| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.5 LAccepted-AOC Q VILLAGE RASIDPUR P O KHANPUR TEHSIL NARAINGARH 134201 | NARAINGARH | AMBALA | HARYANA | 134201 | 1 | Accepted-AOC alloted | |
| 2 | 2₹11.4 L+₹87,185.61 (8.27%)Rejected-Finance VPO PANOH TEHSIL DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | 2 | Rejected-Finance L2 | |
| 3 | 3₹12.0 L+₹1.5 L (14.1%)Rejected-Finance | 3 | Rejected-Finance L3 | |
| 4 | 4₹12.2 L+₹1.7 L (15.9%)Rejected-Finance BHUD BHUD 134203 | BHUD | AMBALA | HARYANA | 134203 | 4 | Rejected-Finance L4 | |
| 5 | 5₹12.6 L+₹2.0 L (19.1%)Rejected-Finance | 5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | ANURAG L10 | HIMANSHU RANJAN L5 | Suresh Kumar Govt Contractor L2 | Amit Kumar Contractor L7 | Vikram Singh Govt. Cont. L6 | The Deep Co op Society L4 | Vikas Constructions And Engineers L9 | MAA SHAKUMBARI TRADERS L8 | Sh.Surjeet Singh Contractor L3 | The Hindustan Co-op Society L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | [HSR 10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [HSR Through Rate] | 28.42 | cum | 1,811.2 ₹51,474.3 | 2,400 ₹68,208 | 1,490 ₹42,345.8 | 2,200 ₹62,524 | 1,760 ₹50,019.2 | 1,600 ₹45,472 | 1,882 ₹53,486.44 | 1,792.2 ₹50,934.32 | 1,863 ₹52,946.46 | 850 ₹24,157 Lowest |
| 2.00 | [HSR 11.5.4]12 mm cement plaster of mix : 4. 1:6 (1 cement: 6 fine sand) [HSR Through Rate] | 244.34 | Sqm | 101 ₹24,678.34 | 70 ₹17,103.8 | 83 ₹20,280.22 | 70 ₹17,103.8 | 64 ₹15,637.76 Lowest | 101 ₹24,678.34 | 72.2 ₹17,641.35 | 100 ₹24,434 | 104 ₹25,411.36 | 100 ₹24,434 |
| 3.00 | [HSR 11.6.2]15 mm cement plaster on the rough side of single or half brick wall of mix : 2. 1:6 (1 cement: 6 fine sand) [HSR Through Rate] | 213.79 | Sqm | 123 ₹26,296.17 | 70 ₹14,965.3 Lowest | 98 ₹20,951.42 | 75 ₹16,034.25 | 81 ₹17,316.99 | 101 ₹21,592.79 | 90.2 ₹19,283.86 | 122 ₹26,082.38 | 127 ₹27,151.33 | 100 ₹21,379 |
| 4.00 | [HSR 11.60]Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. [HSR Through Rate] | 458.13 | Sqm | 57 ₹26,113.41 | 50 ₹22,906.5 | 47 ₹21,532.11 | 36 ₹16,492.68 | 55.5 ₹25,426.22 | 51 ₹23,364.63 | 56.7 ₹25,975.97 | 57 ₹26,113.41 | 59 ₹27,029.67 | 35 ₹16,034.55 Lowest |
| 5.00 | [HSR 11.67.1]Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : 1. Water thinnable cement primer [HSR Through Rate] | 458.13 | Sqm | 21 ₹9,620.73 | 25 ₹11,453.25 | 18 ₹8,246.34 | 42 ₹19,241.46 | 21 ₹9,620.73 | 21 ₹9,620.73 | 18.75 ₹8,589.94 | 21 ₹9,620.73 | 22 ₹10,078.86 | 15 ₹6,871.95 Lowest |
| 6.00 | [HSR 11.95.1]Finishing walls with Acrylic Smooth exterior paint of required shade : 1. New work (Two or more coat applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) [HSR Through Rate] | 458.13 | Sqm | 86 ₹39,399.18 | 70 ₹32,069.1 | 70 ₹32,069.1 | 66 ₹30,236.58 | 83 ₹38,024.79 | 82 ₹37,566.66 | 93.1 ₹42,651.9 | 85 ₹38,941.05 | 88 ₹40,315.44 | 50 ₹22,906.5 Lowest |
| 7.00 | [HSR 4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [HSR Through Rate] | 196.66 | cum | 81 ₹15,929.46 | 50 ₹9,833 | 62 ₹12,192.92 | 70 ₹13,766.2 | 78.5 ₹15,437.81 | 70 ₹13,766.2 | 70.35 ₹13,835.03 | 80 ₹15,732.8 | 83 ₹16,322.78 | 45 ₹8,849.7 Lowest |
| 8.00 | [HSR 6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [HSR Through Rate] | 107.68 | cum | 4,251.08 ₹4,57,756.29 | 4,200 ₹4,52,256 | 3,500 ₹3,76,880 | 4,000 ₹4,30,720 | 4,134 ₹4,45,149.12 | 3,300 ₹3,55,344 Lowest | 4,500.1 ₹4,84,570.77 | 4,206.08 ₹4,52,910.69 | 3,500 ₹3,76,880 | 3,500 ₹3,76,880 |
| 9.00 | [HSR 6.2.1]Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor four level, excluding the cost of centering, shuttering and finishing: 1. 1:1½:3 (1 cement : 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). [HSR Through Rate] | 10.17 | cum | 3,869.22 ₹39,349.97 | 4,000 ₹40,680 | 3,185 ₹32,391.45 | 4,200 ₹42,714 | 3,763 ₹38,269.71 | 3,400 ₹34,578 | 4,036.05 ₹41,046.63 | 3,829.22 ₹38,943.17 | 3,981 ₹40,486.77 | 3,000 ₹30,510 Lowest |
| 10.00 | [HSR 6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [HSR Through Rate] | 8,838.75 | Kg. | 64 ₹5,65,680 | 55 ₹4,86,131.25 | 53 ₹4,68,453.75 | 64 ₹5,65,680 | 57.4 ₹5,07,344.25 | 61 ₹5,39,163.75 | 61.6 ₹5,44,467 | 63 ₹5,56,841.25 | 55 ₹4,86,131.25 | 50 ₹4,41,937.5 Lowest |
Tender Value
₹14.3 L
EMD Value
₹28,600
Closing Date
4 Nov 2024, 5:00 pmClosed
AMIT MALIK
PD Naraingarh
Construction of Boundary wall
2024_HRY_407048_1
202447F3369E 33A7 4653 A868 03B8EB2C917B617BAR
Open Tender
Civil Works
Works
90 days
BARWALA
4 documents required · 4 mandatory
₹1,000
₹28,600
Yes
15 Oct 2025
25 Oct 2024
5 Nov 2024
25 Oct 2024
4 Nov 2024
25 Oct 2024
Amount
[HSR 10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [HSR Through Rate]
[HSR 11.5.4]12 mm cement plaster of mix : 4. 1:6 (1 cement: 6 fine sand) [HSR Through Rate]
[HSR 11.6.2]15 mm cement plaster on the rough side of single or half brick wall of mix : 2. 1:6 (1 cement: 6 fine sand) [HSR Through Rate]
[HSR 11.60]Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. [HSR Through Rate]
[HSR 11.67.1]Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : 1. Water thinnable cement primer [HSR Through Rate]
[HSR 11.95.1]Finishing walls with Acrylic Smooth exterior paint of required shade : 1. New work (Two or more coat applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) [HSR Through Rate]
[HSR 4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [HSR Through Rate]
[HSR 6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [HSR Through Rate]
[HSR 6.2.1]Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor four level, excluding the cost of centering, shuttering and finishing: 1. 1:1½:3 (1 cement : 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). [HSR Through Rate]
[HSR 6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [HSR Through Rate]
[HSR 7.21.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [HSR Through Rate]
Suresh Kumar Govt Contractor (BID ID -1161887)
Sh.Surjeet Singh Contractor (BID ID -1159164)
The Deep Co op Society (BID ID -1159741)
HIMANSHU RANJAN (BID ID -1161386)
Vikram Singh Govt. Cont. (BID ID -1162383)
Amit Kumar Contractor (BID ID -1160846)
MAA SHAKUMBARI TRADERS (BID ID -1161184)
Vikas Constructions And Engineers (BID ID -1160777)
ANURAG (BID ID -1162403)
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .