Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.2 LAdmitted-Finance INDRA AWAS COLONY SANWASA TEHSIL LALSOT DISTRICT DAUSA RAJASTHAN | -21.21% | ₹14.2 L | L1 | Admitted-Finance |
| 2 | L2₹15.5 L+₹1.3 L (9.33%)Admitted-Finance | -13.86% | ₹15.5 L+₹1.3 L (9.33%) | L2 | Admitted-Finance |
| 3 | L3₹16.3 L+₹2.1 L (15.0%)Admitted-Finance | -9.40% | ₹16.3 L+₹2.1 L (15.0%) | L3 | Admitted-Finance |
| 4 | L4₹17.3 L+₹3.1 L (21.8%)Admitted-Finance | -4.01% | ₹17.3 L+₹3.1 L (21.8%) | L4 | Admitted-Finance |
Tender Value
₹18.0 L
EMD Value
₹35,980
Closing Date
1 Jul 2026, 6:00 pmClosed
Executive Engineer RSAMB Div Kota
Executive Engineer RSAMB Div Kota
Developing Athletic Track at Govt. College, Bundi
2026_RSAMB_571305_16
Nit No 05/2026-27 EE RSAMB Div Kota
Open Tender
Civil Works
Percentage
120 days
KOTA
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
RTGS/NEFT/Any other money Transfer System
₹35,980
Yes
7 Jul 2026
27 Jun 2026
3 Jul 2026
27 Jun 2026
1 Jul 2026
27 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Embankment with Material Obtained from Borrow Pits | - | - | - | - |
| - | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | 9,315 | Cum | 58 | ₹5,40,270 |
| - | Fillling in foundation trenches as per drawing and MoRTH specification Clause 304.3.7 Sand filling | 154 | Cum | 946 | ₹1,45,684 |
| - | Supply & Stacking good soil of earth at site complete including loading unloading & Transportation etc. | 102 | Cum | 240 | ₹24,480 |
| - | Spreading of manure , good earth in required thickness (cost of manure and good earth to be separately ) | 256 | Cum | 24 | ₹6,144 |
| - | Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. | 63 | Cum | 178 | ₹11,214 |
| - | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104
P.C.C grade M 10 Nominal mix 1:3:6 | 32 | Cum | 3,091 | ₹98,912 |
| - | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104
P.C.C. grade M 20 | 54 | Cum | 3,515 | ₹1,89,810 |
| - | Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and MoRTH Specification Clause 801 | 252 | Sqm | 82 | ₹20,664 |
| - | Carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete.
Earth, Sand, Lime, Morrum manure or sludge
For Lead upto 10 Km | 9,315 | Cum | 81.75 | ₹7,61,501.25 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.10 MB
Tendernotice_2.pdf
PDF • 0.14 MB
Tendernotice_3.pdf
PDF • 0.87 MB
16Agreement.pdf
Tender Documents • 0.82 MB
BOQ_1016909.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .