Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 116 SHANTINAGAR ROAD BHADRAKALI UTTARPARA HOOGHLY WEST BENGAL 712232 | HOOGHLY | WEST BENGAL | 712232 | Admitted-Finance |
| 2 | Admitted-Finance 104 BAKUL BAGAN ROAD KOLKATA 700020 WB | KOLKATA | KOLKATA | WEST BENGAL | 700020 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance 620 DIAMOND HARBOUR ROAD BEHALA INDUSTRIAL ESTATE PLOT NO F A KOLKATA 34 | KOLKATA | WEST BENGAL | Admitted-Finance |
Tender Value
₹22.8 L
EMD Value
₹11,400
Closing Date
3 Aug 2020, 5:00 pmClosed
Managing Director WBEIDC Ltd
Webel Bhavan Salt Lake SEC V EP GP Block KOL 91
Repair renovation and upgradation of AC System at different floors of STP II Building
2020_WEBEL_289801_1
EC/07/STP-II/Upgradation AC/Etender/20-21/M03
Open Tender
IT WORKS ORG
Item Rate
90 days
Salt Lake SEC V KOlkata
Please refer to the tender docs
5 documents required · 5 mandatory
₹1,000
WBEIDC Ltd
₹11,400
17 Aug 2020
15 Jul 2020
4 Aug 2020
15 Jul 2020
3 Aug 2020
22 Jul 2020
Amount
Supply, installation, testing & commissioning of following size/ capacity of ductable type Air conditioner having 3 phase scroll compressor with accessories required for respective units, suitable for operation on 3-phase, 415 volt +/- 10%, 50 Hz AC supply with ceiling suspended evaporator units & outdoor type compressor units, microprocessor based control panel, corded Remote with out refrigerant pipes etc. Make- Mitsubishi / Carrier / Voltas / Blue Star / Daiken. CAT no. shall be specified along with technical literature. The cost shall be inclusive of dismantling of the existing AC & modification required for installation of new AC machine as mentioned below along with necessary fixing arrangement of IDU & ODU, interconnecting cable between IDU & ODU, replacement of other necessary control/power cables etc. complete with incoming & outgoing connections, supply & charging of R-410A or equivalent HFC refrigerant gas. Painting of stand, properly alignment with the existing AC system after removal of old IDU & ODU pipes cable etc. Modification of ducting system, pipe line connection, cable connection are to be carried out by the contractor as required. Motors, compressors etc of old AC system if in working condition to be handed over & arrangement of removal of body/scrapped item ae per site requirement. No hidden cost allowed.
5.5 TR AC machine (normal cooling capacity 16500 K.Cal/Hr. at ISI)
8.5 TR AC machine (normal cooling capacity 22500 K.Cal/Hr. at ISI)
Supply, installation & testing of following refrigerant piping with hard / soft drawn copper refrigeration pipelines providing necessary fittings, support, fixing etc. & brazing arrangement. Providing necessary Ball isolation valves, Expansion valves, Driers etc. are to be installed as required / recommended. Proper leak testing of entire refrigeration pipelines with dry nitrogen. All the joints are to be sealed with nitrile rubber properly.
11/8" or equivalent suitable size with insulation (as per OEM recommendation)
5/8" or equivalent suitable size with insulation (as per OEM recommendation)
Supply, installation, testing & commissioning of control cable (6 core x 1.5 sq.mm. PVC insulated armoured copper cable with 2 nos. 12 SWG copper earth wire with necessary supporting clamp/spacers & saddles etc) between IDU & ODU of AC units complete with all accessories including incoming & outgoing connection complete. Dismantling of existing controlling cable is also included. (Cable make: Finolex, Polycab, Gloster/PWD approved as per direction of EIC)
Lifting & shifting charges of AC unit (IDU & ODU) to the respective floors (3rd /4th/5th as required). The ODU is to be installed on suitable size of MS structure & platform on terrace/on chajja/on outside wall as directed as per site condition. The platform to be made by 6mm thick U channel (75mm x 40m x 40mm) to hold the ODU by nuts & bolts, it's legs are to be grouted by using cement & sand etc., strong enough to take the load of the machine & providing vibration pads etc.
Duct Modification: Supply, installation, testing & commissioning of 24 SWG GI sheet & ducting materials with nitrile rubber insulation, duct fabrication, repairing duct leakage, air balancing & gaping for proper cooling, adjustment or suitable replacement of VCDs. Cleaning of existing duct with vacuum cleaner along with checking of relevant grills, canvas mouth, dismantling & repairing of false ceiling , dismantling & shifting of existing AC machines etc as per site requirement
EVAC ENGINEERING PROJECTS PVT. LTD
WEATHER MAKERS INDIA
AIR Q SOLUTIONS
UNIVERSAL SALES
Bidder Name
UNIVERSAL SALES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .