Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹5.8 L
EMD Value
₹11,620
Closing Date
20 Nov 2026, 6:00 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Divisional Forest Officer
Anantnag Forest Division Anantnag
Upgradation of Range Officers Quarter Verinag, Anantnag Forest Division.
2026_FD_331161_1
e-NIT No. 08 OF 2026-27 (Anantnag Forest Division)
Open Tender
Agricultural or Forestry
Percentage
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
JandK Forest Centralized Pooling Account No.
₹11,620
13 Nov 2026
13 Nov 2026
21 Nov 2026
13 Nov 2026
20 Nov 2026
13 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed. All kinds of soil | 5.55 | CUM | 479.3 | ₹2,660.12 |
| 2 | Providing & laying dry stone solling, sand/dust including ramming, dressing etc complete in foundations and under floors, including Mech. Carriage & Head load charges up to site of work complete. | 0.97 | CUM | 1,000 | ₹970 |
| 3 | Providing & laying in position cement concrete (1cement: 4 coarse sand: 8 graded stone agg 40mm nominal size) mix of specificied grade excl cost of centering and shuttering. All work upto plinth level. | 1.15 | CUM | 5,202.9 | ₹5,983.33 |
| 4 | Centering and shuttering including strutting, propping etc and removal of form work for.Foundations, footings, bases of columns etc. | 9.76 | SM | 286.35 | ₹2,794.78 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) | 3.96 | CUM | 6,540.45 | ₹25,900.18 |
| 6 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm bed of dry brick ballast 40mm nominal size well rammed and consolidated and grouted with fine sand including finishing the top smooth and curing complete. | 21.38 | SM | 572.8 | ₹12,246.46 |
| 7 | 12 mm cement plaster of mix 1:4. (1 cement : 4 coarse sand ). | 46.89 | SM | 283.8 | ₹13,307.38 |
| 8 | Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete. 200x10 mm | 20 | NO | 300.05 | ₹6,001 |
| 9 | Providing and fixing bright finished brass handles with screws etc. complete : 125 mm | 10 | NO | 232.6 | ₹2,326 |
| 10 | Providing and fixing 85x42mm chromium plated brass pull bolt lock with necessary C.P. brass screws, nuts, bolts and washers etc. complete. | 5 | NO | 278.75 | ₹1,393.75 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_1123937.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .