Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-AOC 00 NEAR SHIV MANDIR NASIRABAD MILAK RAMPUR UTTAR PRADESH 243701 | 243701 | L1 | Accepted-AOC 1st | |
| 2 | L2₹5.4 L+₹150.40 (0.03%)Rejected-AOC 0 MAIN ROAD MAIN ROAD MILAK RAMPUR UTTAR PRADESH 244901 | RAMPUR | UTTAR PRADESH | 244901 | L2 | Rejected-AOC 2nd | |
| 3 | L3₹5.4 L+₹162.08 (0.03%)Rejected-AOC | L3 | Rejected-AOC 3rd |
| Sl No | Description | Qty | Unit | Sangam Construction L1 | M/S GANGWAR ELECTRICALS L2 | Kumar Trading Compony L3 |
|---|---|---|---|---|---|---|
| 1.00Ward 13 me Saha navi ke makan se liyakat ke makan tak CC tiles interlocking Road va nali nirman karya (As per Estimate) | ||||||
| 1.01 | Earth work in foundation or embankment in ordinary soil including earth from 5 km to the site. chap‑04 sr no.251 | 29.35 | Cum | 200 ₹5,870 Lowest | 200 ₹5,870 Lowest | 200 ₹5,870 Lowest |
| 1.02 | Cement concrete with 4 cm gauge brick ballast with fine sand of 1.25 FM and cement in 1:2:6:1 stone including labour material T&P incl all compl. (SR NO.273) | 6.38 | Cum | 3,650 ₹23,287 Lowest | 3,650 ₹23,287 Lowest | 3,650 ₹23,287 Lowest |
| 1.03 | M‑150 brick work in 1:4 cement and coarse sand mortar including all cost of materials labour and T&P etc required for proper completion of work sr no.305 | 11.55 | Cum | 5,110 ₹59,020.5 Lowest | 5,110 ₹59,020.5 Lowest | 5,110 ₹59,020.5 Lowest |
| 1.04 | 12 mm thick plaster in 1:4 cement coarse sand and mortar over brick work including all cost of materials labour and T&P etc required for proper completion of work (sr no.581) | 99 | sqm | 245 ₹24,255 Lowest | 245 ₹24,255 Lowest | 245 ₹24,255 Lowest |
| 1.05 | Concrete with 2 cm gauge stone ballast coarse sand of 1.25 FM and cement proportion of 1:4:2:1 including supply of all materials labour and T&P etc required for proper completion of work (279) | 0.96 | Cum | 7,600 ₹7,296 Lowest | 7,600 ₹7,296 Lowest | 7,600 ₹7,296 Lowest |
| 1.06 | Concrete with 4 cm gauge stone ballast with fine sand of 2.25 FM and cement in 1:2:6:1 in foundation including supply labour material T&P incl all compl. (SR NO.273) | 32.45 | Cum | 3,650 ₹1,18,442.5 Lowest | 3,650 ₹1,18,442.5 Lowest | 3,650 ₹1,18,442.5 Lowest |
| 1.07 | Providing & fixing or interlocking CC tiles 80 mm thick M‑30 grade over 20 to 40 mm sand layer and joint filled by dry fine sand including all cost of labour T&P etc complete | 324.5 | Sqm | 875 ₹2,83,937.5 Lowest | 875 ₹2,83,937.5 Lowest | 875 ₹2,83,937.5 Lowest |
| 1.08 | RCC work 1:1.5:3 with cement approved coarse sand & 20 mm gauge stone grit etc including centering & shuttering etc all compl of work (SI no.283) | 0.92 | Cum | 8,000 ₹7,360 Lowest | 8,100 ₹7,452 | 8,100 ₹7,452 |
| 1.09 | Mild steel or iron work in plain work such as RCC or RB work including cutting, bending for proper shape and including supply of steel and its wastage & authorised overlapping etc shall be measured (SI no.504) | 0.73 | Qtl | 7,700 ₹5,621 Lowest | 7,780 ₹5,679.4 | 7,796 ₹5,691.08 |
Tender Value
₹7.3 L
EMD Value
₹14,700
Closing Date
15 May 2026, 3:00 pmClosed
EO NPP Bilaspur
Office NPP Bilaspur
Ward 13 me Saha navi ke makan se liyakat ke makan tak CC tiles interlocking Road va nali nirman karya (As per Estimate)
2026_DOLBU_1143839_1
17/nppb/2025-2026/15vanvit-12
Open Tender
Civil Works
Item Wise
120 days
Bilaspur
Please refer Tender documents.
2 documents required · 2 mandatory
₹826
Executive Officer
₹14,700
25 May 2026
30 Apr 2026
15 May 2026
30 Apr 2026
15 May 2026
30 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Ward 13 me Saha navi ke makan se liyakat ke makan tak CC tiles interlocking Road va nali nirman karya (As per Estimate) | |||||
| 1.01 | Earth work in foundation or embankment in ordinary soil including earth from 5 km to the site. chap‑04 sr no.251 | - | Cum | 200 | - |
| 1.02 | Cement concrete with 4 cm gauge brick ballast with fine sand of 1.25 FM and cement in 1:2:6:1 stone including labour material T&P incl all compl. (SR NO.273) | 1 | Cum | 3,650 | ₹3,646.35 |
| 1.03 | M‑150 brick work in 1:4 cement and coarse sand mortar including all cost of materials labour and T&P etc required for proper completion of work sr no.305 | - | Cum | 5,110 | - |
| 1.04 | 12 mm thick plaster in 1:4 cement coarse sand and mortar over brick work including all cost of materials labour and T&P etc required for proper completion of work (sr no.581) | - | sqm | 245 | - |
| 1.05 | Concrete with 2 cm gauge stone ballast coarse sand of 1.25 FM and cement proportion of 1:4:2:1 including supply of all materials labour and T&P etc required for proper completion of work (279) | - | Cum | 7,600 | - |
| 1.06 | Concrete with 4 cm gauge stone ballast with fine sand of 2.25 FM and cement in 1:2:6:1 in foundation including supply labour material T&P incl all compl. (SR NO.273) | - | Cum | 3,650 | - |
| 1.07 | Providing & fixing or interlocking CC tiles 80 mm thick M‑30 grade over 20 to 40 mm sand layer and joint filled by dry fine sand including all cost of labour T&P etc complete | - | Sqm | 875 | - |
| 1.08 | RCC work 1:1.5:3 with cement approved coarse sand & 20 mm gauge stone grit etc including centering & shuttering etc all compl of work (SI no.283) | - | Cum | 8,100 | - |
| 1.09 | Mild steel or iron work in plain work such as RCC or RB work including cutting, bending for proper shape and including supply of steel and its wastage & authorised overlapping etc shall be measured (SI no.504) | - | Qtl | 7,796 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.11 MB
BOQ_2136931.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .