Chief General Manager (P), Gujarat Water Infrastructure Limited
Comprehensive Operation & Maintenance of Civil & Electromechanical assets such as sump, all civil structures, pump house, bulk transmission pipeline, valves, pumping machinery electrical equipment etc. for the NC-22 Project, including proper supply of water as per demand for 60 months period including various civil work for NC-22 scheme strengthening. Dist: Kachchh. (2nd Attempt)
281821
07/2026
Open
Civil Works - Water Works
Works
Gandhinagar
3 documents required · 3 mandatory
₹6,000
Chief General Manager (P), Gujarat Water Infrastructure Limited
₹3.4 L
27 Feb 2026
27 Feb 2026
27 Feb 2026
16 Mar 2026
27 Feb 2026
Estimated Cost: Rs.3,40,39,013.40
Chief General Manager (Project)
GUJARAT WATER INFRASTRUCTURE
LIMITED Gandhinagar
Bid Documents for
Five-year O&M of NC 22 Project
SR.NO. PARTICULARS PAGE NO
3 Schedule – A 8-9
Volume-III, PRICE BID NC-22
Name of Work: Comprehensive Operation & Maintenance of Civil & Electromechanical
assets such as sump, all civil structures, pump house, bulk transmission pipeline,
valves, pumping machinery electrical equipment etc. for the NC-22 Project, including
proper supply of water as per demand for 60 months period including various civil
work for NC-22 scheme strengthening. Dist: Kachchh
(1) The bidder shall quote his firm and fixed price for the entire work under
this Contract, defined in more details in various sections of this bid
(2) The rates and prices shall be submitted in the electronic formats given by
n-procure which is called Schedule-B& Schedule-C. Rates and prices
received in any other formats will be rejected and the Bids will be
(3) It will be entirely at the discretion of the Employer to accept or reject the
bidder’s proposal, without giving any reasons whatsoever and the bidder
shall not be permitted to withdraw his bid on this account.
to be free supplied from the by client.
(5) In Schedule-B& Schedule-C the Bidder shall quote prices for the items on
percentage rate as called for against the item.
work. Prices quoted in Schedule-B& Schedule-C only will be considered for
price evaluation & shall form a part of the Contract Agreement.
(7) The Bidder shall quote his prices for Operation & Maintenance for five
years in Schedule-B Bidder.
(8) Each item is to be individually priced online and the amounts shall be
Schedules of prices shall be left blank except where the item description
requires the item to be priced on "as applicable” basis. The item shall not
be priced if it is “not applicable” to the bidder’s design, in which case the
bidder shall add the words “NOT APPLICABLE”. The wording in the item
description is for subject matter guidance only; clause reference are
indicative only and all other relevant clauses shall also be referred to. The
prices shall allow for all the works covered under the bid and all liabilities
and contractual obligations whether separately specified or not.
Volume-III, PRICE BID NC-22
(9) The bidder shall be deemed to have allowed in his price for provision,
maintenance and final removal of all temporary works of whatsoever nature
required for maintenance including temporary bunds, diverting water,
pumping, de-watering etc. for the proper execution of works. The rates
shall also be deemed to include any works and setting out that may be
required to be carried out for laying out of all the works involved.
(10) Prices shall be filled online only.
Contract, the Specifications and other sections of these bid documents and
these documents are to be taken as mutually explanatory of one another.
(12) The bidder shall interpret the data furnished and carry out any additional
survey work, or investigation work required at his own cost.
(13) The bidder should acquaint himself with the site conditions including the
access to Work site. The successful bidder shall have to make suitable
access to work sites at his own cost. These accesses will be used by the
other contractors working for GWIL.
and the prices shall include all the equipment’s / materials / accessories
and services required as per the specifications. The bidder shall fill in the
(15) The amount to be quoted for O & M / year shall be as per Volume-IB,
General Conditions of Contract, Clause No.
(16) 1% of the value of work will be deducted from the Running bill against labor
cess which is nonrefundable.
(17) Any expenditure incurred by inspection/ CSC agency for the work
misinformed by the contractor and charges of inspection/ CSC agency
without any work due to misinformation shall be recovered from the
(18) The prices shall be quoted inclusive of all taxes, royalties and duties
prevailing at the time of submission of the bids. Statutory variation if any
during the currency of contract shall have to borne by the agency which
shall be not reimbursed by the GWIL.
(19) The rates quoted shall be exclusive of GST, but inclusive of all other taxes,
duties which shall not be paid extra. While GST will be paid for admissible
part of actual work done at the approved tender rates and tender conditions
of price variations. GST shall be paid as per prevailing rates at the time of
payment. The TDS shall be deducted at source as per provision of IT rules
Volume-III, PRICE BID NC-22
and GWIL policy.
(20) The rates should be quoted exclusive of GST but inclusive of all other taxes
as per Volume-I (B), General Conditions Contract, Clause No.
(21) The Bidders shall have to quote the rates in this tender keeping in view of
the GST. The Complete responsibility of taxes, duties, levies rests with the
Contractor/Agency only.
(22) The process requires that the bidder shall quote his price for the work
prices shall remain firm and fix during the entire period of performance of
(23) Agency shall have to take Insurance policy and intimate to GWIL along with
the evidence within time limit. In case of noncompliance entire
responsibility shall be rest with the agency and required amount shall be
recovered from any due amount of the agency.
(24) GWIL can recover penalty amount from the agency for not taking the
insurance. Though the penalty amount is recovered, responsibility of the
agency for taking insurance shall be continued and will not be escaped from
the responsibility.
(25) The contractor shall apply fair means of stock maintenance and shall adopt
accounting standard as may be prescribed under GST Act as applicable in
the state of Gujarat. For arriving at the difference in procurement prices
due to introduction of GST it will be open for the Board to ask for original
invoices, lorry receipt, weigh bridge slips, payment details and such other
documents as may be required for the purpose.
(26) The rates to be quoted by the contractor must be exclusive of GST but
inclusive of all other taxes. GST should be paid extra on the admissible
payment as per the approved tender rates and condition of price variation;
GST should be paid as per prevailing rates at the time of payment.
Signature of contractor Senior Manager
Volume-III, PRICE BID NC-22
Bidders are required to fill up all the blank spaces in this Bid Form.
Chief General Manager
1st floor Jivaraj Mehata Bhavan
SUB : Comprehensive Operation & Maintenance of Civil & Electromechanical assets
such as sump, all civil structures, pump house, bulk transmission pipeline, valves,
pumping machinery electrical equipment etc. for the NC-22 Project, including proper
supply of water as per demand for 60 months period including various civil work for
NC-22 scheme strengthening. Dist: Kachchh
Having visited the site and examined the Bid Documents, Drawings, Conditions of
Schedules etc. including Addenda/Amendments to the above, for the execution of the
above Contract, we the undersigned offer to design, Engineer, procure, construct,
complete, commission, operate and maintain the whole of the said works for 5 years
from the date of commissioning including defects liability period as given in Conditions
of Contract and in conformity with the drawings, conditions of Contract,
Addenda Nos._ (insert numbers) for Lump sum fixed price of Rs. .Rupees )
for Construction including free trial run for three months or such other sum as may be
ascertained in accordance with the conditions.
1. I/We agree that,
a) if we fail to provide required facilities to the Employer’s representative or any other
person/Agency by the Employer to perform on his behalf for carrying out the inspection
and testing of materials and workmanship.
b) if we incorporate into the Works, materials before they are tested and approved by the
Engineer’s representative.
c) if we fail to deliver water of required quantity according to the conditions/stipulations
of the Contract, the Engineer will be at liberty to take any action including termination
of Contract and impose at his absolute discretion any penalties, and/or reject the
Volume-III, PRICE BID NC-22
2. We undertake, if our Bid is accepted, to complete and deliver the works in accordance
with the Contract within months, inclusive of monsoons, from
the date or receipt of Letter of Acceptance issued to us by you.
3. We agree to abide by this Bid for a period of 180+28 days from the Last date of
submission of the bill and it shall remain binding upon us and may be accepted at any
time before the expiry of that period.
4. In the event of our Bid being accepted, we agree to enter into a formal Contract
Agreement with you incorporating the conditions of Contract there to annex but until
such agreement is prepared this Bid together with your written acceptance thereof shall
constitute a binding Contract between us.
5. We agree, if our Bid is accepted, to furnish performance /Security in the forms and of
value specified in the Clause 1 of Volume-IB, “General Conditions of Contract”.
