Loading…
Loading…
Tender ID
Tender Value
₹12.5 L
EMD Value
₹13,000
Closing Date
27 Mar 2026, 6:00 pmClosed
Executive Engineer Panchayat R&B Division BOTAD
Construction of 2 rooms and 1 storage room in Salangpur Veterinary Hospital Ta. Barwala, Dist. Botad
287843
Nivida 20 Second Attempt
Open
Civil Works - Buildings
Works
Botad
5 documents required · 0 mandatory · 5 optional
₹900
Yes
Executive Engineer, panchayat Road building Division, Botad,
₹13,000
Yes
18 Mar 2026
18 Mar 2026
18 Mar 2026
27 Mar 2026
18 Mar 2026
Name of Work :- Construction of 2 rooms and 1 storage room in Salangpur Veterinary Hospital
Ta. Barwala, Dist. Botad
Memorandum showing items of works to be carried out
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but according to
may be more or estimated
less. quantieis.
In Figure In Words.
1 37.130 Cum Excavation for foundation upto 1.5 122.94 Rupees One One
M depth including sorting out and Hundred Twenty Cubic
stacking of useful materials and Two and Paise metre
disposing of the excavated stuff Upto Ninety Four only
2 7.930 Cum Providing and laying cement 3805.30 Rupees Three One
concrete 1:2:4 and curing complete Thousand Eight Cubic
excluding the cost of form work in Hundred Five and metre
(A) Foundation and plinth. (up to 10 Paise Thirty only
3 6.350 Cum Brick work using common burnt clay 4214.30 Rupees Four One
building bricks having crushing Thousand Two Cubic
strength not less than 35 kg./Sq.Cm. Hundred Fourteen metre
in foundation and plinth in Cement and Paise Thirty
Mortar 1:6 (1- Cement : 6 -fine
sand)(B) Conventional
4 7.430 Cum Providing and laying controlled C.C. 4118.60 Rupees Four One
M-200 and curing complete Thousand One Cubic
excluding the cost of formwork and Hundred Eighteen metre
reinforcement for reinforced and Paise Sixty
concrete work in (A) foundation
footing Base of column and mass
5 0.850 Cum Provinding and laying controlled 9042.80 Rupees Nine One
C.C. M-200 and curing complete Thousand Forty Cubic
including the cost of formwork but Two and Paise metre
excluding cost of reinforcement for Eighty only
reinforced concrete work in column
up to Plinth leve.
6 3.180 Cum Provinding and laying controlled 7080.10 Rupees Seven One
C.C. M-200 and curing complete Thousand Eighty Cubic
including cost of form work but and Paise Ten only metre
excluding cost of reinforcement for
reinforced concrete work in Ground /
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but according to
may be more or estimated
less. quantieis.
In Figure In Words.
7 25.130 Cum Filling available excavated earth 136.92 Rupees One One
(excluding rock) in trenches, plinth, Hundred Thirty Cubic
sides of foundation etc. in layer not Six and Paise metre
exceeding 20 cm. In depth Ninety Two only
consolidating each deposited layer
by raming and watering.
8 24.130 Cum Brick work using common burnt clay 4255.30 Rupees Four One
building bricks having crushing Thousand Two Cubic
strength not less than 35 Kg./Smt. In Hundred Fifty metre
super structure above plinth level Five and Paise
upto floor two level in cement mortar
1:6 (1 cement :6 fine sand) (B)
9 8.960 Cum Provinding and laying controlled 8838.40 Rupees Eight One
C.C. M-200 and curing complete Thousand Eight Cubic
including the cost of formwork but Hundred Thirty metre
excluding cost of reinforcement for Eight and Paise
reinforced concrete work in column
up to floor all level (B)Columns
10 1.490 Cum Providing and laying controlled cement 9848.90 Rupees Nine One
concrete M-200 for R.C.C LINTEL Thousand Eight Cubic
including the cost of formwork with Hundred Forty metre
curing etc. complete excluding the Eight and Paise
cost of reinforcement up to floor all Ninety only
11 1.590 Cum Providing and Laying cement concrete 4152.60 Rupees Four One
1:3:6 (1-Cement , 3:- Coarse sand : 6- Thousand One Cubic
Crushed stone aggregate 20 mm Hundred Fifty metre
nominal size ) and curing Complete Two and Paise
including cost of formwork in (A) wall Sixty only
12 0.660 Cum Providing and laying controlled cement 6477.39 Rupees Six One
concrete M-200 and curing complete Thousand Four Cubic
including the cost of formwork but Hundred Seventy metre
excluding the cost of reinforcement for Seven and Paise
R.C.C work in CHHAJJA including Thirty Nine only
finishing the exposed surface to give
smooth & even surface centering and
formwork & curing complete.
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but according to
may be more or estimated
less. quantieis.
In Figure In Words.
13 4.170 Cum Providing and laying controlled cement 8618.70 Rupees Eight One
concrete M-200 curing complete in Thousand Six Cubic
cluding cost of formwork but Hundred Eighteen metre
excluding cost of reinforcement for and Paise Seventy
reinforced concrete work in Beam up only
to floor all level
14 8.910 Cum Providng and laying controlled 5744.10 Rupees Five One
cement concrete M-200 and curing Thousand Seven Cubic
complete including the cosr of form Hundred Forty metre
work but excluding the cost of rein Four and Paise
forcement for R.C.C work in Slab up
to floor all level.
15 4312.240 Kg Providng thermo mechanically 77.29 Rupees One
treated bars FE 500D bar Seventy Seven Kilogram
reinforcement for R.C.C. work and Paise Twenty
including bending binding and Eight only
placing in position etc. complete for
all floor level.
16 21.120 Cum Filling in foundation and plinth with 301.78 Rupees Three One
murrum or selecred soil in layer of Hundred One and Cubic
20 cm.thickness including watering Paise Seventy metre
ramming and consolidation ane etc. Eight only
17 9.720 Sqm Providing and fixing Alluminium 4040.00 Rupees Four One
windows having three track section Thousand Forty Squere
92 mm x 31.55 mm ,shutter section and Paise Zero metre
40 mm x 18 mm mounted on bearing only
to slide on track colour anodized in
20 micron in approved shade
including 5 mm clear plate glass,
PVC track gasket, EPDM rubber
gasket on glass of weather tightening
along with locks, handle including
sealing gap with marble surfaces
with silicon sealants making it water
proof in al manner etc. comp. as per
architect's details at all floor
levels.(powder coated) for all floors
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but according to
may be more or estimated
less. quantieis.
In Figure In Words.
18 6.300 Sqm Providing and fixing 35 mm thick 3327.90 Rupees Three One
panelled ,glazed or panelled and Thousand Three Squere
glazed shutters, for Doors windows Hundred Twenty metre
and clearstory windows including Seven and Paise
black enamelled M.S. But hinges
with necessary screws. (A) Plywood
19 0.243 MT Providing and fixing M.S. Grills of required 10162.96 Rupees Ten One
pattern to wooden frames of windows etc. Thousand One Metric
with M.S. flats at required spacing and Hundred Sixty Ton
frame alround ,square or round bars with Two and Paise
round headed bolts and nuts or by screws
Ninety Six only
(A)Plain Grill.Providing fusion bonded
Epoxy coating not less than 175 micron
thickness and up to 300 micron to
reinforcement bars as per IS-13620-
1993/ASTM-775 M including testing of
coating at plant and all taxes (A) 10mm to
20 224.010 Sqm 20mm thick sand faced cement 342.41 Rupees Three One
plaster on wall up to height 10meters Hundred Forty Squere
above ground level consisting of Two and Paise metre
12mm thick backing coat of C.M. 1:3 Forty One only
(1 cement : 3 sand) and 8mm thick
finishing coat of C.M. 1:1 (1 cement
: 1 sand) etc. complete
21 66.030 Sqm Providing 15 mm thick cement 179.91 Rupees One One
plaster in single coat on Rough/ Hundred Seventy Squere
(Similar) Side of Single or half brick Nine and Paise metre
wall for interior plastering up to two Ninety One only
floor and finished even and smooth
in cement mortar 1:4 (1 cement :
sand) (A) up to all floor
22 170.120 Sqm Providing 15 mm thick cement 196.27 Rupees One One
plaster in single coat on Rough / Hundred Ninety Squere
(Similiar) side of single or half brick Six and Paise metre
walls for interior plastering up to Twenty Seven
floor two level and finished even and
smooth in (ii) cement mortar 1:4 (1
cement : 4 sand) including of neat
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but according to
may be more or estimated
less. quantieis.
In Figure In Words.
23 64.460 Sqm Providing and laying 24" x 24" 1264.40 Rupees One One
vitrified 8MM thick tile flooring Thousand Two Squere
over 20MM (average) base of Hundred Sixty metre
cement mortar 1:6 (1- Cement : 6- Four and Paise
Coarse Sand) on new surface or
fixing on existing flooring by adhe-
sive material including dismentalling
of existing flooring and jointed with
colour cement slurry including
finished with flush pointing and
cleaning the surface etc. complete.
For Light shade
24 12.970 Sqm Providing and laying Kota stone slab 1090.70 Rupees One One
Flooring over 20 mm (average) base Thousand Ninety Squere
of cement mortar 1:6 (1- Cement, 2- and Paise Seventy metre
Coarse sand ) or L.M. 1:1.5 (1- Lime only
Putty : 1.5- Coarse Sand ) laid and
jointed with gray cement slurry
including rubbing and polishing
complete (A) Marbale 30 mm thick
25 224.010 Sqm Finishing wall with weather proof 120.26 Rupees One One
exterior emulsion paint on wall Hundred Twenty Squere
surface(two coats) to give an and Paise Twenty metre
required shape even shade after Six only
thoroughly brushing the surface to
remove all dirt, and remains of loose
powdered materials etc complete
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but according to
may be more or estimated
less. quantieis.
In Figure In Words.
26 66.030 Sqm Wall painting (two coats) with 165.99 Rupees One One
plastic emulsion paint of approved Hundred Sixty Squere
brand and manufacture on Five and Paise metre
undecorated wall surface to give an Ninety Nine only
even shade including throughly
brushing the surface free from
mortar droppings and other foreign
matter and sand papered
smooth.Extra over item 57 for every
subsequent coat of wall painting with
plastic emulsion pain of approved
brand. Applying two coats of Birla
(white cement based) or Asian
(acrylic lapy- putty) or equivalent &
two coats of primer of approved
brand and manufacture on new wall
surface to give an even shade
including thoroughly brushing the
surface free from mortar dropping
and other foreign matter and sand
papered smooth.
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but according to
may be more or estimated
less. quantieis.
In Figure In Words.
27 170.120 Sqm Wall painting (two coats) with 171.52 Rupees One One
plastic emulsion paint of approved Hundred Seventy Squere
brand and manufacture on One and Paise metre
undecorated wall surface to give an Fifty Two only
even shade including throughly
brushing the surface free from
mortar droppings and other foreign
matter and sand papered
smooth.Extra over item 57 for every
subsequent coat of wall painting with
plastic emulsion pain of approved
brand.Extra over item 57 for painting
with plastic emulsion paint of
approved brand on ceilings and
sloping roofs. Applying two coats
of Birla (white cement based) or
Asian (acrylic lapy- putty) or
equivalent & two coats of primer of
approved brand and manufacture on
new wall surface to give an even
shade including thoroughly brushing
the surface free from mortar
dropping and other foreign matter
and sand papered smooth.
28 1.200 Rm providing and fixing the PVC pipe 506.77 Rupees Five One
rain water out let pipe of I.S.I mark Hundred Six and Running
approved quility make equivalent to Paise Seventy metre
finolex with necessesary bend plug, Seven only
jali ,clamps, etc. complete 75 mm
29 35.630 Sqm Providing and laying broken 779.70 Rupees Seven One
china mosaic flooring for terrace Hundred Seventy Squere
using 12 mm to 20 mm broken Nine and Paise metre
pieces of glazed tiles to be laid over Seventy only
cement mortar 1:3 to plain or slope
and to be tempered to bring
mortar creme out upto surface
using white cement including
rounding off junctions and extending
them upto 15 cm along the
wall,clearing with water and oxalic
acid etc. as directed.
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but according to
may be more or estimated
less. quantieis.
In Figure In Words.
30 500.000 Kg Providing and FixingM.S. Grills of 169.79 Rupees One One
required pattern to wooden frames of Hundred Sixty Kilogram
pipe / agle etc. including priming Nine and Paise
coat of approved primer and two Seventy Nine only
coats of oil painting etc. complete
ordinary grill.
31 17.000 Point Point wiring for Light / Fan/ Bell/ 336.63 Rupees Three One Point
Primary Point with 2-1.5 sq. mm Hundred Thirty
and earthwire of 1.5 sq. mm (green) Six and Paise
both are of ISI marked 1.1 kv grade Sixty Three only
FRLS PVC insulated multistrand
copper wires, in following type of
pipe to be erected concealed in
/flushed on wall/ceiling , complete
with 6A Tissino Type ISI marked
flush type switch / bell push and
accessories erected on Metal / PVC
Box covered with 3 mm thick
PC(Polycarbonet) /Acrylic sheet.
with necessary Lamp holder/ceiling
rose / H.D.Connector as directed.
(a) with medium class Rigid PVC
pipe and accessories
32 6.000 Point Point wiring for looped PLUG with 153.02 Rupees One One Point
tissino type single pole ISI marked Hundred Fifty
Switch and Socket erected with Three and Paise
necessary connections erected on Two only
wooden /Metal/ PVC Box covered
with 3 mm thick PC(Polycarbonet)
/Acrylic sheet for open / concealed
wiring for following size. [B] For
33 50.000 Rm Rigid PVC Pipe 3/4" size.
Twenty Three and Running
Paise Forty Six metre
34 50.000 Rm Supplying and erecting 132.61 Rupees One One
XLPE(IS:7098)(I)-88 ISI Hundred Thirty Running
unarmoured copper cable 1.1 KV Two and Paise metre
grade to be erected as directed of Sixty One only
following size. (E) 3 core 2.5 Sq.
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but according to
may be more or estimated
less. quantieis.
In Figure In Words.
35 3.000 No Approved make Double Pole Plastic 153.02 Rupees One One
Switch and fuse 250V., 30A Hundred Fifty Number
confirming to IS erected on Polished Three and Paise
wooden block as directed. Two only
36 5.000 No Supplying and erecting Fan Hook of 51.01 Rupees Fifty One
10 mm M.S. Round bar grouted in One and Paise Number
RCC slab with Making the site as One only
37 5.000 No Providing and erecting Approved 1734.20 Rupees One One
make Ceiling fan with double ball Thousand Seven Number
bearing ISI mark with condenser Hundred Thirty
A.C. 23OV.50 c/s.1200 mm. sweep Four and Paise
complete, canopy and 30 cms. down
rod erected on existing hook or
clamp with 24/0.2 , 3 core flexible
wire with earthing. [Make shall be
approved by Engineer in charge]
38 1.000 No Pipe type earthing having 150 438.64 Rupees Four One
cms.long and 2.5 cms. dia. Hundred Thirty Number
galvanised iron pipe with coupling Eight and Paise
and buch buried in specially Sixty Four only
prepared earth pit complete with
necessary 8 SWG earth wire.
39 13.000 No Providing and Fixing Power saver CFL 153.02 Rupees One One
lamp direct holder fitting 5-W Hundred Fifty Number
Three and Paise
Dismentled Material Credit Rs.
will be deducted from 1 St R.A.
Rupees Twelve Lakh Forty Six Thousand Nine Hundred One and Paise Ninety Nine Total Rs.
I \ We am \ are willing to carry out the work at ……………………… % above\bellow percent (
Should be written in figures and words ) of the estimated rate mentioned above. Amount of My \
Our tender works put as under.
* Estimated Amount * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Add……..……..%
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but according to
may be more or estimated
less. quantieis.
In Figure In Words.
In words………………….……………… In words………………….………………
1.The Contractor shall exhibit a board with detailed specification and details of work as directed by
the Engineer-In-Charge for which no extra payment shall be made.
2.The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3.GST and Income tax TDS will be deducted at a source while making payments of bills
4.In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the rate of
input rate mentioned in all the tender.
Signature of Contractor
Deputy Executive Engineer Executive Engineer
Panchayat R.& B. Sub Division ( D P ) Road & Building Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
3 Test Schedule.pdf
7 Cement.pdf
SBD.pdf
Schedule B.pdf
Specification_Part1.pdf
Specification_Part2.pdf
Specification_Part3.pdf
Specification_Part4.pdf
Specification_Part5.pdf
Specification_Part6_Part1.pdf
Specification_Part6_Part2.pdf
Specification_Part6_Part3.pdf
Nivida No-20 (Second Trie).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .