Loading…
Loading…
335 live273 closing this weekmost from FOREST DEPARTMENT and Forest Department
335 results • Latest
Estimate for the cost of transporting Rose wood timber involved in Windfallen/DP from Ponmudi Section compound and premises to Govt. Timber Depot, Parampuzha in Devikulam Range During 2026-27
Estimate for the cost of transporting Rose wood timber involved in Windfallen/DP from Pallivasal Section compound and premises to Govt. Timber Depot, Parampuzha in Devikulam Range During 2026-27
Cost of transporting Rose Wood timber involved in WF/DP from Bodimettu Section compound and premises to Govt. Timber Depot. Parampuzha in Devikulam Range during 2026-27
Const. Of Kacha Pond in Compt. 18a/R Pum Surjandhar in Reasi Range Of Reasi Forest Division under CAMPA NPV 2026-27
Const. Of Kacha Pond in Compt. 67/Th Theda in Tharkakote Range Of Reasi Forest Division under CAMPA NPV 2026-27
Const. Of Kacha Pond in Compt. 47/R Pond Kothri in Reasi Range Of Reasi Forest Division under CAMPA NPV 2026-27
Const. Of Kacha Pond in Compt. 78/K Madlian in Katra Range Of Reasi Forest Division under CAMPA NPV 2026-27
Installation of Barricade on Swami Ayyappan Road in Sannidhanam Forest Station of Pampa Range during 2026-27
Construction of trench retaining wall work at Dam Site in Vallakkadavu Range during 2026-27
Maintenance of Priyadharshini Training Centre at Vallakkadavu Range during 2026-27
Raising of 25,500 Nos in polybags at Sonwar Nursery
Management of Solid Waste and Plastic around Wular lake, its peripheries and Catchment and associated streams including restoration of legacy Waste Dumping Site Zalwan.
Maintenance and Upgradation of Range Office Ganderbal at Waheedpora Nursery in District Ganderbal, Social Forestry Range Ganderbal, SF Division Srinagar. Under Capex 2026-27
Planting of Polybag raised saplings and Naked root saplings and Providing and fixing of Barbed wire fencing with Angle iron posts in cement concrete Blocks and Construction of Water Harvesting structures (05 Nos) in compartment 35 Boniyar
Construction of Wheel Track and Extension of DR Wall of NEC Pampa EPT in Sannidhanam Forest Station of Pampa Range during 2026-27.
Upgradation of Central Control Room, Sheikh Bagh, Srinagar for the Financial Year 2026-27, under CAPEX
Wall path around building perimeter, repair of tiles and washrooms and Earth Dressing in CF Office, Mazbug under UT CAPEX Budget 2026-27
Extraction, Conversion, Carriage and Transportation of Firewood to the tune of 4175 Quintals upto PC Depot Srinagar and Firewood Depot(s) in Tangmarg and Beerwah
Raising of Conifer Polypots in Chitternar Nursery Under scheme CAMPA-NPV for the year 2026-27 in Bandipora Forest Division Chitternar.
Raising of Medicinal Plants in Kanzalwan Nursery Under scheme CAMPA-NPV for the year 2026-27 in Bandipora Forest Division Chitternar.
Maintenance of Kaimaram, Varattichira, Poolakkolly , Hundichira, Karal Vayal, ETC vayals under Tholpetty Forest Station of Tholpetty Range
Maintenance of Kollimoola, Irumbupalam, Mannundi-I, Mannundi-II , 58th pond, etc vayals under Bavali section of Tholpetty Range
Supply of eletronics equipments like computer,laptop, television,mobiles,projector,speaker,water purifier for various offices ,inspection bunglows under Nature study centre Kalady through abhayaranyam FDA during 2026-27
Maintenance of Hosally, Hosanalli, Naikatty, Doddadi-I, Doddadi-II, etc under Dasanghatta section of Tholpetty Range
Vistaline clearance work from Karadikavala to Mullakkudy under Thekkady Range during 2026-27
Vistaline clearance work from Karadikavala to Mangaladevi under Thekkady Range during 2026-27
Desilting of waterholes at Thekkady section in Thekkady Range during 2026-27
Vista clearance over a width of 10 meters within the 20-hectare solar-fenced area from Kuthiran Vazhukkumpara to Vallikkayam and from Melillam to Ninnukuzhi (20KM) at Pattikkad Forest station under Pattikkad Range during 2026-27
Desiliting of waterholes at Methakanam section in Thekkady Range during 2026-27
Vista clearance over a width of 10 meters within the 3-hectare solar-fenced area at Chembamkandam area for 3 KM at Mannamangalam Forest station under Pattikkad Range during the year 2026-27
Vista clearance over a width of 10 meters within the 12-hectare solar-fenced area from Palakunnu to Koshimukku( 12 KM) at Mannamangalam Forest station under Pattikkad Range during the year 2026-27
Planting of Polybag raised saplings and Naked root saplings and Providing and fixing of Barbed wire fencing with Angle iron posts in cement concrete Blocks in compartments 74 Bla,68 Bla, 03 Bla,14 Bla,14 Bla and 69 Baramulla (06 No. of closures)
Construction of Natural Trail Kibbar to Bramhsar Base Camp Bramha Peak Wildlife Chenab Division Kishtwar for the Year 2026 27
Degraded Slope restoration flood protection bunds on river banks by way of strengthening by crate works in Kawradi Kibbar under mitigation plan of KHANP for the Year 2026 27
Degraded Slope restoration flood protection bunds on river banks by way of strengthening by crate works in Rishkodan Kiyar under mitigation plan of KHANP for the Year 2026 27
Upgradation of Range Office Building at Kangan in Sindh Division under the Scheme UT Capex for the Year 2026-27
Planting of Polybag raised saplings and Naked root saplings for Beating Up of causalities in different closures of Kandi Range established during 2023-24, 2024-25 and 2025-26 of Kamraj Forest Division under scheme CAMPA-NPV 2026-27.
Construction of Wooden Foot Bridge at Maithwan Renai Wildlife Chenab Division Kishtwar for the Year 2026 27
Degraded Slope restoration flood protection bunds on river banks by way of strengthening by crate works in Salami kibbar Nallah under mitigation plan of KHANP for the Year 2026 27
Construction of Wooden Foot Bridge at upper chugnu Nanth span 90 ft Wildlife Chenab Division Kishtwar for the Year 2026 27
Degraded Slope restoration flood protection bunds on river banks by way of strengthening by crate works in Guman Nallah under mitigation plan of KHANP for the Year 2026 27
Construction of Wooden Foot Bridge at Burzalgoth Kibbar Wildlife Chenab Division Kishtwar for the Year 2026 27
Planting of Polybag raised saplings and providing and fixing of Barbed wire fencing with Wooden Fence Posts in Earthen Pits for repairment of fencing in already established closure of 2014-15. in comptt. 31/SL in SL Range of Kamraj Forest Division
Planting of Polybag raised saplings and Naked root saplings and providing and fixing of Barbed wire fencing with Angle Iron Posts in cement concrete Blocks in comptt. 38/Mtl. at Pathri, of Kamraj Forest Division under scheme CAMPA-NPV 2026-27.
Polybag raised saplings and Naked root saplings and providing and fixing of Barbed wire fencing with Angle Iron Posts in cement concrete Blocks in comptt. 91/NL. in NL Range of Kamraj Forest Division under scheme CAMPA-NPV 2026-27.
Planting of Polybag raised saplings and Naked root saplings for Beating Up of causalities in different closures of Matchil Range established during 2023-24 of Kamraj Forest Division under scheme CAMPA-NPV 2026-27.
Planting of Polybag raised saplings and Naked root saplings and providing andfixing of Barbed wire fencing with Angle Iron Posts in cement concrete Blocks in comptt. 49/SL at Kultornard SL Range of Kamraj Forest Division under scheme CAMPA-NPV 2026-2
Planting of Polybag raised saplings and Naked root saplings in comptt. 108/NL. in NL Range of Kamraj Forest Division under scheme CAMPA-NPV 2026-27.
Planting of Polybag raised saplings and Naked root saplings for Beating Up of causalities in different closures of SL Range established during 2023-24, 2024-25 and 2025-26 of Kamraj Forest Division under scheme CAMPA-NPV 2026-27.