| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹30.0 LAccepted-AOC | ₹30.0 L | L-1 | Accepted-AOC OK |
| 2 | L-2₹30.2 L+₹16,953.06 (0.56%)Accepted-AOC HALDWANI NAINITAL | ₹30.2 L+₹16,953.06 (0.56%) | L-2 | Accepted-AOC OK |
| 3 | Not Admitted-Fee/PreQual/Technical 0 2 | NAINITAL | UTTARAKHAND | 244713 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Sanjay Pandey L2 | rajendra kumar pandey L1 |
|---|---|---|---|---|---|
| 1.01 | Slip clearance (by manual means) of loose earth and other small loose materials including disposal complete as directed by the Engineer-in-charge | 40.48 | CUM | 175 ₹7,084 | 170.7 ₹6,909.94 Lowest |
| 1.02 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. | 13 | CUM | 1,229 ₹15,977 | 1,227.6 ₹15,958.8 Lowest |
| 1.03 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the
serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. | 115.65 | CUM | 320 ₹37,008 | 318.3 ₹36,811.4 Lowest |
| 1.04 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and back filling in trenches with excavated suitable material.(Ordinary soil Upto 3 m depth) | 212.03 | CUM | 320 ₹67,849.6 | 315.9 ₹66,980.28 Lowest |
| 1.05 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203(P.C.C. grade M 20 Nominal mix (1:2:4)) | 25.71 | CUM | 5,220 ₹1,34,206.2 | 5,215.2 ₹1,34,082.79 Lowest |
| 1.06 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204(Coursed rubble masonry (1st sort)In 1:3 cement mortar) | 321.9 | CUM | 5,010 ₹16,12,719 | 5,009.6 ₹16,12,590.24 Lowest |
| 1.07 | Pointing with cement mortar (1:3) on brick/stone work as per drawing and technical specification Clauses 613.3 and 1204 (Flush/Ruled pointing) | 449.75 | CUM | 75 ₹33,731.25 | 73.6 ₹33,101.6 Lowest |
| 1.08 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (For height upto 5 m) (R.C.C. grade M 25) | 84.27 | CUM | 6,540 ₹5,51,125.8 | 6,538.5 ₹5,50,999.4 Lowest |
| 1.09 | Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First revision'2014) and IS 1786:2008 clause no. 1.6) (steel producers only and no rolled steel shall be used) | 7,409.02 | QTL | 73 ₹5,40,858.46 | 71.08 ₹5,26,633.14 Lowest |
| 1.10 | Providing & fixing 20mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications. | 28.6 | rmt | 140 ₹4,004 | 137.6 ₹3,935.36 Lowest |
Tender Value
Refer Docs
EMD Value
₹72,000
Closing Date
25 Oct 2025, 4:00 pmClosed
executive engineer
executive engineer irrigation division haldwani
Project For Covering Of Karayal Canal (Phase-II) in Block haldwani under District Plan (SCSP)
2025_IRDCE_87421_1
03/EE/2025-26
Open Tender
Civil Works - Canal
Item Rate
120 days
near by haldwani
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
executive engineer irrigation division haldwani
₹72,000
Yes
haldwani
14 Nov 2025
23 Sept 2025
27 Oct 2025
23 Sept 2025
25 Oct 2025
11 Oct 2025
4 Oct 2025
Amount
Slip clearance (by manual means) of loose earth and other small loose materials including disposal complete as directed by the Engineer-in-charge
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and back filling in trenches with excavated suitable material.(Ordinary soil Upto 3 m depth)
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203(P.C.C. grade M 20 Nominal mix (1:2:4))
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204(Coursed rubble masonry (1st sort)In 1:3 cement mortar)
Pointing with cement mortar (1:3) on brick/stone work as per drawing and technical specification Clauses 613.3 and 1204 (Flush/Ruled pointing)
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (For height upto 5 m) (R.C.C. grade M 25)
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First revision'2014) and IS 1786:2008 clause no. 1.6) (steel producers only and no rolled steel shall be used)
Providing & fixing 20mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications.
Structural steel work riveted bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Sanjay Pandey (BID ID -403674)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.46 MB
tendernotice03.pdf
Other Document • 2.45 MB
BOQ_103743.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .