Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹7.3 L+₹39,109.49 (5.69%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹7.4 L+₹49,812.08 (7.24%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹7.6 L+₹76,818.63 (11.2%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹8.0 L+₹1.1 L (16.5%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
9 Jul 2026, 4:00 pmClosed
exen r and b watergam
ofc of xen r and b rafiabad
Development of Playfied at HSS Rohama
2026_PWDJK_313876_1
e nit 23 of 2026-27 dated 27/06/2026
Open Tender
Civil Works
Percentage
20 days
rafiabad
nit
2 documents required · 2 mandatory
₹600
exen r and b rafiabad
₹20,000
13 Jul 2026
27 Jun 2026
10 Jul 2026
27 Jun 2026
9 Jul 2026
27 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Earth work in excavation by mechanical means in trenches for foundations etc disposed earth is to be levelled and neatly dressed in all kinds of soil. | 18.36 | CUM | 256.85 | ₹4,715.77 |
| 3 | Providing and laying of stone soling (hand packed) in foundation trenches and ramming, including all leads, lifts carriage complete. | 3.06 | CUM | 1,000 | ₹3,060 |
| 4 | Providing & laying in position cement conc. of 1:4:8 (1 cement : 4 coarse sand: 8 graded agg. 20mm nominal size) excluding the cost of centring & shuttring all work upto plinth level and carriages. | 3.06 | CUM | 5,202.4 | ₹15,919.34 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 46.17 | CUM | 6,591.25 | ₹3,04,318.01 |
| 6 | Centring and shuttering incld. strutting propping etc and removal of form work foundations etc for mass concrete | 216 | SQM | 286.35 | ₹61,851.6 |
| 7 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.Welded | 743.26 | kg | 138.2 | ₹1,02,718.53 |
| 8 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.Two or more coats on new work | 35.69 | SQM | 131.85 | ₹4,705.73 |
| 9 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 2,205.6 | kg | 120.8 | ₹2,66,436.48 |
| 10 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge. Made of G.I. wire of dia 4 mm | 248.4 | SQM | 809.9 | ₹2,01,179.16 |
| 11 | Carriage of materials from source to site average lead 10 km a)Cement | 15.29 | tonne | 290 | ₹4,434.1 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_1015994.xls
BOQ • 0.25 MB
corriziyarat.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .