| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.7 L+₹908.71 (0.14%)Admitted-Fee/PreQual/Technical/Finance | ₹6.7 L+₹908.71 (0.14%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.7 L+₹2,654.80 (0.40%)Admitted-Fee/PreQual/Technical/Finance | ₹6.7 L+₹2,654.80 (0.40%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹6.8 L+₹10,061.43 (1.50%)Admitted-Fee/PreQual/Technical/Finance | ₹6.8 L+₹10,061.43 (1.50%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SABU C L2 | Johny Joseph, Panakuzhy Constructions L3 | Sasidharan Nair K K L1 | Iqbal m m L4 |
|---|---|---|---|---|---|---|---|
| 1.00Toilet Construction | |||||||
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 1.24 | cum | 1,870 ₹2,313.19 | 1,874.25 ₹2,318.45 | 1,869 ₹2,311.95 Lowest | 1,895.55 ₹2,344.8 |
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 0.68 | cum | 1,364.79 ₹921.23 | 1,367.89 ₹923.33 | 1,364 ₹920.7 Lowest | 1,383.44 ₹933.82 |
| 1.00 | 6.47:Providing and laying Autoclaved Aerated concrete (AAC) blocks masonry
150mm/230mm/300 mm thick with Grade- I AAC blocks in super structure
above plinth level up to floor V level with RCC band at sill level and lintel
level with approved block laying polymer modified adhesive mortar all
complete as per direction of Engineer-in-Charge. (The payment of RCC band
and reinforcement shall be made for seperately). | 16.23 | cum | 7,942.2 ₹1,28,886.02 | 7,960.29 ₹1,29,179.59 | 7,941 ₹1,28,866.55 Lowest | 8,050.75 ₹1,30,647.57 |
| 1.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 2.47 | cum | 11,802.2 ₹29,116.03 | 11,829 ₹29,182.14 | 11,802 ₹29,115.53 Lowest | 11,963.5 ₹29,513.95 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 12.78 | sqm | 669.8 ₹8,560.04 | 671.33 ₹8,579.6 | 669 ₹8,549.82 Lowest | 678.96 ₹8,677.11 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 9.6 | sqm | 843.96 ₹8,102.02 | 845.89 ₹8,120.54 | 843 ₹8,092.8 Lowest | 855.5 ₹8,212.8 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 218.97 | kilogram | 98.71 ₹21,614.92 | 98.93 ₹21,663.1 | 98 ₹21,459.45 Lowest | 100.06 ₹21,910.54 |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 112.22 | sqm | 324.64 ₹36,430.45 | 325.38 ₹36,513.49 | 323 ₹36,246.41 Lowest | 329.08 ₹36,928.7 |
| 1.01 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 8.44 | sqm | 278.59 ₹2,350.74 | 305.31 ₹2,576.21 | 278 ₹2,345.76 Lowest | 282.4 ₹2,382.89 |
Tender Value
₹7.6 L
EMD Value
₹19,066
Closing Date
22 Sept 2026, 10:00 amClosed
ASSISTANT ENGINEER
LIDEW SUBDIVISION KADUTHURUTHY BP
Construction of womens friendly toilet at AJ JOHN Higher secondary school Thalayolaparambu GP
2026_LSGD_869587_1
04/AE/KDTYBK/26-27
Open Tender
Civil Works - Buildings
Item Rate
180 days
KADUTHURUTHY BP
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,685
Yes
₹19,066
Yes
23 Sept 2026
15 Sept 2026
23 Sept 2026
15 Sept 2026
22 Sept 2026
15 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Toilet Construction | |||||
| 1.001 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 1.24 | cum | - | - |
| 1.002 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 0.68 | cum | - | - |
| 1.003 | 6.47:Providing and laying Autoclaved Aerated concrete (AAC) blocks masonry
150mm/230mm/300 mm thick with Grade- I AAC blocks in super structure
above plinth level up to floor V level with RCC band at sill level and lintel
level with approved block laying polymer modified adhesive mortar all
complete as per direction of Engineer-in-Charge. (The payment of RCC band
and reinforcement shall be made for seperately). | 16.23 | cum | - | - |
| 1.004 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 2.47 | cum | - | - |
| 1.005 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 12.78 | sqm | - | - |
| 1.006 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 9.6 | sqm | - | - |
| 1.007 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 218.97 | kilogram | - | - |
| 1.008 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 112.22 | sqm | - | - |
| 1.009 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 8.44 | sqm | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_1473491.xls
BOQ • 0.33 MB
EPAY.pdf
Additional Documents • 0.23 MB
PRELI.pdf
Additional Documents • 0.26 MB
FORM.pdf
Other Document • 0.25 MB
PACT.pdf
Other Document • 0.23 MB
AFFI.pdf
Other Document • 0.24 MB
SBD.pdf
Tender Documents • 0.96 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .