Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-Finance | ₹1.0 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.0 Cr+₹4,319.74 (0.04%)Rejected-Finance | ₹1.0 Cr+₹4,319.74 (0.04%) | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Offline Documents not submitted |
| Sl No | Description | Qty | Unit | PREM SINGH L2 | sanjeev thaledi L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation of soil, stone, boulders | 580.7 | M3 | 402 ₹2,33,441.4 | 400 ₹2,32,280 Lowest |
| 2.00 | Random Rubble Stone Masonry in 1:6 | 186.52 | M3 | 4,801 ₹8,95,482.52 | 4,800 ₹8,95,296 Lowest |
| 3.00 | RCC M-20 | 514.83 | M3 | 8,081 ₹41,60,341.23 | 8,080 ₹41,59,826.4 Lowest |
| 4.00 | Supplying, Fitting and placing HYSD/TMT reinforcement in foundation | 48.5 | Ton | 65,875 ₹31,94,937.5 | 65,874 ₹31,94,889 Lowest |
| 5.00 | Hand Packed stone filling | 32.5 | M3 | 1,040 ₹33,800 | 1,038 ₹33,735 Lowest |
| 6.00 | Dewatering from foundation & abutments and wing wall (with pump capacity 4000 ltr per Hr.) | 240 | Hrs | 248 ₹59,520 | 246 ₹59,040 Lowest |
| 7.00 | Plastering with cement mortar (1:4) 15 mm thik | 194 | M2 | 223 ₹43,262 | 222 ₹43,068 Lowest |
| 8.00 | Sighnboard & Photography | 1 | Nos | 1,999 ₹1,999 | 1,995 ₹1,995 Lowest |
| 9.00 | Excavation of soil, stone, boulders for trenches Dug pounds RR dry wall | 510.63 | Cub | 400 ₹2,04,252 | 399 ₹2,03,741.37 Lowest |
| 10.00 | RR Dry for wall, Dug pound | 239.68 | Cub | 3,006 ₹7,20,478.08 | 3,004 ₹7,19,998.72 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.5 L
Closing Date
22 May 2026, 11:00 amClosed
E.E. MI Pauri
Near Shivalik Hotel Pauri, Pauri Garhwal
On Stream Treatment Plan of Hyunil River Part-01
2026_MI_95152_1
85/EE-MI/Pauri
Open Tender
Civil Works - Others
Item Wise
Yamkeshwar
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,720
EE MI Pauri
₹2.5 L
26 Jul 2026
8 May 2026
22 May 2026
8 May 2026
22 May 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of soil, stone, boulders | 580.7 | M3 | 400.8 | ₹2,32,744.56 |
| 2 | Random Rubble Stone Masonry in 1:6 | - | M3 | 4,807.6 | - |
| 3 | RCC M-20 | - | M3 | 8,081.8 | - |
| 4 | Supplying, Fitting and placing HYSD/TMT reinforcement in foundation | - | Ton | 65,875.3 | - |
| 5 | Hand Packed stone filling | - | M3 | 1,039 | - |
| 6 | Dewatering from foundation & abutments and wing wall (with pump capacity 4000 ltr per Hr.) | - | Hrs | 247.1 | - |
| 7 | Plastering with cement mortar (1:4) 15 mm thik | - | M2 | 223.5 | - |
| 8 | Sighnboard & Photography | - | Nos | 2,000 | - |
| 9 | Excavation of soil, stone, boulders for trenches Dug pounds RR dry wall | 1 | Cub | 400.8 | ₹400.4 |
| 10 | RR Dry for wall, Dug pound | - | Cub | 3,007.9 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_112518.xls
BOQ • 0.28 MB
Date.pdf
PDF • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .