Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹15.7 L
EMD Value
₹31,400
Closing Date
14 Oct 2026, 3:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
WIldlife Warden Kathua
Forest Complex Kathua
RCC SILT DENTENTION STRUCTURE NO 13 NEAR ROSHAN DIN ACROSS MAIN NORA NALA
2026_FD_327434_1
NIT 16 WLW/K/T OF 2026-27
Open Tender
Civil Works
Percentage
30 days
Thein CR
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
AC 0110010200001104 PCCF/CWLW
₹31,400
7 Oct 2026
7 Oct 2026
15 Oct 2026
7 Oct 2026
14 Oct 2026
7 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil | 62.3 | Cum | 479.3 | ₹29,859.43 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size) | 5.47 | Cum | 4,826.5 | ₹26,386.48 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 92.88 | Cum | 7,104.35 | ₹6,59,859.13 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth level @31per cum of concrete | 2,879.31 | Kg | 123.2 | ₹3,54,731.12 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. Allworks upto plinth level1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 12.46 | Cum | 5,733.6 | ₹71,440.66 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 141.26 | Sqm | 286.35 | ₹40,450.95 |
| 7 | 12mm Cement plaster of mix:
1 : 6 ( 1 cement : 6 fine sand) | 83.64 | Sqm | 266.2 | ₹22,265.77 |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 0.29 | Cum | 6,591.25 | ₹1,937.83 |
| 9 | Sand av. 30 Km HL 2000m | 50 | Cum | 2,424.92 | ₹1,21,236.3 |
| 10 | Bajri av. 30 Km HL 2000m | 99.99 | Cum | 2,424.92 | ₹2,42,470.18 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.75 MB
BOQ_1107814.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .