Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹3.3 L
Closing Date
16 Sept 2026, 11:00 am
Director WB and Sikkim GD Survey of India Kolkata
Director WB Sikkim GD Survey of India Kolkata
Request for Proposal for providing Services for 2D 3D Mapping of Urban Areas in West Bengal using Aerial Platform Manned Unmanned fitted onboard with Multi angle 4 oblique and 1 Nadir camera
2026_SOI_922367_1
T- 808 /44-Q-3-Project (NAKSHA - DILRMP)
Open Tender
Miscellaneous Services
Item Rate
WB and Sikkim GD 13 Wood Street Kolkata
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹3.3 L
Yes
Kolkata
18 Aug 2026
18 Aug 2026
17 Sept 2026
18 Aug 2026
16 Sept 2026
27 Aug 2026
19 Aug 2026 - 24 Aug 2026
25 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Project Planning and Mobilization | 200 | Three | - | - |
| 1.01 | Successful Work Plan Submission within 3 days of signing of Contracts/Work Order. | 200 | Three | - | - |
| 1.02 | Work plan should contain planning of control work and methodology (Control points, check points, flight planning, block diagram with overlap area- example is enclosed as Annexure- 55) | 200 | Three | - | - |
| 2 | Data acquisition and processing for generation of 2(a) ORI/ DSM/ 3D Model. 2(b) DTM | 200 | Three | - | - |
| 2.1 | Data acquisition and processing for generation of ORI, DSM and 3D Mesh model within 02 months from completion of 1st work milestone. | 200 | Three | - | - |
| 2.2 | processing for generation of DTM within 03 months from completion of 1st work milestone. | 200 | Three | - | - |
| 3 | 3rd work milestone should be Feature extraction for generation of GIS layers. 3(a) Delivery of final 2D FE data 3(b) Delivery of final 3d FE with horizontal and vertical slicing. | 200 | Three | - | - |
| 3.1 | Feature extraction for generation of GIS layers and final delivery of 2D FE data within 03 months from completion of 1st work milestone. | 200 | Three | - | - |
| 3.2 | Feature extraction for generation of 3D GIS layers and final delivery of 3D FE data within 05 months from completion of 1st work milestone. | 200 | Three | - | - |
| 4 | Reporting, Documentation, and Final Acceptance | 200 | Three | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BOQ_969289.xls
BOQ • 0.39 MB
FINAL_NAKSHA_WB_RFP.pdf
Tender Documents • 2.67 MB
CORRIGENDUM-2.pdf
PDF • 0.12 MB
CORRIGENDUM-1-Pre-Bid-Meeting-Mode.pdf
PDF • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].