| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | -4.86% | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 CrAdmitted-Finance | -2.10% | ₹1.1 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.1 CrAdmitted-Finance | -1.90% | ₹1.1 Cr | L3 | Admitted-Finance |
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
20 Apr 2026, 5:00 pmClosed
GENERAL MANAGER CIVIL
SEC 6 NOIDA
M/o Road (Road Widening infront of Hoshiyarpur in MP-3 Road) Noida
2026_NOIDA_1133863_1
45/NOIDA/DyGM/SM-WC-03/2025-26
Open Tender
Civil Works - Others
120 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
NOIDA
₹2.3 L
14 May 2026
6 Apr 2026
21 Apr 2026
6 Apr 2026
20 Apr 2026
6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50metres lead. | - | Kg | - | - |
| 2 | Taking out existing CC interlocking Paver Blocks from footpath/central verge, including removal of rubbish etc. disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge | - | Sqm | - | - |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exccding 30 cm in depth, 1.5m in width or 10 sqm on plan) including disposal of excavated lead upto 50 mtr. & lift upto 1.5Mtr. dispose earth to be leveled & dressed. : All kinds of soil. The Contractor has to detect Different utilities like sewer line, water Supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge | - | Cum | - | - |
| 4 | Construction of granular sub base by providing close graded material, spreding in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 | - | Cum | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) DSR 18/I.No. 4.1.8/P- | - | Cum | - | - |
| 6 | Providing and laying C.C. pavement of mix M-25 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator , vacuum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of Engineer-in-charge. (The panel shuttering work shall be paid for separately).(Note:- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately). | - | Cum | - | - |
| 7 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately). All works upto plinth level | - | Cum | - | - |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level, Thermo Mechanically Treated bars of grade Fo_500D or more. Iten No.-5.22.6 | - | Kg | - | - |
| 9 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all loads including all lifts involved. | - | Cum | - | - |
| 10 | P/L applying tack coat using hot straight run bituman of grade 80/100 on bitumanious surface @0.50 kg/Sqm | - | Sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
BOQ_2116520.xls
BOQ • 0.25 MB
TD.pdf
Tender Documents • 2.29 MB
C.xls
Additional Documents • 0.05 MB
Download all tender documents and submit your bid