Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.5 L+₹23,000 (9.96%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
13 Mar 2024, 3:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
NITHIN C S
SM (P and P)-CD
Handling of Slip Plates and Slip Rings in SA Plant during ATA 2024, FACT-CD.
2024_FACT_797658_1
04097/2023-2024/E29038
Limited
Miscellaneous Works
Item Rate
35 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD)
4 documents required · 4 mandatory
₹0
₹5,000
Yes
6 Apr 2024
27 Feb 2024
14 Mar 2024
27 Feb 2024
13 Mar 2024
27 Feb 2024
Handling of Slip Plates & Slip Rings in SA Plant during ATA 2024, FACT-CD.
Removing the slip ring and fixing the slip plate and opening the dummy in 1800 mm dia gas duct (4th bed inlet) during shutdown
Removing the slip plate and fixing the slip ring and closing the dummy in the above duct during start up using sulphur
Removing the slip ring & Fixing slip plate in 1800 mm dia duct (W4 outlet) during RLNG startup
Removing slip plate & fixing the slip ring in 1800 mm dia duct (W4 outlet) during startup using sulphur
Removing the slip ring & Fixing slip plate in 1800 mm dia duct (W6 outlet) during RLNG startup
Removing slip plate & fixing the slip ring in 1800 mm dia duct (W6 outlet) during startup using sulphur gun
Providing vent in bottom manhole of W4 during start up using RLNG
Removal of vent in bottom manhole of W4 during start up using sulphur gun
Providing vent in bottom manhole of W5 during start up using RLNG
Removal of vent in bottom manhole of W5 during start up nusing sulphur gun
Providing vent in bottom manhole of W6 during start up using RLNG
Removal of vent in bottom manhole of W6 during start up nusing sulphur gun
Providing vent in bottom manhole of W3 during start up using RLNG
Removal of vent in bottom manhole of W3 during start up nusing sulphur guned.
Removing slip plates in the hot air valves in the duct from 1st bed to 4th bed (2 no) and fixing slip ring during shutdown.
Fixing back the slip plates in the hot air valves in the duct from 1st bed to 4th bed (2 no) with out leak during start up using sulphur
Removing the slip ring and fixing the slip plate in 1800 mm dia gas duct (First bed inlet) during RLNG start up
Removing the slip plate and fixing the slip ring in the above duct during catalyst heating start up
HASSAN MM
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_838453.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .