Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹9.4 L
EMD Value
₹23,601
Closing Date
9 Mar 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer,PMU ,Kattakada.
O/o Executive Engineer,PMU,Kattakada
Interlinking Malayinkeezh and Thachottukavu 11 KV Feeders using Covered Conductor and Providing One 100kVA DTR at Thevupara Under Electrical Section, Malayinkeezh of Electrical Division, Kattakada under Electrical Circle, Kattakad
2026_KSEB_834759_1
EE/PMU(KTDA)/ET-22/2025-26 dated 09.02.2026
Open Tender
Electrical Works
Percentage
120 days
Malayinkeezhu
6 documents required · 6 mandatory
₹2,242
₹23,601
9 Feb 2026
9 Feb 2026
13 Mar 2026
9 Feb 2026
9 Mar 2026
9 Feb 2026
9 Feb 2026 - 16 Feb 2026
Dismantling one LT 4 line cross arm with clamp from existing pole and stacking.
Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly.
Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly.
Dismantling one section fuse from structure and bringing back to section store.
Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel for Neutral & Street Main, for one km LT 3ph 5 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place.
Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires.
Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work.
Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work.
Dismantling (without damage) LT stay including digging pit in all classes of soil and backfilling.
Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.
Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.
Dismantling one LT 2 line cross arm with clamp from existing pole and stacking.
Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete.
Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete.
Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle).
Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing.
Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials.
Drilling hole of various sizes on existing Channel/Cross Arm.
Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil.
Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle).
Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing).
Transporting Transformers by hired vehicle to a distance upto 5km and carrying upto 2 numbers of 63/100/160/250kVA Transformers / Ring Main Units excluding loading& unloading charges.
Transporting Transformers by hired vehicle to a distance beyond 5km and carrying upto 2 numbers of 63/100/160/250kVA Transformers / Ring Main Units (Running km).
Fitting and erecting one HT Double Pole Structure using PSC pole in position, providing 2 stays, fitting 8 channel cross arms, fitting AB switch, DO fuse, station class LA etc., drawing GI earthing leads (separate GI strip for LA through insulated conduit) to the ground, mounting of 100kVA Transformer on DP structure, clamping with Transformer belt, fixing 2way distribution box, DTR meter with box, giving all HT & LT connections upto OH lines, fixing/sign writing all statutory display boards etc. including digging & back filling pit in ordinary soil excluding provision of pipe earthing, yard fencing and metaling.
Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe.
Providing Transformer fencing to a height of 1.8 m above ground level using MS Angle frames of size ISA 50x50x6mm for outer frame, 2 runs of 40 x 6 MS flat for horizondal brasing and grills with MS rods 8 mm Dia @ 10cm c/c for verticals, providing gate with locking arrangements, providing danger board & name board, embeding the legs in cement concrete 1:2:4, footing of size 30cmx30cmx50cm, painting with synthetic enamel paint two coats over one coat of iron primer etc complete, incl cost of transportation
Cleaning and levelling of transformer yard/RMU, spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick 6 mm broken stone, after constructing a curb wall of height 20cm above ground and 10cm below level including cost of all materials and charges for conveying, spreading, consolidating etc.
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges.
Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing).
Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point.
Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil.
Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works.
Fitting one Additional V cross arm in existing single pole including conveyance of materials.
Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials.
Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BID.pdf
Tender Documents • 0.86 MB
BOQ_1404329.xls
BOQ • 0.30 MB
corrigendum.pdf
PDF • 0.51 MB
Corrigendum1.pdf
PDF • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .