Loading…
Loading…
335 live273 closing this weekmost from FOREST DEPARTMENT and Forest Department
335 results • Latest
Planting of Polybag raised saplings and Naked root saplings for Beating Up of causalities in different closures of Kupwara Range established during 2024-25 and 2025-26 of Kamraj Forest Division under scheme CAMPA-NPV 2026-27.
Planting of Polybag raised saplings and Naked root saplings for Beating Up of causalities in different closures of NL Range established during 2025-26 of Kamraj Forest Division under scheme CAMPA-NPV 2026-27
Development of Eco Tourism Biodiversity Park in Dedikoot ,Naihari Range Kehmil Forest Division Kralpora
Estimate for the cost of taking weighing cleaned sandalwood and sapwood for various E auctions and other weighings at Sandal depot Marayoor in Marayoor Range during the year 2026-27
New toilet in Section Office Chinnakkanal - Estimate for the cost of construction of new toilet at Chinnakkanal section office under Devikulam Range during 2026-27
Estimate for the cost of cleaning dead and wind fallen sandal trees and top ends collected from NSR I Sandal Reserve at sandal depot Marayoor in Marayoor Range during the year 2026-27
barbed-wire fencing 580 rft with SQPCC fence posts and establishment and maintenance of plantation through planting of departmental saplings 100 Nos., including casualty replacement (beating-up)10A/TH PANSSA under CAMPA CA 20
Construction of Mesh Wire fencing Surjandhar Nursery Compt. 15/R of Reasi Range with fencing 1000 rft with Mesh Wire conforming to the product code GA-BW all SQPCC fence SQPCC post concrete, under CAMPA NPV 2026-27 of Reasi Forest Division
Cost of construction sculpture to mark the celebration of Eravikulam National Park
Cost of maintenance of Trek path from Pothinkandam to Pattiyankal 3.40 km in Pambadum Shola National Park under
Cost of maintenance of Trek path from NEC to Estate mala 1.90 km in Pambadum Shola National Park under Shola National Parks
Vayal maintenance in various places Dottapalam, Kurichiat, Kattivayal, Dottakulassi, Kummichivayal, etc of Vandikkadavu Forest Station in Kurichiat Range
Cost of maintenance of Trek path from Manathalam to Bendher 6.00 km in Pambadum Shola National Park under Shola National Parks
Cost of maintenance of Trek path from Kuttikadu to Pultheri 3.00 km in Pambadum Shola National Park under Shola National Parks
Cost of Maintenance of Trek path from Checkpost to Manathalam 4.50 km in Pambadum Shola National Park under Shola National Parks
Maintenance of Chundakolly vayal, Chelakolly Vayal, Varalam vayal, Machikudy Vayal, Arakunji vayal, etc under Ottippara Section of Sulthan Bathery Range
Cost of maintenace of trek path from Check post to Esate mala 3.00 km in Pambadum Shola National Park under Shola National Parks
Cost of maintenance of Trek path from Sukumarankadu to Choondal 2.70 km in Mathikettan Shola National Park under Shola National Parks
Cost of maintenance of Trek path from Jameskadu to Vellapara 1.90 km in Mathikettan Shola National Park under Shola National Parks
Cost of maintenance of Trek path from Check dam to Pattiyangal 2.25 km in Pambadum Shola National Park under Shola National Parks
Maintenance of Edavambam vayal, Kattichakulam, Machikudy, Muthukkikuni, Ponnachankolly, Udhimaram vayal, etc under Naikketty FS under Sulthan Bathery Range
Cost of maintenance of Trek path from Sivanpara to Theepettikavala 2.00 km in Mathikettan Shola National Park under Shola National Parks
Cost of maintenance of Trek path from Choondal to DYSP Kavala 2.70 km in Mathikettan Shola National Park under Shola National Parks
Cost of maintenance of Trek path from Checkpost to Vellapara 2.50 km in Mathikettan Shola National Park under Shola National Parks
Cost of maintenance of Trek path from Thupakkimedu to Kottaram 1.50 km in Kurinjimala Sanctuary under Shola National Parks
Cost of maintenance of Trek path from Checkpost to Kudi 4.50 km in Mathikettan Shola National Park under Shola National Parks
Cost of maintenance of Trek path from Kurinji hut to Thattampara 1.50 km in Kurinjimala Sanctuary under Shola National Parks
Cost of maintenace of Pothumchal to Kootivathodu 1.00 km in Anamudi Shola National Park under Shola National Parks
Cost of maintenance of Trek path from Kadavari Top to Kurangupara 3.00 km in Kurinjimala Sanctuary under Shola National Parks
Cost of maintenance of Trek path from Pambadum Shola hut to Attinkoodu 3.80km in Kurinjimala Sanctuary under Shola National Parks
Cost of maintenance of trek path from Perumala area 2.00 km in Anamudi Shola National Park under Shola National Parks
Cost of maintenace of trek path from Samiyarala-Padikette to Pazhathottam 3.70 km in Anamudi Shola National Park under Shola National Parks
Cost of maintenance of Trek path from Kadavari to Thampuranshola 1.80 km in Kurinjimala Sanctuary under Shola National Parks
Cost of maintenance of Trek path from Checkdam to Kadavari kava 3.00 km in Kurinjimala Sanctuary under Shola National Parks
Cost of maintenace of trek path from Pothumchal to Jandamala hut 2.10 km in Anamudi Shola National Park under Shola National Parks
Cost of maintenance of trek path from Kulachavayal to Theerthamala 2.00 km in Anamudi Shola National Park under Shola National Parks
Cost of maintenace of trek path from Thampurankavala to Mattuchola 3.80 km in Anamudi Shola National Park under Shola National Parks
Cost of maintenance of trek path from Moonam mile to Anivera 3.00 km in Anamudi Shola National Park under Shola National Parks
Cost of maintenance of trek path from Perumala to Idallimotta 3.50 km in Anamudi Shola National Park under Shola National Parks
Cost of maintenance of trek path from Kadukumudi to Ottakomban 2.00 km in Anamudi Shola National Park under Shola National Parks during
Cost of maintenance of trek path from Eetavalave to Anakoppam 1.50 km in Anamudi Shola National Park under Shola National Parks
Supplying Installing Commissioning Solar Fencing 0.50 Kms for the Protection of Manjeeri Unnathi under Nedumgayam FS of Karulai Range under Nilambur South Division during 2026-27
Extraction and Transportation of Firewood including its allied operation from various compartments of Rafiabad Range upto FSD Watergam
Estimate for the cost of Working down Hardwood Timber, Teak and Teak Poles by way of Final Felling from 8.76 ha of 1962 TP Elival in Elival Section of Olavakode Range in Palakkad
Conversion of existing Car shed to RRT Restroom-Estimate for the cost of construction of existing car parking shed converted to RRT rest room and new toilet for field staff in Chinnakkanal section in Devikulam Range during 2026-27
The work is to improve the solar fencing by converting the existing malfunctioning solar fencing into Hanging Solar Fencing from Kuthiramudi to Koovapparathandu of Pooyamkutty Forest Station under Kuttampuzha Range
Planting of Polybag raised saplings and Naked root saplings and Providing and fixing of Barbed wire fencing with Angle iron posts in cement concrete Blocks and Construction of Water Harvesting structures (07 Nos) in compartment 76/Uri Rustum Post
Installation of 5 line solar fencing 1.9 KM from Vazhakkod to Pattanikkad under Vazhani Forest station under Machad Range through Projects under LAC -ADS (NP) fund during 2026-27