Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
20 Jan 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
LTCDR SUMIT MODI
FTSU CHN
DEFECT RECTIFICATION ONBOARD INS BITRA INSIDE CHENNAI PORT TRUST
2021_NAVY_412034_1
FTSU/BIT/E,L,H/20-21 DATED 12 JAN 21
Limited
Miscellaneous Services
Fixed-rate
60 days
CHENNAI
AS PER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹0
Exempted
FTSU (CHN)
21 Jan 2021
13 Jan 2021
21 Jan 2021
13 Jan 2021
20 Jan 2021
15 Jan 2021
13 Jan 2021 - 18 Jan 2021
18 Jan 2021
90 days
LEAK OBSERVED FROM FUEL LINE OF DD HPAC. RA FOR BRAZING/RENEWAL OF LINE
SEA WATER LEAKAGE OBSERVED FROM EXHAUST DOUBLE JACKET PIPE LINE .RA FOR BRAZING/RENEWAL OF PIPE
BOTH HPAC SECOND STAGE PRESSURE NOT BUILDING UP VIEW OPERATION OF FIRST STAGE RELIEF VALVE. SUSPECT SECOND STAGE VALVE MALFUNCTIONING
FRESH WATER LINE FOR QUARTER DECK SYSTEM BROKEN. RA FOR MANUFACTURING OF LINE AS PER SAMPLE.
ROPE &CANVAS SEA WATER PIPE LINE LEAKING. FOR BRAZING
F/W SYSTEM FOOT VALVE INSIDE F/W TANK NOT HOLDING. SUSPECT F/W LINE END FITTINGS THREADS PERISHED. A FOR RENEWAL OF PIPE AND FITMENT INSIDE F/W TANK
FOLLOWING ROD GEARINGS DEFECTIVE. SUSPECT GEARING MECHANISM DAMAGED OR BROKEN. A FOR OVERHAULING/REPAIR: -(I) AER SALVAGE SUCTION VALVE (II) MER SALVAGE SUCTION VALVE (III) MER SALVAGE INTERCONNECTING VALVE (IV) GER SPRINKLING VALVE (V) ROPE AND CANVAS STORE SPRINKLING VALVE (VI) PUMP ROOM SALVAGE SUCTION VALVE
AC CONDENSOR NO 2 DISCHARGE VALVE NOT HOLDING. RA FOR OVERHAULING OF VALVE .SCOPE OF WORK INVOLVES RETRIEVING OF GAS ,REMOVAL, REPAIR AND FITMENT OF VALVE FOLLOWED BY PT AND VT. QTY-01
STBD SIGNAL PROJECTOR MALFUNCTIONING. SUSPECT ROTARY SWITCH MALFUNCTIONING. DEFECT RECTIFICATION TO BE UNDERTAKEN.
TANK LEVEL INDICATIONS IN MCR TANK LEVEL INDICATION PANEL INACCURATE. SUSPECT TANK LEVEL GAUGES DEFECTIVE. DEFECT TO BE RECTIFIED.
SPRING ADJUSTMENT MECHANISM OF WT HATCHES JAMMED. TO BE OVERHAULED. HEATING ASSISTANCE REQUIRED QTY-08
DOOR OF SS LOCKER IN SHIPS GALLEY UPROOTED FROM HINGES. TO BE REPAIRED. WELDING ASSISTANCE REQUIRED.
CANVAS COVER OF FOLLOWING EQUIPMENT TORN IN MULTIPLE PLACES DURING ROUGH WEATHER. RA FOR REPAIR/ RENEWAL (I) RIB-ONE (II) GEMINI-ONE (III) LMG/HMG-THREE (IV) SOP-ONE
FOUNDATION OF ROPE REEL FITTED ON FOXLE AND QUARTER DECK DAMAGED. RA FOR FABRICATION AND FITMENT. QTY-04, QTY-MS
ROLLER BEARING OF FOUR ROPE REEL JAMMED DUE TO FWT. RA FOR REPLACING ROLLER BEARING. QTY-08 TWO FOR EACH ROPE REEL.
KICK OUT PANELS OF NON WATERTIGHT DOORS BROKEN. TO BE RENEWED ALONG WITH AIR ESCAPE ARRANGEMENT .QTY-04
SECURING ARRANGEMENT OF PC AND PERIPHERALS UPROOTED / BROCKEN AT VARIOUS LOCATIONS DURING ROUGH WEATHER. RA FOR FITMENT OF SECURING ARRANGEMENT. QTY-15. MAT VELCRO
NWT DOOR UPROOTED FROM HINGES DURING ROUGH WEATHER. RA FOR REPAIR. QTY-04
LOCKING ARRANGEMENT AND COVER OF QSV AT MER AND AER SOFT PATCH DEFORMED. RA FOR FABRICATION AND FITMENT .QTY-02
VENT FLAP COVER AT MER SOFT PATCH OF MAIN ENGINE AIR INTAKE UPROOTED FROM HINGES. RA FOR FABRICATION AND FITMENT .QTY-02
WATER INGRESS OBSERVED IN MER FROM SOFT PATCH. RA FOR STRUCTURAL SURVEY AND REPAIR.
WIRE MESH OF MUSHROOM HEADS ON UPPER DECK CORRODED. RA FOR REPLACING WIRE MESH. SCOPE OF WORK INVOLVES DISMANTLING AND FITMENT OF MUSHROOM HEAD POST REPLACEMENT OF WIRE MESH .QTY-09
GUARDRAIL STANCHIONS AT VARIOUS LOCATIONS ON UPPER DECK DEFORMED. RA FOR FABRICATION AND FITMENT .QTY-10
GUARDRAILS STANCHIONS SHOES AT VARIOUS LOCATIONS ON UPPER DECK DEFORMED /CORRODED. RA FOR FABRICATION AND FITMENT. MAT-MS QTY-06
STANCHIONS SECURING ROD AT VARIOUS LOCATIONS ON UPPER DECK DEFORM. RA FOR FABRICATION AND FITMENT. MAT-MS-QTY06
INNER COVER OF WATERTIGHT HATCHES THINNED / CORRODED DUE FWT . RA FOR FABRICATION AND FITMENT .QTY-06
WEATHER COVER OF FOLLOWING EQUIPMENT DEFORMED/PERISHED. RA FOR FABRICATION AND FITMENT (I) CONNING SPEAKR-01 (II) SITH SOCKET -01 (III) CHECK FIREBELL-04 (IV)MOB ALARM -01(V) SHORE SUPPLY CONNECTION BOX-01 (VI) BOAT DAVIT CONTROL PANEL -01 (VII) BOAT DAVIT JUNCTION BOX-01(VIII) BOAT DVIT MOTOR-01
UNITED COMPONENT AND SERVICES
MAK TECHNICAL WORKS
SMEC Automation Pvt Ltd
Vignesh Marine Technical Services Pvt Ltd
G V MARINE TECHNIKCAL
MSM ENGINEERING
KOMAL INDUSTRIES
MAK TECHNICAL SERVICES
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .