Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹16.8 L
EMD Value
₹33,640
Closing Date
16 Nov 2026, 6:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
DFO Udhampur
DFO Udhampur
Installation of Boundary pillars 241 nos. in Chai Lodra Forest of Panchari Forest Range of Udhampur Forest Division under CAMPA NPV FY 2026-27
2026_FD_330972_1
72 NIT of 2026-27
Open Tender
Civil Works
Percentage
45 days
Panchari Range
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
DFO Udhampur
₹33,640
11 Nov 2026
11 Nov 2026
17 Nov 2026
11 Nov 2026
16 Nov 2026
11 Nov 2026
11 Nov 2026 - 16 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil. | 83.18 | Cum | 479.3 | ₹39,868.17 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand :6 graded stone aggregate 20mm nominal size) Crushed | 47.35 | Cum | 5,733.6 | ₹2,71,485.96 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 20.48 | Cum | 218.4 | ₹4,472.83 |
| 4 | Reinforced cement concrete work in walls including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor five level, including curing but excluding the cost of centring, shuttering and finishing with. 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | 30.71 | Cum | 9,395.7 | ₹2,88,541.95 |
| 5 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Cold twisted bars | 1,400.15 | Kg | 123.2 | ₹1,72,498.64 |
| 6 | Painting of pillars (with superior exterior paint) including cost of labour charges including painting of Forest Department LOGO and the front face of the pillar with stencil. For mainline BPs, Red Shade: Adventure 2189 (Nerolac) and for chak BPs Yellow shade: Bumble Bee 2014. (Nerolac) Exterior Emulsion paint is recommended incl carriage complete job. | 241 | Each | 500 | ₹1,20,500 |
| 7 | Centering and shuttering including strutting propping etc and removal of form work for columns, piers, abutments, pillars, posts and struts | 537.55 | Sqm | 628.95 | ₹3,38,092.07 |
| 8 | Carriage of Bajri from source to site of work by M.T./H.L average | 74.94 | Cum | 4,001.05 | ₹2,99,838.69 |
| 9 | Carriage of Sand from source to site of work by M.T./H.L average | 36.69 | Cum | 4,001.05 | ₹1,46,798.52 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_1123240.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .