| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.2 LAccepted-Finance | ₹28.2 L | L1 | Accepted-Finance Quoted lowest amount. |
| 2 | L2₹28.2 L+₹8,797.95 (0.31%)Rejected-Finance 1103 ARUNAACHAL BUILDING 19 BARAKHAMBA ROAD NEW DELHI 110001 | NEW DELHI | DELHI | 110001 | ₹28.2 L+₹8,797.95 (0.31%) | L2 | Rejected-Finance Quoted higher amount than L1. |
| 3 | L3₹29.5 L+₹1.4 L (4.88%)Rejected-Finance B 3 KRISHNA PARK SOCIETY SAI CHOKDI MANJALPUR VADODARA 390011 | VADODARA | GUJARAT | 390011 | ₹29.5 L+₹1.4 L (4.88%) | L3 | Rejected-Finance Quoted higher amount than L1. |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically disqualified because affidavite and visited site certificate not as per ATC |
| Sl No | Description | Qty | Unit | OM SAI INFRASTRUCTURE L3 | sovereign enterprise L2 | ABHUJI PANAJI VANZARA L1 |
|---|---|---|---|---|---|---|
| 1.00Execution of work under following items | ||||||
| 1.01 | Towards the cost and supply of lime in air tight plastic bag including all cost of transportation up to site. Loading, unloading etc. all complete as directed by site in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 6,612.27 | Kg | 13 ₹85,959.51 | 12 ₹79,347.24 Lowest | 12 ₹79,347.24 Lowest |
| 1.02 | Towards the cost and supply of well burnt thin bricks of “220 x105 x 45 mm” size including all cost of transportation up to site, loading, unloading etc. all complete and as directed by site in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 15,251 | Nos. | 14 ₹2,13,514 | 14 ₹2,13,514 | 13 ₹1,98,263 Lowest |
| 1.03 | Towards the cost and supply of gud (jaggery) including all cost of transportation up to site. Loading, unloading etc. all complete as directed by site in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 36.09 | Kg | 95 ₹3,428.55 | 95 ₹3,428.55 | 90 ₹3,248.1 Lowest |
| 1.04 | Towards the cost and supply of gallnut including all cost of transportation up to site. Loading, unloading etc. all complete as directed by site in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 233.09 | Kg | 280 ₹65,265.2 | 200 ₹46,618 Lowest | 250 ₹58,272.5 |
| 1.05 | Towards the cost and supply of dhrangadhra stone blocks of different size including all cost of transportation up to site. Loading, unloading etc. all complete as directed by site in-charge.
Average size:
1. 0.60 to 1.00 x 0.20 to 0.30 x 0.20 to 0.35
2. 0.40 to 0.45 x 0.50 to 0.55 x 0.35 to 0.40
3. 1.05 to 1.10 x 0.30 to 0.35 x 0.40 to 0.45
4. 2.50 to 2.60 x 0.45 to 0.50 x 0.40 to 0.45
Actual size of stone will be provided by the CA, Ahmedabad at the time of commencement of work. (Including all the materials & labour charges etc. complete as direction by site in charge) | 77.99 | Cu.mt. | 16,900 ₹13,18,098.6 | 16,000 ₹12,47,904 Lowest | 16,000 ₹12,47,904 Lowest |
| 1.06 | Towards the cost and supply of tractor trip on rent including driver and fuel etc. complete for disposal of debris up to 10 km away from site including loading, unloading etc. all complete as directed by site in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 3 | Trip | 900 ₹2,700 | 850 ₹2,550 Lowest | 850 ₹2,550 Lowest |
| 1.07 | Towards removal of cement concrete floor laid in place of stone flooring with original bed concrete including stacking of useful material & disposing of rubbish etc. all complete and as directed by site in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 76.65 | Cu.mt. | 1,820 ₹1,39,503 | 1,820 ₹1,39,503 | 1,800 ₹1,37,970 Lowest |
| 1.08 | Towards laying of cement concrete bed using 1:3:6(1: cement, 3: sand, 6: course aggregate) with proper mixing, laying, consolidation including all cost of materials and labour charges etc. all complete as per specifications and as directed by site in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 34.88 | Cu.mt. | 7,250 ₹2,52,880 | 6,500 ₹2,26,720 Lowest | 7,200 ₹2,51,136 |
| 1.09 | Towards laying of stone flooring using 10 cm thick dhragadhra stone block of average size 0.60x 0.45 x 0.10 in L.S.S. mortar 1:1:1 (1 lime : 1 sand, 1: surkhi )including cost of all materials and labour charges etc. all complete and as directed by site in-charge (Including all the materials & labour charges etc. complete as direction by site in charge) | 34.88 | Cu.mt. | 25,000 ₹8,72,000 | 24,800 ₹8,65,024 | 24,000 ₹8,37,120 Lowest |
Tender Value
₹27.0 L
EMD Value
₹67,387
Closing Date
16 Jun 2026, 2:00 pmClosed
Superintending Archaeologist
Superintending Archaeologist, Puratattva Bhavan, Nr Central Library, Mandvi, Vadodara
Towards the cost and supply of lime in air tight plastic bag, gud (jaggery) , gallnut, dhrangadhra stone blocks of different size, removal of cement concrete floor laid in place of stone flooring with original bed concrete ,etc. as mentioned in BoQ.
2026_ASI_911234_1
97/TKAV/AHD/2025-26-C-944
Open Tender
Civil Works
Works
120 days
Ahmedabad
Please refer tender documents
8 documents required · 8 mandatory
₹0
₹67,387
Yes
22 Jun 2026
2 Jun 2026
17 Jun 2026
2 Jun 2026
16 Jun 2026
2 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Execution of work under following items | |||||
| 1.01 | Towards the cost and supply of lime in air tight plastic bag including all cost of transportation up to site. Loading, unloading etc. all complete as directed by site in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 6,612.27 | Kg | 10.5 | ₹69,428.84 |
| 1.02 | Towards the cost and supply of well burnt thin bricks of “220 x105 x 45 mm” size including all cost of transportation up to site, loading, unloading etc. all complete and as directed by site in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 15,251 | Nos. | 8.96 | ₹1,36,648.96 |
| 1.03 | Towards the cost and supply of gud (jaggery) including all cost of transportation up to site. Loading, unloading etc. all complete as directed by site in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 36.09 | Kg | 105 | ₹3,789.45 |
| 1.04 | Towards the cost and supply of gallnut including all cost of transportation up to site. Loading, unloading etc. all complete as directed by site in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 233.09 | Kg | 210 | ₹48,948.9 |
| 1.05 | Towards the cost and supply of dhrangadhra stone blocks of different size including all cost of transportation up to site. Loading, unloading etc. all complete as directed by site in-charge.
Average size:
1. 0.60 to 1.00 x 0.20 to 0.30 x 0.20 to 0.35
2. 0.40 to 0.45 x 0.50 to 0.55 x 0.35 to 0.40
3. 1.05 to 1.10 x 0.30 to 0.35 x 0.40 to 0.45
4. 2.50 to 2.60 x 0.45 to 0.50 x 0.40 to 0.45
Actual size of stone will be provided by the CA, Ahmedabad at the time of commencement of work. (Including all the materials & labour charges etc. complete as direction by site in charge) | 77.99 | Cu.mt. | 15,750 | ₹12,28,405.5 |
| 1.06 | Towards the cost and supply of tractor trip on rent including driver and fuel etc. complete for disposal of debris up to 10 km away from site including loading, unloading etc. all complete as directed by site in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 3 | Trip | 826 | ₹2,478 |
| 1.07 | Towards removal of cement concrete floor laid in place of stone flooring with original bed concrete including stacking of useful material & disposing of rubbish etc. all complete and as directed by site in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 76.65 | Cu.mt. | 1,770 | ₹1,35,670.5 |
| 1.08 | Towards laying of cement concrete bed using 1:3:6(1: cement, 3: sand, 6: course aggregate) with proper mixing, laying, consolidation including all cost of materials and labour charges etc. all complete as per specifications and as directed by site in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 34.88 | Cu.mt. | 5,900 | ₹2,05,792 |
| 1.09 | Towards laying of stone flooring using 10 cm thick dhragadhra stone block of average size 0.60x 0.45 x 0.10 in L.S.S. mortar 1:1:1 (1 lime : 1 sand, 1: surkhi )including cost of all materials and labour charges etc. all complete and as directed by site in-charge (Including all the materials & labour charges etc. complete as direction by site in charge) | 34.88 | Cu.mt. | 24,780 | ₹8,64,326.4 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.39 MB
vatva.pdf
Tender Documents • 3.38 MB
BOQ_957674.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .