "A" Part – VII | 1 | EACH JOB | 3,72,280.86 ₹3,72,280.86 | 5,47,250 ₹5,47,250 | 6,80,000 ₹6,80,000 | 4,83,627.18 ₹4,83,627.18 | 5,86,777 ₹5,86,777 | 5,39,807.25 ₹5,39,807.25 | 3,72,280.86 ₹3,72,280.86 | 6,67,840 ₹6,67,840 | 5,99,999 ₹5,99,999 | 5,40,000 ₹5,40,000 | 4,45,100 ₹4,45,100 | 5,00,122.36 ₹5,00,122.36 | 5,84,480.95 ₹5,84,480.95 | 5,15,435 ₹5,15,435 | 4,64,855 ₹4,64,855 | 4,46,736 ₹4,46,736 | 5,62,780.7 ₹5,62,780.7 | 3,72,280.86 ₹3,72,280.86 | 3,35,052.77 ₹3,35,052.77 | 3,72,280.86 ₹3,72,280.86 | 3,72,280.86 ₹3,72,280.86 | 3,13,571 ₹3,13,571 Lowest | 3,72,280.86 ₹3,72,280.86 | 5,32,000 ₹5,32,000 | 4,91,629 ₹4,91,629 | 3,72,280.86 ₹3,72,280.86 | 6,00,000 ₹6,00,000 | 3,19,615.25 ₹3,19,615.25 | 3,35,150 ₹3,35,150 |
| 8.00 | Lumpsum price worked out by the contractor for "External Electrification", as listed in Schedule "A" Part – VIII | 1 | EACH JOB | 82,67,642.85 ₹82,67,642.85 | 1,30,68,200 ₹1,30,68,200 | 1,40,00,000 ₹1,40,00,000 | 1,30,75,593.07 ₹1,30,75,593.07 | 1,19,10,080 ₹1,19,10,080 | 1,23,43,679.67 ₹1,23,43,679.67 | 88,89,938.55 ₹88,89,938.55 | 1,36,79,130 ₹1,36,79,130 | 1,33,34,999 ₹1,33,34,999 | 1,08,00,000 ₹1,08,00,000 | 1,43,15,300 ₹1,43,15,300 | 1,10,82,700.48 ₹1,10,82,700.48 | 1,12,90,221.96 ₹1,12,90,221.96 | 1,09,75,270 ₹1,09,75,270 | 1,15,30,210 ₹1,15,30,210 | 97,78,932.41 ₹97,78,932.41 | 1,23,72,216.38 ₹1,23,72,216.38 | 88,89,938.55 ₹88,89,938.55 | 80,00,944.69 ₹80,00,944.69 | 88,89,938.55 ₹88,89,938.55 | 81,25,000 ₹81,25,000 | 74,87,994 ₹74,87,994 | 80,00,944.7 ₹80,00,944.7 | 88,89,938.55 ₹88,89,938.55 | 1,29,44,880 ₹1,29,44,880 | 88,89,938.55 ₹88,89,938.55 | 1,25,00,000 ₹1,25,00,000 | 65,90,960.77 ₹65,90,960.77 | 50,65,850 ₹50,65,850 Lowest |
| 9.00 | Lumpsum price worked out by the contractor for Roads/Paths/Hard Standing", as listed in Schedule "A" Part – IX . | 1 | EACH JOB | 69,98,196.6 ₹69,98,196.6 | 72,59,800 ₹72,59,800 | 1,00,00,000 ₹1,00,00,000 | 71,75,538.55 ₹71,75,538.55 | 74,25,000 ₹74,25,000 | 77,83,041.07 ₹77,83,041.07 | 65,40,370.65 ₹65,40,370.65 | 67,74,015 ₹67,74,015 | 78,90,899 ₹78,90,899 | 72,00,000 ₹72,00,000 | 47,97,400 ₹47,97,400 | 66,34,989 ₹66,34,989 | 69,98,196.6 ₹69,98,196.6 | 47,34,755 ₹47,34,755 | 63,10,185 ₹63,10,185 | 65,40,370 ₹65,40,370 | 66,16,957.39 ₹66,16,957.39 | 65,40,370.65 ₹65,40,370.65 | 59,48,166.66 ₹59,48,166.66 | 65,40,370.65 ₹65,40,370.65 | 59,00,000 ₹59,00,000 | 42,08,079 ₹42,08,079 Lowest | 63,44,159.53 ₹63,44,159.53 | 70,00,000 ₹70,00,000 | 65,40,370.65 ₹65,40,370.65 | 65,40,370.65 ₹65,40,370.65 | 75,00,000 ₹75,00,000 | 63,39,047.6 ₹63,39,047.6 | 47,25,650 ₹47,25,650 |
Tender Value
₹98 Cr
EMD Value
₹15 L
Closing Date
14 Nov 2025, 6:00 pmClosed
CHIEF ENGINEER NAVY VISAKHAPATNAM
CHIEF ENGINEER NAVY STATION ROAD VISAKHAPATNAM
PROVISION OF DEFICIENT OFFICERS MARRIED ACCOMMODATION FOR OFFICERS LT CDR AND ABOVE AT NORA VISAKHAPATNAM
2025_MES_733694_1
85458
Open Tender
Civil Works
Lump-sum
730 days
VISAKHAPATNAM
AS PER TENDER DOCUMENTS
7 documents required · 7 mandatory
₹3,000
GE P No3 Visakhapatnam
₹15 L
Yes
30 Mar 2026
4 Oct 2025
21 Nov 2025
4 Oct 2025
14 Nov 2025
7 Nov 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.1 | Schedule "A" Part – I to Schedule "A" Part – XIX:
NOTE: Schedule "A" Part – I to Part – XIX are prepriced by MES. Bidders shall insert their Lumpsum amount in Green coloured field under Column - 6 only | - | - | - | - |
| 1 | Lumpsum price worked out by the contractor for "Buildings & Structures", as listed in Schedule "A" Part – I . | 1 | EACH JOB | 76,42,70,000 | ₹76,42,70,000 |
| - | Lumpsum price worked out by the contractor for "Site Clearance / Earthwork/ Excavation", as listed in Schedule "A" Part – III . | 1 | EACH JOB | 29,16,547.78 | ₹29,16,547.78 |
| - | Lumpsum price worked out by the contractor for "Pile foundation", as listed in Schedule "A" Part – III | 1 | EACH JOB | 21,86,69,543.24 | ₹21,86,69,543.24 |
| - | Lumpsum price worked out by the contractor for "Internal Electrification", as listed in Schedule "A" Part – IV . | 1 | EACH JOB | 68,68,785.2 | ₹68,68,785.2 |
| - | Lumpsum price worked out by the contractor for "Internal Water Supply", as listed in Schedule "A" Part – V . | 1 | EACH JOB | 59,64,765.84 | ₹59,64,765.84 |
| - | Lumpsum price worked out by the contractor for "Sewage Disposal B/R", as listed in Schedule "A" Part – VI . | 1 | EACH JOB | 8,47,005.84 | ₹8,47,005.84 |
| - | Lumpsum price worked out by the contractor for "External Water Supply", as listed in Schedule "A" Part – VII | 1 | EACH JOB | 3,72,280.86 | ₹3,72,280.86 |
| - | Lumpsum price worked out by the contractor for "External Electrification", as listed in Schedule "A" Part – VIII | 1 | EACH JOB | 88,92,480.96 | ₹88,92,480.96 |
| - | Lumpsum price worked out by the contractor for Roads/Paths/Culverts", as listed in Schedule "A" Part – IX . | 1 | EACH JOB | 65,40,370.65 | ₹65,40,370.65 |
stage.html
html • 0.13 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.96 MB
tender.pdf
Tender Documents • 2.75 MB
BOQ_821503.xls
BOQ • 0.39 MB
schedules.pdf
Additional Documents • 0.59 MB
STRLDRGS.rar
Additional Documents • 7.46 MB
ARCH.rar
PDF • 17.96 MB
85458AMDT.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .