Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹28.4 LAdmitted-Finance AT PANDVADEVI POST POYNAD TAL ALIBAG DIST RAIGAD 402201 | ALIBAG | RAIGAD | MAHARASHTRA | 402201 | -23.23% | ₹28.4 L | L1 | Admitted-Finance |
| 2 | L2₹28.6 LAdmitted-Finance D 7 S NO 14 3 JAIBHAVANINAGAR THERGAON | -22.66% | ₹28.6 L | L2 | Admitted-Finance |
| 3 | L3₹29.2 LAdmitted-Finance AT POST KHERDI TAL CHIPLUN DIST RATNAGIRI | CHIPLUN | RATNAGIRI | MAHARASHTRA | -20.77% | ₹29.2 L | L3 | Admitted-Finance |
| 4 | L4₹30.9 LAdmitted-Finance | -16.01% | ₹30.9 L | L4 | Admitted-Finance |
| 5 | L5₹35.3 LAdmitted-Finance | -3.80% | ₹35.3 L | L5 | Admitted-Finance |
Tender Value
₹36.7 L
EMD Value
₹36,700
Closing Date
21 Apr 2026, 5:00 pmClosed
SE (Konkan), MIDC Panvel
Office of the Superintending Engineer, MIDC SE(Konkan), Panvel.
M and R to Roha Ind. Area.. Construction of retaining wall to protect guest house plot.
2026_MIDC_1292942_1
MIDC_of retaining wall to protect guest house plot_EC_36,65,215
Open Tender
Support/Maintenance Service
270 days
Roha Industrial Area
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,030
₹36,700
6 May 2026
7 Apr 2026
23 Apr 2026
7 Apr 2026
21 Apr 2026
7 Apr 2026
7 Apr 2026 - 10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part -1 Work Portion | |||||
| 1.1 | DG - ROHA INDUSTRIAL AREA...M & R to Roha Ind. Area…. Construction of retaining wall to protect guest house plot.
(Please reffer the tender document for Schedule B item description) | - | Lumpsum | 0.94 | - |
| 2Part -2 Fixed Charges - Quality Control Testing Charges | |||||
| 2.1 | BASIC TEST OF CEMENT: Standard Consistancy, Fineness, Specific Gravity, Setting Time ( Initial & Final), Compressive Strength, Soundness. | - | 1 Test | - | - |
| 2.2 | BASIC TEST OF AGGREGATE: Water Absorption, Specific Gravity,Impact Value, Crushing Value. | - | 1 Test | - | - |
| 2.3 | CONCRETE: Compressive Strength OF C.C. Cube (Set of 3 cubes). | - | 1 Test | - | - |
| 2.4 | CONCRETE: Concrete Mix Design (With all Tests on basic materials) | - | 1 Test | - | - |
| 3Part -2 Fixed Charges - Royalty Charges | |||||
| 3.1 | Sand | - | Cubic Meter | - | - |
| 3.2 | Metal | - | Cubic Meter | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.94 MB
TenderDocument.pdf
Tender Documents • 0.38 MB
ItemSpecification.pdf
Additional Documents • 0.02 MB
BOQ_2222043.xls
BOQ • 0.30 MB
Drawing.pdf
Other Document • 0.21 MB
Download all tender documents and submit your bid