Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹3.9 L Conversion of border security fencing from phase-II/III to new design fence in West Bengal between BP No. 243/MP to 764/2-S (Length 210.028 km). SH In various stretches from BP. No. 355/2-S to 357/1-S (4.725 km), 361/M to 365/M (6.329 km), 385/2-S to 385/5-S (0.800 km), near BP. No. 399/8-R (0.030 km), 401/6-S to 402/2-S (0.180 km) and 409/5-S to 417/8-S (15.383 km) (Total Length 27.447 km including intermediate BOPs reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc.) along Indo Bangladesh Border in the district of Uttar Dinajpur, West Bengal. (Package-V) in EPC Mode-III. SW- Manual cleaning & sweeping of the campus and office building of BFD-II, IBBZ-I, CPWD, Islampur during 2025-26. | Conversion of border security fencing from phase-II/III to new design fence in West Bengal between BP No. 243/MP to 764/2-S (Length 210.028 km). SH In various stretches from BP. No. 355/2-S to 357/1-S (4.725 km), 361/M to 365/M (6.329 km), 385/2-S to 385/5-S (0.800 km), near BP. No. 399/8-R (0.030 km), 401/6-S to 402/2-S (0.180 km) and 409/5-S to 417/8-S (15.383 km) (Total Length 27.447 km including intermediate BOPs reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc.) along Indo Bangladesh Border in the district of Uttar Dinajpur, West Bengal. (Package-V) in EPC Mode-III. SW- Manual cleaning & sweeping of the campus and office building of BFD-II, IBBZ-I, CPWD, Islampur during 2025-26. | L1 | |
| 2 | L2₹3.9 L+₹1,552.58 (0.40%) Conversion of border security fencing from phase-II/III to new design fence in West Bengal between BP No. 243/MP to 764/2-S (Length 210.028 km). SH In various stretches from BP. No. 355/2-S to 357/1-S (4.725 km), 361/M to 365/M (6.329 km), 385/2-S to 385/5-S (0.800 km), near BP. No. 399/8-R (0.030 km), 401/6-S to 402/2-S (0.180 km) and 409/5-S to 417/8-S (15.383 km) (Total Length 27.447 km including intermediate BOPs reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc.) along Indo Bangladesh Border in the district of Uttar Dinajpur, West Bengal. (Package-V) in EPC Mode-III. SW- Manual cleaning & sweeping of the campus and office building of BFD-II, IBBZ-I, CPWD, Islampur during 2025-26. | Conversion of border security fencing from phase-II/III to new design fence in West Bengal between BP No. 243/MP to 764/2-S (Length 210.028 km). SH In various stretches from BP. No. 355/2-S to 357/1-S (4.725 km), 361/M to 365/M (6.329 km), 385/2-S to 385/5-S (0.800 km), near BP. No. 399/8-R (0.030 km), 401/6-S to 402/2-S (0.180 km) and 409/5-S to 417/8-S (15.383 km) (Total Length 27.447 km including intermediate BOPs reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc.) along Indo Bangladesh Border in the district of Uttar Dinajpur, West Bengal. (Package-V) in EPC Mode-III. SW- Manual cleaning & sweeping of the campus and office building of BFD-II, IBBZ-I, CPWD, Islampur during 2025-26. | L2 |
| Sl No | Description | Qty | Unit | BHOWMICK BUILDERS L1 | GOLAM MUSTAFA L2 |
|---|---|---|---|---|---|
| 1 | Manual cleaning & sweeping of the campus and office building of BFD-II, IBBZ-I, CPWD, Islampur during 2025-26 | - | - | -0.5 ₹3,86,205.27 Lowest | -0.1 ₹3,87,757.85 |
Tender Value
₹3.9 L
EMD Value
₹7,763
Closing Date
30 Sept 2025, 4:00 pmClosed
AE(C)-2
Hitesh Meena
Border Fencing Sub Division Raiganj
Conversion of border security fencing from phase-II/III to new design fence in West Bengal between BP No. 243/MP to 764/2-S (Length 210.028 km). SH In various stretches from BP. No. 355/2-S to 357/1-S (4.725 km), 361/M to 365/M (6.329 km), 385/2-S to 385/5-S (0.800 km), near BP. No. 399/8-R (0.030 km), 401/6-S to 402/2-S (0.180 km) and 409/5-S to 417/8-S (15.383 km) (Total Length 27.447 km including intermediate BOPs reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc.) along Indo Bangladesh Border in the district of Uttar Dinajpur, West Bengal. (Package-V) in EPC Mode-III. SW- Manual cleaning & sweeping of the campus and office building of BFD-II, IBBZ-I, CPWD, Islampur during 2025-26.
127836
13/NIT/EE/BFD-II/BFSD-II/2025-26
OPEN
Manpower Supply
NCB
12 months
Gurdaspur, Punjab
6 documents required · 6 mandatory
₹7,763
Not Applicable
30 Sept 2025
23 Sept 2025
30 Sept 2025
30 Sept 2025
29 Sept 2025
stage.html
html • 0.07 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT13.pdf
document • 1.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .