Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAccepted-AOC | ₹9.5 L | L1 | Accepted-AOC 1st lowest responsive bidder |
| 2 | L2₹10.0 L+₹46,459.97 (4.87%)Rejected-AOC | ₹10.0 L+₹46,459.97 (4.87%) | L2 | Rejected-AOC Unsuccessful bidder |
| 3 | L3₹10.2 L+₹63,771.08 (6.68%)Rejected-AOC | ₹10.2 L+₹63,771.08 (6.68%) | L3 | Rejected-AOC Unsuccessful bidder |
| 4 | L4₹10.8 L+₹1.3 L (13.3%)Rejected-AOC | ₹10.8 L+₹1.3 L (13.3%) | L4 | Rejected-AOC Unsuccessful bidder |
| 5 | L5₹11.3 L+₹1.8 L (18.5%)Rejected-AOC | ₹11.3 L+₹1.8 L (18.5%) | L5 | Rejected-AOC Unsuccessful bidder |
Tender Value
₹12.7 L
EMD Value
₹13,000
Closing Date
27 Apr 2026, 5:00 pmClosed
SE Bargarh Irrigation Division Bargarh
At- canal Colony, Bargarh, Odisha
Improvement to Adgaon Minor from RD 823m to 1050m.
2026_CEBBU_128079_1
BID-01 of 2026-27 dated 07.04.2026
Open Tender
Civil Works - Canal
Percentage
60 days
Bargarh
Please refer Tender document
2 documents required · 2 mandatory
₹6,000
₹13,000
Yes
21 Aug 2026
13 Apr 2026
28 Apr 2026
13 Apr 2026
27 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork exavation in all kind of soil including dressing and levelling the bed and depositing the excavated materials away from the work site with all leads, lifts, sundries, T&P required for the work etc complete as directed by the Engineer in Charge
per the direction of Engineer-in-charge. | - | per cum | - | - |
| 2 | Filling foundation and plinth with sand including cost, conveyance & royalty of all materials to the work site including watering & ramming with all leads, lifts, sundries & T&P etc. complete, as per direction of Engineer-in-Charge. | 1 | Per cum | - | - |
| 3 | Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including 3 hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C. | 1 | Per cum | - | - |
| 4 | Cement concrete (1:2:4) with 12mm size hard granite crusher broken chips for C.C & R.C.C. work. including cost, conveyance, royalty & other taxes of all materials to the work site, mixing & laying of concrete in position & compacted properly with all leads lifts, sundries with all hire & running charges of machineries such as concrete mixer, vibrator etc. required for the work site with proper compaction & curing etc. complete as directed by Engineer in-charge | 1 | per cum | - | - |
| 5 | Rigid smooth centering & shuttering for cement concrete works including false work & dismantling after casting and clearing the debries from worksite with all leads, lifts, sundries including cost, conveyance labour T&P etc. complete as directed by Engineer-in-charge | - | per sqm | - | - |
| 6 | Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification including cost, convenyance and royality of all materials to site, T&P sundries, etc. complete as per direction of Engineer- in- charge | - | per Qntl | - | - |
| 7 | Filling in foundation and Plinth with excavated materials incluiding watering, ramming etc complete as per direction of Engineer in charge | 1 | per cum | - | - |
| 8 | Earthwork in suitable type of soil in brrow area, loading into transport vehicle manually or mechanically and transportation of earth by mechanical means and unloading the same oer the approved surface of the embankment in proper profiles with all leads, lifts and delifts etc. including rough dressing and breaking the clods to maximum 5cm to 7cm size including removal of roots, bushes, from transported earth with all cost, carriage, royality, labour welfare cess with hire and running charges of all machinaries with all labour, T&P required for the work etc. complete as per direction of the Engineer-in-charge. | - | per cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_587699.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
7BIDDOCUMENT07.pdf
Tender Documents • 2.21 MB
BOQ_587699.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .