Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC NO 13 GROUND FLOOR EVALAPPAN STREET TAMBARAM SANITORIUM KANCHIPURAM TAMIL NADU 600047 | CHENGALPATTU | TAMIL NADU | 600047 | L1 | Accepted-AOC Being the L1 Bidder | |
| 2 | L2₹1.3 Cr+₹33.4 L (32.9%)Rejected-Finance 26 430 CHANGAMPUZHA NAGAR P O KALAMASSERY ERNAKULAM KERALA 682 033 | KALAMASSERY | ERNAKULAM | KERALA | 682033 | L2 | Rejected-Finance Being L2 Party |
Tender Value
₹1.6 Cr
EMD Value
₹2 L
Closing Date
30 Jun 2022, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
HOD -TSP
HOD TSP
Supply Assistance in Erection Commissioning of thyristor controller and transformer unit for Magnesium recycling plant project at The Titanium Sponge Plant KMML
2022_KMML_490317_1
TSP/PROJ/MRP/TCT/PACKAGE-2
Open Tender
Miscellaneous Works
Supply and Service
60 days
Titanium Sponge Plant UNIT
Please refer Tender documents.
6 documents required · 6 mandatory
₹27,907
₹2 L
TSP UNIT OF KMML
4 Nov 2022
27 May 2022
1 Jul 2022
27 May 2022
30 Jun 2022
30 May 2022
9 Jun 2022
180 days
Thyristor controller and Transformer unit
Design, engineering, manufacturing, testing at works and supply of (i) Thyristor unit to regulate 3 phase to 3 phase output voltage and (ii) a step down transformer of 2 phase 50 Volts (max), 2500 A (max), 50 Hz as output and 3 Phase, 0-415V, 50 Hz supply as input. Power cum control panel, breaker control for incoming and outgoing of transformer, Oil required for cooling of step down transformer and all accessories conforming to the attached specification and data sheets.
Design, engineering, manufacturing, testing at works and supply of (i) Thyristor unit to regulate 3 phase to 3 phase output voltage and (ii) a step down transformer of 2 phase 50 Volts (max), 5000 A (max), 50 Hz as output and 3 Phase, 0-415V, 50 Hz supply as input. Power cum control panel, breaker control for incoming and outgoing of transformer, Oil required for cooling of step down transformer and all accessories conforming to the attached specification and data sheets.
Erection Assistance:- Assistance during erection & commissioning the enire system at TSP,KMML, Chavara, Kollam, Kerala.
Spares for Transformer:- Support insulators
Spares for Transformer:- Epoxy bushing
Spares for Transformer:- LV bushing terminal
Spares for Transformer:- Winding protection unit
Spares for Transformer:- Winding temperature indicator with contacts
Spares for Transformer:- Oil temperature indicator with contacts
Spares for Transformer:- Magnetic oil level gauge
Spares for Transformer:- Diaphragm of Explosion vent
Spares for Transformer:- Buchholz relay
Spares for Transformer:- Silica gel (for 3 changes)
Spares for Transformer:- Complete set of gaskets
Spares for Transformer:- Control MCB (1 No for each rating)
Spares for Thyristors:- Thyristor (1 No for each rating)
Spares for Thyristors:- Communication cable (Flat ribbon) for controller to power unit
Spares for Thyristors:- Communication cable (Flat ribbon) for between power unit
Spares for Thyristors:- Cooling fan for controller
Spares for Thyristors:- Cooling fan for power unit
Spares:- Supply of any other spares as recommended by manufacturer for two years of operation
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .