| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | L1 | Accepted-AOC Agreement Executed and work awarded | |
| 2 | Rejected-Technical SANTHOSH BHAVAN PADAMUGAL KOCHI PIN 682030 | KOCHI | ERNAKULAM | KERALA | 682030 | - | Rejected-Technical Lowest Bid Accepted | |
| 3 | Rejected-Technical KUPPOL PERINGOME PO 670353 | PERINGOME | KANNUR | KERALA | 670353 | - | Rejected-Technical Lowest Bid Accepted | |
| 4 | Rejected-Technical KANNUR | KERALA | 670001 | - | Rejected-Technical Lowest Bid Accepted |
Tender Value
₹6.0 L
EMD Value
₹15,100
Closing Date
20 Sept 2023, 5:00 pmClosed
Executive Engineer
Office of the Executive Engineer,Regional Investigation and Quality Control Laboratory, Kozhikode
Subsoil Investigation, Traffic Survey, Inventory Survey etc
2023_PWD_602794_1
D4/Tender-05/INV/KKD/2023-24 Dated 15/09/2023
Open Tender
Civil Works - Others
Item Rate
60 days
MADAKKAL BRIDGE ACROSS VALIYAPARAMBA BACK WATER IN
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,430
Yes
₹15,100
Yes
23 Nov 2023
15 Sept 2023
23 Sept 2023
15 Sept 2023
20 Sept 2023
15 Sept 2023
Amount
Subsoil Investigation
56.1.a -Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring
56.17.1 Providing access to the site, clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing
56.2.a Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring.
56.3.a.1 Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.- In land
56.3.b.1 Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.c.1 Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.d.1 Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata above 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. Above 30m 5
56.5.a Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land
56.4 Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river.
56.7 Conducting standard penetration test in bore hole at any depth.
56.8 Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.6 Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.
56.11.a Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes.
56.11.c Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring - Extra for additional set for bore holes exceeding 5 nos.
OD72220/2023-2024 Conducting origin destination survey at one location for one day for peak hours (7am to 11 am and 3.30 pm to 7.30 pm) by recording the pedestrian count in the prescribed format, including provision for engaging technicians and setting up of station etc and compiling the data and submitting the details inhard and soft copy
OD72249/2023-2024 Data for inventory survey upto 12 meter wide road for survey work of collecting road inventories and recording in prescribed format attached based on chainage marking including marking chainage at 50m interval and taking details such as existing carriageway width,shoulder width, Type of shoulder ,width and location of approach road ,details of existing drains,culverts and bridges as given in the format attched,pavement conditions(details of potholes, raveling, fog seal,slurry seal edge damage etc)raod safety measures (details of road sign,crash barriers,guard stones,delineator post, hazard markers etc) and all other existing retaining structures in road,including documentation charges etc as per direction of the officers at site
OD72265/2023-2024 Study of pavement composition by cutting open pit at tar edge to get the details of layers (thickness and type ) of pavement composition - at one location as suggested by the engineer in charge carefully by excavating pit of area 1.00x 0.60m through overlaying bituminous and granular layer including BC, DBM/BM, WMM and GSB at tar edge and refilling and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officers at site and reporting the pavement composition with photographs and measurements specifying the type of layers
OD72300/2023-2024 Collection of sub-grade soil sample at 500m interval carefully by excavating pit of area 1.0*0.6m through overlying bituminous and granular layer or from subgrade of formation area as directed by the engineer in charge for laboratory test and filling back and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officer at site
OD72301/2023-2024 Conducting Soil Classification test, Standard Proctor Test,and CBR test as per the IS Code guidelines and making report of one soil sample
AA AND S CONSTRUCTIONS
MOHANAN P
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_897033.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .