Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical ACCEPT |
| 2 | Accepted-Technical VPO KHEWRA TEHSIL RAI SONEPAT 131021 | SONIPAT | HARYANA | 131021 | Accepted-Technical ACCEPT |
| 3 | Accepted-Technical VPO BAIYAPUR TEHSIL AND DISTT SONEPAT | SONEPAT | SONEPAT | HARYANA | Accepted-Technical ACCEPT |
| 4 | Accepted-Technical | Accepted-Technical ACCEPT |
| 5 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹22.9 L
EMD Value
₹45,890
Closing Date
9 Oct 2026, 10:00 amClosed
Padam Bhushan
Muncipal Corporation Sonipat
1361 - Estimate for laying of Jaals on various side drain and making connection of side drains in main line in village Rai,Jaat joshi and Livan ward no. 8 under MC Sonipat
2026_HRY_551920_1
2026A88D1954 42AF 4833 AF11 0EB291914FE2292ULB
Open Tender
Civil Works
Works
120 days
Sonepat
2 documents required · 2 mandatory
₹1,000
₹45,890
Yes
9 Oct 2026
2 Oct 2026
9 Oct 2026
2 Oct 2026
9 Oct 2026
2 Oct 2026
2 Oct 2026 - 4 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [1.PM014] PM014. Hydraulic Excavator (3D) with driver and fuel [Rate] | 10 | Per day | 10,716 | ₹1,07,160 |
| 2 | [1.PM026] PM026. Tractor with trolley [Rate] | 20 | Per day | 6,237 | ₹1,24,740 |
| 3 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 11,920 | Kg. | 83 | ₹9,89,360 |
| 4 | [17.23.3]Water Bound Macadam Grading - II 3. Water Bound Macadam – I & II with crushable screenings Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate] | 50 | cum | 1,280 | ₹64,000 |
| 5 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate] | 500 | cum | 83 | ₹41,500 |
| 6 | [6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 80 | cum | 3,975 | ₹3,18,000 |
| 7 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 30 | cum | 4,374 | ₹1,31,220 |
| 8 | [6.15.1]Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 50 | cum | 5,969 | ₹2,98,450 |
| 9 | [6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform [Through Rate] | 50 | Sqm | 208 | ₹10,400 |
| 10 | [6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars [Through Rate] | 1,000 | Kg. | 68 | ₹68,000 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_631757.xls
BOQ • 0.29 MB
AD0181418.pdf
Additional Documents • 1.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .