Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹7.9 L
EMD Value
₹15,831
Closing Date
25 Nov 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
DFO Special Forest Division Tangmarg
Office of the Divisional Forest Officer Special Forest Division Tangmarg, Kashmir, Jammu and Kashmir
Providing and Fixing of Barbed Wire Fencing with Angle Iron Posts in Cement Concrete Blocks (6 Strand) and Planting in 34/Gul, Gulmarg Range, Tangmarg.
2026_FD_331047_1
e-NIT NO 15 OF 2026-27 (Tangmarg Forest Division)
Open Tender
Civil Works
Percentage
90 days
Tangmarg
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Centralized Pooling Account No. 0110010200001102
₹15,831
12 Nov 2026
12 Nov 2026
26 Nov 2026
12 Nov 2026
25 Nov 2026
12 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Barbed Wire Fencing with Angle Iron Posts | |||||
| 1.01 | E/W in excavation in foundation trenches or drains (not exceeding 1.5 mts in width as well as 10 sqmts on plan) including dressing of sides & ramming of bottoms, lift up to 1.5mts & lead of 50 mts including getting out the excavated soil and disposal of surplus excavated soil as directed. | 15.59 | CUM | 479.3 | ₹7,472.29 |
| 1.02 | Block for angle iron posts (after every 8 feet) | - | - | - | - |
| 1.03 | Entrance gate and board | - | - | - | - |
| 1.04 | Providing & laying dry stone solling including ramming, dressing etc complete in foundations and under floors,including carriage & head load | 2.92 | CUM | 1,000 | ₹2,920 |
| 1.05 | Block for angle iron posts | - | - | - | - |
| 1.06 | Entrance gate and board | - | - | - | - |
| 1.07 | Deduct 15% voids | - | - | - | - |
| 1.08 | Providing & laying cement concrete 1:3:6 mix using 1 cement : 3 coarse sand : 6 graded stone aggregate 20 nominal size of specificied grade excl cost of centering and shuttering. All works up to plinth Level. | 15.59 | CUM | 5,733.6 | ₹89,386.82 |
| 1.09 | Block for vertical columns | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.60 MB
BOQ_1123678.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .