Loading…
Loading…
335 live273 closing this weekmost from FOREST DEPARTMENT and Forest Department
335 results • Latest
Additional works for IB Facility improvement-Staff Dining area and cupboard works in Pariyaram range
Maintenance of Cheriya Vengoor, Erayam Vayal,Vattampara Vayal, Kumizhy (Puthanchira, Amboothy Vayal, etc under Thottamoola Forest Station of Muthanga Range
Afforestation work using 7 strand black annealed barbed wire BA GW fencing with square PPC or wooden fence posts at 10 feet spacing including plantation of poly bagged and naked root plants saplings patch sowing plantation of grass slips BUC of 1st y
Providing and fixing of Barbed wire fencing with Angle Iron Posts in cement concrete Blocks in comptt. 23/Kandi (Harwan) in Kandi Range of Kamraj Forest Division under scheme CAMPA-NPV 2026-27.
roviding and fixing of Barbed wire fencing with Angle Iron Posts in cement concrete blocks for development of evicted area in comptt. 24/Kandi at Yemberzalwari, Kandi Range of Kamraj Forest Division under scheme UT-CAPEX Budget 2026-27.
Planting of Naked root saplings and providing and fixing of Barbed wire fencing with Angle Iron Posts in cement concrete Blocks for developement of fodder bank in comptt 79/NH at Haji Naka Kupwara Range of Kamraj Forest Division under scheme CAMPA-NP
Planting of Polybag raised saplings and Naked root saplings for enrichment of existing closure created during 2020-21. in comptt. 35/Watlub. Kandi Range of Kamraj Forest Division under scheme CAMPA-NPV 2026-27.
Planting of Polybag raised saplings and Naked root saplings for enrichment of existing closure created during 2020-21. in comptt. 28/Kandi Triumkhan Top. Kandi Range of Kamraj Forest Division under scheme CAMPA-NPV 2026-27.
Planting of Polybag raised saplings and providing and fixing of Barbed Wire and Chain Link fencing with Angle Iron Posts in cement concrete Blocks in comptt. 34/Kandi Hab-saben Tall Watlub in Kandi Range of Kamraj Forest Division under scheme CAMPA-
Providing and fixing of Barbed wire fencing with Angle Iron Posts in cement concrete Blocks in comptt. 24/Kandi Bomai in Kandi Range of Kamraj Forest Division under scheme CAMPA-NPV 2026-27.
Vista clearance (5m both sides) on both sides of Puliyara to Thumpappara in Ommala Forest Station under Agali Range during 2026-27.
ESTIMATE FOR THE COST OF PROVIDING INTERLOCKING TILE AT DEPOT ROAD IN ARANYABHAVAN FOREST COMPLEX PARAMPUZHA,KOTTAYAM 2026-27
Vistaline clearance work from entrance checkpost to boat landing in Thekkady Range during 2026-27
MAINTENANCE OF DEPOT BUILDING IN TIMBER DEPOT VETTIKKAD 2026-27
Vistaline clearance work from First Gate to Karadikavala in Thekkady Range during 2026-27
Desiliting of checkdam at Anchuruli in Thekkady Range during 2026-27
Desilting of waterhole at Nellikkampetty section in Thekkady Range during 2026-27
Vistaline clearance work from Anchuruli Gate to Anchuruli in Thekkady Range during 2026-27
working down of 201 Trees Dangerously Standing at Govt.Timber Depot, Achencovil in Achencovil Range during 2026-27
Repairs/ Renovation/ Construction of Boundary Pillars, in S-Park Range, Srinagar
Construction of Wooden Foot Bridge at Kiddar Nanth Wildlife Chenab Division Kishtwar for the Year 2026 27
Construction of 08 B.Ps No. Demarcation Boundary Pillars as per approved design along the Forest Demarcation line (Mainline B.Ps Only) as per the map/Tafseel- i-burjiyaat in Tilsar Forest of Pir Pnajal Forest Division, Budgam. Comptt. No. N1a.
Erection of 5 line Solar Power Fence in the gaps of the existing 4 km Elephant Proof Trench at rocky portions, stream crossings, and other obstructions from Cherukadavu to Uppukuzhy of Ambanar FS under Pathanapuram Range during FY 2026-27
Installation of Boundary Pillar (275 ML) at Malla Pukharni Forest Chowki Block of Kalidhar Forest Range, Jammu Forest Division, under CAPEX for the year 2026-27.
Erecting chain linked fencing work at Mannakkudy area under Thekkady Range during 2026-27
Erecting chain linked fencing work at Paliyakkudy area under Thekkady Range during 2026-27
GENERAL-Collapsible Door-Providing and Fixing Collapsible Door at Pettimudy Station Under Munnar Range -2026-27-General Civil Work
Constructing a Toilet attached to the Check Post, Karavoor under Pathanapuram Range during 2026-27.
Installation of Boundary Pillar (317 CL) at Dhori Forest Panjgrain Block of Kalidhar Forest Range, Jammu Forest Division, under CAPEX for the year 2026-27
Vista Line Clearance on either sides of trek path from Pallivasal to Padappanpara (8Km) in Ettappadappu Section of Shendurney Wild Life Sanctury during 2026-27
Vista Line Clearance on either sides of trek path from Mannanthara to Idimuzhanganpara (8Km) in Kalamkunnu Section of Shendurney Wild Life Sanctury during 2026-27
Providng and fixing of crash barrier at Jambu Zoo
01 Construction of Mesh Wire Chain link Fencing 1822 Rft 02 Construction of Main gate 03 Formation of nursery beds 04 Automated mist chamber house 05 Construction of naturally ventilated poly green house 06 Genset room 07 Construction of mali hu
Stream bank protection by way of creates wire bunding at Co.No. 14 Kazinag National park (Baramulla Range