6. We have independently considered the amounts of liquidated damages shown in
Appendix to Bid and agree that they represent a fair estimate of the damages likely to be
suffered by you in the event of the work not being completed by us intime.
7. We understand that you are not bound to accept the lowest or any Bid you may receive.
Dated this day of __________________
_(Name of the Person)
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature _
Volume-III, PRICE BID NC-22
NAME OF SCHEME –O&M of Project NC-11(Anjar to Kukma to Sukhpar & Anjar to Mandvi)
This is a bid documents for Comprehensive Operation & Maintenance of Civil & Electromechanical assets such as
sump, all civil structures, pump house, bulk transmission pipeline, valves, pumping machinery electrical equipment
etc. for the NC-22 Project, including proper supply of water as per demand for 60 months period including various
civil work for NC-22 scheme strengthening. Dist: Kachchh
Schedule showing the approximately the materials to be supplied to the contractor from government stores for the work to
be executed and the rate at which they are to be charged.
Rate at which the
Sr. material will be charged
Particular Qty. Place of Delivery
No. to the contractor
1 C. I. Temper proof Air valves With 145 - - Departmental Store of Anjar
Isolating Sluice Valve PN
All the Spares of Mechanical, Electrical equipment’s, Tools & Tackles as available with the department will be handed
over to the agency. The agency has to return all the spares, tools & tackles in good working condition to the
department on termination/completion of the contract.
1. The contractor submitting the Tender shall see that the rate in Schedule-A are filled in by the Engineer in Charge
at the time of issue tender.
2. The contractor while submitting the tender shall provide his own arrangement at his own cost for loading,
unloading, and transporting safety to the site of work the material stipulated in Schedule-A
Volume-III, PRICE BID NC-22
3. All the surplus materials supplied by the dept. As mentioned in schedule-A should be handed over to the
Department by the contractor at the Govt. stores as directed.
4. The materials mentioned in schedule-A shall have to be checked for their correctness and soundness by the
contractor before taking the delivery of the materials from the Government
5. The persons of firm submitting the Tender should see that rates in the above schedule are filled up by the
Executive Engineer, on the issue of form prior to the submission of the Tender.
6. Carting of above materials should be done by contractor at his own cost.
7. Contractor should return the balance materials in good and acceptable condition, otherwise recovery at the
double rates will be affected in view of Clause12.4.
Signature of contractor
Volume-III, PRICE BID NC-22
NAME OF SCHEME : NC-22 PROJECT
Name of Work: Comprehensive Operation & Maintenance of Civil & Electromechanical assets such as sump, all civil structures,
pump house, bulk transmission pipeline, valves, pumping machinery electrical equipment etc. for the NC-22 Project, including
proper supply of water as per demand for 60 months period including various civil work for NC-22 scheme strengthening. Dist:
Description Qty Unit Rate Amount (Rs)
Comprehensive Operation, Maintenance & Repair of Metallic Pipeline
(MS Pipeline) From Sukhpar to Kakadbhit to Khirasara & Kakadbhit to
1 Mangwana to Mandvi including all the components NC-22 Pipeline proper 1 Per Year 6,52,198.00
supply of water as per demand operation & maintenance records, as per
extent of work and as per directed by Engineer In Charge.
2 Establishment
2a Maintenance Engineer (Civil/Mechanical) 1 Per Year 3,16,801.75
2b Welder (Skilled) 1 Per Year 2,30,767.60
2c Lineman (unskilled) 8 Per Year 2,21,222.85
3 Utility Vehicle 1 Nos 3,12,480.00
Total amount for Civil O & M cost First year, Rs.
Total amount for Civil O & M cost First year, Rs.
Electro-Mechanical Work
1 Operation, Maintenance & Repair of All Electro mechanical & Inst. items
for Kakadbhit P.S. including all electro-Mechanical Items i.e. Pump
Motor Sets, Valves, Crane, Transformer, Panels, Cables etc. (250 X 2 KW 1 Per Year 3,25,000.00
(01 Working + 01 Standby) Total : 500 KW) as per extent of work and as
per directed by Engineer In Charge.
Volume-III, PRICE BID NC-22
2 Establishment
2a Operator (Skilled) 1 Per Year 2,30,767.60
2b Security Guard (unskilled) 2 Per Year 2,21,222.85
Civil structure maintenance of all Types like Pump house, sump, HR,
3 Intake channel, RCC road, site office, Chambers, Encasing, Thrust block, 1 Per Year 26,389.00
4 Insurance of Electro-mechanical & Instrumentation equipments. 1 Job 6,500.00
5 Insurance Manpower engaged in O & M work (Civil + Mechanical) 1 Job 29,906.00
6 Sump cleaning (Every year) 1 Job 13,429.00
Total amount for E-M O & M cost First year, Rs.
Total amount for E-M O & M cost First year, Rs.
Total amount of O, M & R for 1st Year Rs.
Total amount of O, M & R for 1st Year Rs.
Signature of Contractor Senior Manager
Volume-III, PRICE BID NC-22
NAME OF SCHEME : NC-22 PROJECT
Name of Work: Comprehensive Operation & Maintenance of Civil & Electromechanical assets such as sump, all civil
structures, pump house, bulk transmission pipeline, valves, pumping machinery electrical equipment etc. for the NC-22
Project, including proper supply of water as per demand for 60 months period including various civil work for NC-22 scheme
strengthening. Dist: Kachchh
Description Qty Unit Rate Amount (Rs)
Comprehensive Operation, Maintenance & Repair of Metallic Pipeline (MS
Pipeline) From Sukhpar to Kakadbhit to Khirasara & Kakadbhit to
1 Mangwana to Mandvi including all the components NC-22 Pipeline proper 1 Per Year 6,91,330.00
supply of water as per demand operation & maintenance records, as per
extent of work and as per directed by Engineer In Charge.
2 Establishment
2a Maintenance Engineer (Civil/Mechanical) 1 Per Year 3,35,810.00
2b Welder (Skilled) 1 Per Year 2,44,614.00
2c Lineman (unskilled) 8 Per Year 2,34,496.00
3 Utility Vehicle 1 Nos 3,31,229.00
4 Colour work of Air Valve & Structures 1 Job 9,60,800.00
Total amount for Civil O & M cost Second year, Rs.
Total amount for Civil O & M cost Second year, Rs.
Electro-Mechanical Work
1 Operation, Maintenance & Repair of All Electro mechanical & Inst. items
for Kakadbhit P.S. including all electro-Mechanical Items i.e. Pump
Motor Sets, Valves, Crane, PLC, Transformer, Panels, Cables etc. (250 X 2 1 Per Year 3,44,500.00
KW (01 Working + 01 Standby) Total : 500 KW) as per extent of work and
as per directed by Engineer In Charge.
2 Establishment
Volume-III, PRICE BID NC-22
2a Operator (Skilled) 1 Per Year 2,44,614.00
2b Security Guard cum sweeper (unskilled) 2 Per Year 2,34,496.00
3 Civil structure maintanance of all Types like Pump house, sump, HR,
Intake channel, RCC road, site office, Chambers, Encasing, Thrust block, 1 Per Year 27,972.00
4 INSURANCE of Electro-mechanical & Instrumentation equipments. 1 Job 6,890.00
5 INSURANCE OF MAN POWER(CIVIL+MECHANICAL) Insurance Manpower
engaged in O & M work
6 Sump cleaning (Every year) 1 Job 14,235.00
7 Colour work of Structure 1 Job 97,980.00
Total amount for E-M O & M cost Second year, Rs.
Total amount for E-M O & M cost Second year, Rs.
Total amount of O, M & R for 2nd Year Rs.
Total amount of O, M & R for 2nd Year Rs.
Signature of Contractor Senior Manager
Volume-III, PRICE BID NC-22
NAME OF SCHEME : NC-22 PROJECT
Name of Work : Comprehensive Operation & Maintenance of Civil & Electromechanical assets such as sump, all civil structures,
pump house, bulk transmission pipeline, valves, pumping machinery electrical equipment etc. for the NC-22 Project, including
proper supply of water as per demand for 60 months period including various civil work for NC-22 scheme strengthening. Dist:
Description Qty Unit Rate Amount (Rs)
Comprehensive Operation, Maintenance & Repair of Metallic Pipeline (MS
Pipeline) From Sukhpar to Kakadbhit to Khirasara & Kakadbhit to
1 Mangwana to Mandvi including all the components NC-22 Pipeline proper 1 Per Year 7,32,810.00
supply of water as per demand operation & maintenance records, as per
extent of work and as per directed by Engineer In Charge.
2 Establishment Per Year
2a Maintenance Engineer (Civil/Mechanical) 1 Per Year 3,55,959.00
2b Welder (Skilled) 1 Per Year 2,59,291.00
2c Lineman (unskilled) 8 Per Year 2,48,566.00
3 Utility Vehicle 1 Nos 3,51,103.00
Total amount for Civil O & M cost Third year, Rs.
Total amount for Civil O & M cost Third year, Rs.
Electro-Mechanical Work
Operation, Maintenance & Repair of All Electro mechanical & Inst. items
for Kakadbhit P.S. including all electro-Mechanical Items i.e.Pump Motor
1 Sets, Valves, Crane, PLC, Transformer, Panels, Cables etc. (250 X 2 KW 1 Per Year 3,65,170.00
(01 Working + 01 Standby) Total : 500 KW) as per extent of work and as
per directed by Engineer In Charge.
2 Establishment
2a Operator (Skilled) 1 Per Year 2,59,291.00
Volume-III, PRICE BID NC-22
2e Security Guard cum sweeper (unskilled) 2 Per Year 2,48,566.00
Civil structure maintenance of all Types like Pump house, sump, HR,
3 Intake channel, RCC road, site office, Chambers, Encasing, Thrust block, 1 Per Year 29,650.00
4 INSURANCE of Electro-mechanical & Instrumentation equipments. 1 Job 7,303.00
INSURANCE OF MAN POWER(CIVIL+MECHANICAL) Insurance Manpower
engaged in O & M work
6 Sump cleaning (Every year) 1 Job 15,089.00
Total amount for E-M O & M cost Third year, Rs.
Total amount for E-M O & M cost Third year, Rs.
Total amount of O, M & R for Civil for 3rd Year Rs.
Total amount of O, M & R for Civil for 3rd Year Rs.
Signature of Contractor Senior Manager
Volume-III, PRICE BID NC-22
NAME OF SCHEME : NC-22 PROJECT
Name of Work : Comprehensive Operation & Maintenance of Civil & Electromechanical assets such as sump, all civil structures,
pump house, bulk transmission pipeline, valves, pumping machinery electrical equipment etc. for the NC-22 Project, including
proper supply of water as per demand for 60 months period including various civil work for NC-22 scheme strengthening. Dist:
Description Qty Unit Rate Amount (Rs)
Comprehensive Operation, Maintenance & Repair of Metallic Pipeline (MS
Pipeline) From Sukhpar to Kakadbhit to Khirasara & Kakadbhit to Mangwana
1 to Mandvi including all the components NC-22 Pipeline proper supply of 1 Per Year 7,76,779.00
water as per demand operation & maintenance records, as per extent of
work and as per directed by Engineer In Charge.
2 Establishment Per Year
2a Maintenance Engineer (Civil/Mechanical) 1 Per Year 3,77,317.00
2c Welder (Skilled) 1 Per Year 2,74,848.00
2d Lineman (unskilled) 8 Per Year 2,63,480.00
3 Utility Vehicle 1 Nos 3,72,169.00
4 Colour work of Air Valve & Structures 1 Job 9,60,800.00
Total amount for Civil O & M cost Fourth year, Rs.
Total amount for Civil O & M cost Fourth year, Rs.
Electro-Mechanical Work
Operation, Maintenance & Repair of All Electro mechanical & Inst. items for
Kakadbhit P.S. including all electro-Mechanical Items i.e. Pump Motor Sets,
1 Valves, Crane, PLC, Transformer, Panels, Cables etc. (250 X 2 KW (01 1 Per Year 3,87,080.00
Working + 01 Standby) Total : 500 KW) as per extent of work and as per
directed by Engineer In Charge.
2 Establishment
2a Operator (Skilled) 1 Per Year 2,74,848.00
2b Security Guard cum sweeper (unskilled) 2 Per Year 2,63,480.00
Volume-III, PRICE BID NC-22
Civil structure maintenance of all Types like Pump house, sump, HR, Intake
3 1 Per Year 31,429.00
channel, RCC road, site office, Chambers, Encasing, Thrust block, etc.
4 INSURANCE of Electro-mechanical & Instrumentation equipments. 1 Job 7,741.00
INSURANCE OF MAN POWER(CIVIL+MECHANICAL) Insurance Manpower
engaged in O & M work
6 Sump cleaning (Every year) 1 Job 15,994.00
7 Colour work of Structure 1 Job 97,980.00
Total amount for EM O & M cost Fourth year, Rs.
Total amount for EM O & M cost Fourth year, Rs.
Total amount of O, M & R for 4th Year Rs.
Total amount of O, M & R for 4th Year Rs.
Signature of Contractor GWIL, Anjar
Volume-III, PRICE BID NC-22
NAME OF SCHEME : NC-22 PROJECT
Name of Work : Comprehensive Operation & Maintenance of Civil & Electromechanical assets such as sump, all civil structures,
pump house, bulk transmission pipeline, valves, pumping machinery electrical equipment etc. for the NC-22 Project, including
proper supply of water as per demand for 60 months period including various civil work for NC-22 scheme strengthening. Dist:
Description Qty Unit Rate Amount (Rs)
Comprehensive Operation, Maintenance & Repair of Metallic Pipeline (MS
Pipeline) From Sukhpar to Kakadbhit to Khirasara & Kakadbhit to Mangwana
1 to Mandvi including all the components NC-22 Pipeline proper supply of 1 Per Year 8,23,386.00
water as per demand operation & maintenance records, as per extent of
work and as per directed by Engineer In Charge..
2 Establishment Per Year -
2a Maintenance Engineer (Civil/Mechanical) 1 Per Year 3,99,956.00
2b Welder (Skilled) 1 Per Year 2,91,339.00
2c Lineman (unskilled) 8 Per Year 2,79,289.00
3 Utility Vehicle 1 Nos 3,94,499.00
Total amount for Civil O & M cost Fifth year, Rs.
Total amount for Civil O & M cost Fifth year, Rs.
Electro-Mechanical Work
Operation, Maintenance & Repair of All Electro mechanical & Inst. items for
Kakadbhit P.S. including all electro-Mechanical Items i.e. Pump Motor Sets,
1 Valves, Crane, PLC, Transformer, Panels, Cables etc. (250 X 2 KW (01 1 Per Year 4,10,305.00
Working + 01 Standby) Total : 500 KW) as per extent of work and as per
directed by Engineer In Charge.
2 Establishment
2a Operator (Skilled) 1 Per Year 2,91,339.00
2e Security Guard cum sweeper (unskilled) 2 Per Year 2,79,289.00
Volume-III, PRICE BID NC-22
Civil structure maintenance of all Types like Pump house, sump, HR, Intake
3 1 Per Year 33,315.00
channel, RCC road, site office, Chambers, Encasing, Thrust block, etc.
4 INSURANCE of Electro-mechanical & Instrumentation equipments. 1 Job 8,205.00
INSURANCE OF MAN POWER(CIVIL+MECHANICAL) Insurance Manpower
engaged in O & M work
6 Sump cleaning (Every year) 1 Job 15,994.00
Total amount for EM O & M cost Fifth year, Rs.
Total amount for EM O & M cost Fifth year, Rs.
Total amount of O, M & R for 5th Year Rs.
Total amount of O, M & R for 5th Year Rs.
Signature of Contractor Senior Manager
Volume-III, PRICE BID NC-22
Name of Work: Providing, Supplying and erection of new Temper Proof Air Valve & Air-Riser in NC-22
Kukma-Sukhpar-Kakadbhit-Khirasra & Kakadbhit-Mangwana-Mandvi Pipeline
Item Total Amount
Item Total Amount
Item Description Qty Unit Rates
Replacement of air valve riser by Dismantling the existing air valve by
excavation, dismantling conc. and cutting/shifting of riser from top of pipe and
1 install new M.S pipe of 6mm thick and 3.2mt length with necessary fittings such
as flange of appropriate size, nut bolts and embedded the pipe in RCC M:20 with
offset of 10 cm around pipe with necessary steel etc complete
Dia of Air Valve 100mm 46.00 Nos. 558.00
Dia of Air Valve 150mm 40.00 Nos. 573.00
Dia of Air Valve 200mm 145.00 Nos. 599.00
Providing and supplying C. I. Temper proof Air valves with SS 304 Float gun
metal- nozzle of approved make & quality of following class and diameter
2 including all taxes, insurance, transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to departmental stores, stacking etc.
complete. With Isolating Sluice Valve PN
Erection of air valve riser by installing new M.S. pipe 3.2mt length with necessary
3 fittings such as flange of appropriate size, nut bolts and embedded the pipe in
RCC M:20 with offset of 10 cm around pipe with necessary steel etc complete
Dia of Air Valve 100mm & MS Pipe 46.00 Nos. 7909.00
Dia of Air Valve 150mm & MS Pipe 40.00 Nos. 12054.00
Dia of Air Valve 200mm & MS Pipe 145.00 Nos. 19009.00
Signature of Contractor Senior Manager
Volume-III, PRICE BID NC-22
Name of Work: Repairing of Sukhpar & Mangwana H/w premises of GWIL Campus
Item Total Amount
Item Total Amount
Item Description Qty Unit Rate
Dismantling doors, windows, ventilators etc. (wood or
steel) shutters including chowkhats architraves,
1 holdfasts and other attachment etc. complete and 48.00 Each 181.13
stacking them within all lead and lift.(i) Not exceeding
3 Sq.M. in area.
Providing and fixing standard extruded of alluminium
section of size 63mm x 38.10mm x 1.2mm (Jindal
Section :2434, @ Wt. 0.643 Kg/mt) with colour Powder
Coated alluminium frame for ventilation with 5 mm
thick frosted glass as details etc complete for
Providing and fixing alluminium fully paneled door
with Frame having extruded alluminium color anodized
section frame main Frame size 101.60 mm x 44.45 mm
x 3.18mm ( of Section No.20011 @ wt. of 2.54 kg/mt
)unit providing shutters of bottom & Top rail-
mm x 25.40 mm x 3.18mm (of Section No.19511 @ wt.
of 2.65 kg/mt ) Shutter Middle rail = 150 mm x 44.45 x
2.65 mm (of Jindal Section No.20002 @ wt. of
kg/mt) Vertical member Shutter style = 85.00 mm x
mm x 3.00(of Jindal Section No.19509 @ wt. of
kg/mt).with 12mmth. both side pre laminated particle
board (novapan) conforming to IS: 12823 Grade 1 Type
II in panelling fixed in aluminium door consisting of
outer frame shutter as per design with two pairs of
standard handles, two pair of concealed shoot bolts
250mm long and pin type narrow style lock and thumb
turn from the other side, including all fixtures,
fastening etc. complete as directed and as per
drawing and design. Rate including hinges/Pivots and
making provision for fixing of fitting wherver required
Volume-III, PRICE BID NC-22
including the cost of EPDM rubber/neoprene gasket
required Anodised aluminium (work for all floors)
Providing and fixing window having extruded aluminum
Colour anodized section frame main outer size 127mm
x 38.10mm x 1.35mm @wt. 1.384kg/m, horizontal Four
track member size 122.20mm x 31.75mm x 1.10mm@
wt 1.205 kg/m, vertical member of size 122.20mm x
31.75mm x 1.50mm @1.398 kg/mt with sliding shutters
4 of horizontal member size 40mm x 18mm x 1.29mm 36.20 SMT 2119.14
0.456kg/mt ,vertical member of size 40mm x 18mm x
1.29mm @ 0.456 kg/mt with 5 mm thick transparent
bronze colour tinted float glass with powder coated
aluminum fittings and fixtures and transparent silicon
sealant glass fixing to frame as per details etc
complete for window.
Providing and fixing rolling shutters of approved make
made of 80 mm wide M.S. laths inter-locked together
through their entire length and joined together at the
ends by end locks mounted on specially designed pipe
5 shaft with bracket plates, guide channels and 42.00 SMT 4450.51
arrangements for inside and outside locking with push-
pull operation including the cost of hood cover and
spring etc... complete (B) Shutters having width 3.5 M
Providing 20 mm thick cement plaster by using Ready
Mix Mortar for plaster in single coat on single or half
6 brick walls for interior plastering upto floor two level 1582.00 SMT 231.66
and finished even and smooth in Cement mortar 1:4 (1
Cement : 4 sand)
Finishing wall with weather proof exterior emulsion
paint on wall surface (two coats) to give an required
7 shape even shade after thoroughly brushing the 1582.00 SMT 113.40
surface to remove all dirt, and remains of loose
powdered materials.etc complete
Brick work using common burnt clay building bricks
having crushing strength not less than 35 kg./Sq.Cm.
in foundation and plinth in Cement Mortar 1:5. (1-
Cement : 5 -fine sand)(A) Modular
Volume-III, PRICE BID NC-22
Providing and laying ordinary cement concrete 1:2:4
(1-cement : 2-Coarse sand 4: graded stone aggregate
9 20 mm nominal size ) for RCC Lintel including finishing 15.18 CMT 9636.00
smooth with curing etc complete including cost of
formwork but excluding the cost of reinforcement.
Providing and fixing 1.20 Metre high fencing with
Metre long M.S. Angle posts 40mm x 40 mm x6 mm and
oil painting 3 coats fixed at 2.5 Mt,C/c. with five
Horizontan lines and two diagonals of galvanised steel
barbed wire weighting 9.38 Kg. per 100 Metre,
strained and fixed to posts with G.I,staples including
fixing the posts in ground with 0.5 M x 0.5.M x 0.5 M.
block in C.C1:5:10 etc complete.
Providing erecting and fixing double coated ISI water
tank of required capacity each with all necessary
and connection etc. complete on terrace
Signature of Contractor Senior Manager
Volume-III, PRICE BID NC-22
Sr. No. Schedule-B
In Rs. Per Year
1 Schedule B-1 (First Year)
2 Schedule B-2 (Second Year)
3 Schedule B-3 (Third Year)
4 Schedule B-4 (Fourth Year)
5 Schedule B-5 (Fifth Year)
Note: The rates to be quoted by the contractor must be exclusive of GST but
inclusive of all other taxes. GST should be paid extra on the admissible
payment as per the approved tender rates; GST should be paid as per
prevailing rates at the time of payment.
I / we am / are willing to carry out the work at …………….% above / below –
percentage (should be written in figure and words) above / below the estimated
rate mention above.
Estimated cost put to tender Rs. Estimated cost put to tender Rs.
Rs. Add % Rs. Deduct %
Above Rs Below Rs.
Total Rs. Total Rs.
In words Rs. In words Rs.
Signature of Contractor Senior Manager
Volume-III, PRICE BID NC-22
1. The rates to be quoted by the contractor must be exclusive of GST but inclusive
of all other taxes. GST should be paid extra on the admissible payment as per
the approved tender rates; GST should be paid as per prevailing rates at the time
2. Schedule B-1 to B-5 is payable on monthly basis.
3. Schedule C-1 to C-2 shall be payable Item wise as per actual quantity executed in RA
4. The bidders should strictly note that rate will be fixed and firm. No escalation
will be given during the maintenance period.
5. The work should be carried out as per the terms and conditions laid down in the
tender specification.
6. The cost of raw water, electricity will be borne by GWIL. All other required
material for O&M work shall be brought by the contractor at his own cost
including loading, unloading and carting and the same material shall get approval
from the Engineer-in-charge before use in the work.
7. The cost is including all type of taxes (other than GST), octroi, freight, loading,
unloading, carting labor charges payment to labor including insurance, P.F. and
all other liabilities for the staff engaged for the O&M work.
8. Salary of staff shall have to be done through Bank and P.F. shall have to be
deducted from the salary of employees as per prevailing rules and regulations.
9. All replaced material (provided from the department’s store) shall be returned
to department store by the contractor at his own cost.
10. All works specified in schedule-C shall be completed within 1 year from the date
of Work Order, failing to which the same shall be carried out by department and
recovery shall be made from Running Bill at double of the quoted rate.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. VOL 1A Tech Bid NC-22.pdf
2. VOL -1B _GCC_NC-22.pdf
3. VOL 1B PART-2 NC-22.pdf
4. VOL 1B PART-3 NC-22.pdf
5. VOL 1B PART-4 EMD GR.pdf
6. VOL 1B PART-5 GST circular.pdf
7. VOL II A Extent of work.pdf
8. VOL IIB Civil Tech. Spec.pdf
9. VOL II C Technical Specification Electromechanical works NC-22.pdf
10. Volume III Price Bid -NC-22.pdf
11. ONM Colour work related.pdf
12. VOL IV General Condition of ONM Contract NC-22.pdf
13. Indicative Map.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .