Tender Value
₹24.1 L
EMD Value
₹24,100
Closing Date
1 Jul 2026, 5:00 pmClosed
Divisional Officer
SE Rourkela
Improvement to Tahasil at Uditnagar, Rourkela (Such as Construction of Additional Office Room) Buildings.
2026_EICCL_132342_1
NIT 07 of 2026-27
Open Tender
Civil Works - Buildings
Percentage
90 days
Sundergarh
2 documents required · 2 mandatory
₹6,000
₹24,100
Yes
7 Sept 2026
19 Jun 2026
2 Jul 2026
19 Jun 2026
1 Jul 2026
19 Jun 2026
19 Jun 2026 - 25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Work Part-I Dismantling and removing old tiled flooring including removing the base coars and stacking the useful materials for reuse and removing the debries within 50 M lead. | 140 | sqm | 147.37 | ₹20,631.8 |
| 2 | Earth work in excavation in foundation in all kinds of soil including dressing and leveling the bed and depositing the soil within initial lead of 50 M and initial lift of 1.5 M as may be directed and providing shoring and shuttering & struts if necessary complete. | 32.69 | cum | 306.01 | ₹10,003.47 |
| 3 | Supplying, filling in foundation and plinth with sand well watered and rammed in 22.5cm 9 layers with all leads and lifts cost, conveyance, labour, T&P etc. complete (measurement will be taken on finished compacted section only) | 45.02 | cum | 554.59 | ₹24,967.64 |
| 4 | Cement concrete (1:3:6) in foundation and plinth with HGCB metal of 4cm. (1/2) size including lowering, laying, cost, conveyance, royalties, taxes, labour, T&P watering, curing etc. complete. | 17.36 | cum | 5,917.18 | ₹1,02,722.24 |
| 5 | Fly Ash brick work in cement mortar (1:6) in Foundation and Pinth including splays and cutting circular molding, watering and curing all cost, conveyance, royalties, taxes, labour T&P etc. complete. | 7.62 | cum | 5,600.96 | ₹42,679.32 |
| 6 | Supplying, cutting, bending, binding and tying the M.S. rod or Tor steel for RCC work including cost of all labour and materials etc. complete.(i) Ground Floor | 1.5 | qtl | 9,514.32 | ₹14,271.48 |
| 7 | RCC work of M-20 grade with 20mm & down grade black hard granite (crusher broken) stone chips including hoisting & laying including centering, shuttering, watering and curing with cost, conveyance, royalties and taxes of all materials and cost of all labour, T&P etc. complete as per direction of the Engineer-in-charge. | 0.75 | cum | 5,984.48 | ₹4,488.36 |
| 8 | Fly Ash brick work in cement mortar (1:6) in superstructure including splays and cutting circular molding, watering and curing all cost, conveyance, royalties, taxes, labour T&P etc. complete. | 24.65 | cum | 5,634.29 | ₹1,38,885.25 |
| 9 | 16mm (1/2) thick cement plaster (1:6) finished in ceiling smooth including watering and curing etc. with cost and conveyance of all materials etc. complete. | 107.2 | sqm | 275.33 | ₹29,515.38 |
| 10 | 12mm ( ½) thick cement plaster (1:6) finished smooth to brick walls after racking out joints including watering, curing all cost, conveyance, royalties, taxes, labour, T&P etc. complete. | 107.2 | sqm | 189.98 | ₹20,365.86 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 1.26 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
Tendernotice_2.pdf
PDF • 6.68 MB
BOQ_596968.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .