Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Fee/PreQual/Technical/Finance | ₹2.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.4 L+₹1,254.36 (0.53%)Admitted-Fee/PreQual/Technical/Finance | ₹2.4 L+₹1,254.36 (0.53%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.7 L+₹33,168.51 (14.0%)Admitted-Fee/PreQual/Technical/Finance | ₹2.7 L+₹33,168.51 (14.0%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹2.8 L+₹43,980.19 (18.6%)Admitted-Fee/PreQual/Technical/Finance | ₹2.8 L+₹43,980.19 (18.6%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | K P JACOB L3 | LUCKMAN L4 | NOUSHAD T S L2 | P V BABYCHAN L1 |
|---|---|---|---|---|---|---|---|
| 1.00APPENDIX A | |||||||
| 1.00 | OD9119/2026-2027:structural steel work for maintaining existing damaged shutters of size 1.5*0.5 replacing damaged sheet of 16 gauge GI sheet Fixing in position, welding, grinding etc complete and applying a priming coat of approved steel primer etc complete. ( 1.5*0.5=0.75m2*12.648 kg/m2=9.486 kg add 5% wastage =9.9603kg) | 2 | each | 4,111.59 ₹8,223.18 | 4,276 ₹8,552 | 3,626.01 ₹7,252.02 | 3,606.94 ₹7,213.88 Lowest |
| 1.00 | OD9115/2026-2027:structural steel work for maintaining existing damaged shutters of size 2*0.5 replacing damaged sheet of 16 gauge GI sheet Fixing in position, welding, grinding etc complete and applying a priming coat of approved steel primer etc complete. ( 2*0.5=1m2*12.648 kg/m2=12.648 kg add 5% wastage =13.2804kg) | 1 | each | 5,380.36 ₹5,380.36 | 5,596 ₹5,596 | 4,744.93 ₹4,744.93 | 4,719.98 ₹4,719.98 Lowest |
| 1.00 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 33.75 | sqm | 181.33 ₹6,119.89 | 189 ₹6,378.75 | 159.91 ₹5,396.96 | 159.07 ₹5,368.61 Lowest |
| 1.00 | OD9116/2026-2027: Filling and forming the bund using available excavated earth(excluding rock) including all incidental lead and lift etc complete as directed by the departmental officers at site. | 4.23 | cum | 633.63 ₹2,680.25 | 659 ₹2,787.57 | 558.8 ₹2,363.72 | 555.86 ₹2,351.29 Lowest |
| 1.00 | OD9118/2026-2027: Labor charges towards watching and maintaining the bund during season including operating of the shutters of the sluice as directed by the departmental officers at site. | 180 | each | 1,190.29 ₹2,14,252.2 | 1,238 ₹2,22,840 | 1,049.71 ₹1,88,947.8 | 1,044.2 ₹1,87,956 Lowest |
| 1.01 | OD9117/2026-2027: Dismantling the bund in between the shutters as per the directions of departmental officers at site. | 3.6 | cum | 185 ₹665.26 | 192 ₹690.43 | 163.15 ₹586.69 | 162.3 ₹583.63 Lowest |
| 1.01 | OD9120/2026-2027:Engaging labour for all kinds of work in emergencies as instructed by the departmental officers in charge. | 6 | Day | 1,190.29 ₹7,141.74 | 1,238 ₹7,428 | 1,049.71 ₹6,298.26 | 1,044.2 ₹6,265.2 Lowest |
| 1.01 | OD9114/2026-2027:Labour charges for handling including removing and placing, cleaning and conveying steel framed and GRP shutters to and from bund and stacking the same conveniently as directed by the departmental officers in charge. | 15 | each | 1,190.29 ₹17,854.35 | 1,238 ₹18,570 | 1,049.71 ₹15,745.65 | 1,044 ₹15,660 Lowest |
| 1.01 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 61.54 | kilogram | 128.35 ₹7,898.66 | 133 ₹8,184.82 | 113.19 ₹6,965.71 | 112.59 ₹6,928.79 Lowest |
Tender Value
₹2.5 L
EMD Value
₹6,142
Closing Date
19 Sept 2026, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer M I Subdivision Aluva
Annual maintenance of bund
2026_Irrig_870254_1
IRR/IA/TR/3789/2026_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
240 days
Alangad
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
Yes
₹6,142
Yes
22 Sept 2026
16 Sept 2026
22 Sept 2026
16 Sept 2026
19 Sept 2026
16 Sept 2026
16 Sept 2026 - 19 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1APPENDIX A | |||||
| 1.001 | OD9119/2026-2027:structural steel work for maintaining existing damaged shutters of size 1.5*0.5 replacing damaged sheet of 16 gauge GI sheet Fixing in position, welding, grinding etc complete and applying a priming coat of approved steel primer etc complete. ( 1.5*0.5=0.75m2*12.648 kg/m2=9.486 kg add 5% wastage =9.9603kg) | 2 | each | - | - |
| 1.002 | OD9115/2026-2027:structural steel work for maintaining existing damaged shutters of size 2*0.5 replacing damaged sheet of 16 gauge GI sheet Fixing in position, welding, grinding etc complete and applying a priming coat of approved steel primer etc complete. ( 2*0.5=1m2*12.648 kg/m2=12.648 kg add 5% wastage =13.2804kg) | 1 | each | - | - |
| 1.003 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 33.75 | sqm | - | - |
| 1.004 | OD9116/2026-2027: Filling and forming the bund using available excavated earth(excluding rock) including all incidental lead and lift etc complete as directed by the departmental officers at site. | 4.23 | cum | - | - |
| 1.005 | OD9118/2026-2027: Labor charges towards watching and maintaining the bund during season including operating of the shutters of the sluice as directed by the departmental officers at site. | 180 | each | - | - |
| 1.006 | OD9117/2026-2027: Dismantling the bund in between the shutters as per the directions of departmental officers at site. | 3.6 | cum | - | - |
| 1.007 | OD9120/2026-2027:Engaging labour for all kinds of work in emergencies as instructed by the departmental officers in charge. | 6 | Day | - | - |
| 1.008 | OD9114/2026-2027:Labour charges for handling including removing and placing, cleaning and conveying steel framed and GRP shutters to and from bund and stacking the same conveniently as directed by the departmental officers in charge. | 15 | each | - | - |
| 1.009 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 61.54 | kilogram | - | - |
stage.html
html • 0.02 MB
finance_1474516.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
PAY.pdf
Tender Documents • 0.04 MB
Preliminaryagmt.pdf
Tender Documents • 0.06 MB
viewsbd.pdf
Tender Documents • 2.26 MB
BOQ_1474516.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .