Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹25 L
Closing Date
17 Feb 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
City Engineer
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention & Exhibition Centre Based on PPP Model, Atal Smart City Rajkot (2nd Attempt)
262109
RMC/JNNURM/WZ/25-26/2
Open
Consultancy Services
Works
Rajkot
20 documents required · 18 mandatory · 2 optional
₹23,500
Rajkot Municipal Corporation
₹25 L
8 Jan 2026
8 Jan 2026
8 Jan 2026
17 Feb 2026
8 Jan 2026
Technical bid must be received by the Employer at the address specified
above not later than date 30/01/2026 up to 18:00 hrs. through registered
post/ speed post/Courier or by person only.
4.2.2 The Employer may, at its discretion, extend the deadline for submission of
bids by issuing an addendum in accordance with Clause 2.3, in which case all
rights and obligations of the Employer and the bidders previously subject to
the original deadline will thereafter be subject to the deadline as extended.
4.3.1 Any bid physically received by the Employer after the deadline for submission
of bids prescribed in Clause and sub-clause of 4.2 will be rejected and
considered as non-responsive and same will be returned unopened to the
4.4 Modification & Withdrawal of bids: Neither Modification nor
Withdrawal of Bid is permitted.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
5 OPENING & EVALUATION OF TECHNICAL PROPOSAL
5.1 Opening of technical proposal:
The Employer will open the technical proposals, in the presence of bidders'
representatives who choose to attend; on dt.02/02/2026, 11:00 Hrs. at the City
Engineer, Room No. 10, Harisinhji Gohil Bhawan, RMC West Zone Office, Behind
Big Bazar, 150 feet Ring road, Rajkot –
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
5.1.1 The bidders' representatives who are present shall sign a register evidencing
their attendance.
5.1.2 The bidder has to make power point Presentation on Approach, Methodology,
Design Philosophy & PPP Strategy specific to this project to the expert
committee on dt.04/02/2026, 11:00 hrs City Engineer, Room No.
Harisinhji Gohil Bhawan, RMC West Zone Office, Behind Big Bazar, 150 feet
Ring road, Rajkot –
5.1.3 The price proposals will remain unopened till the technical evaluation is
completed. The price bid only for technically qualified bidders will be opened
5.1.4 The bidders' names, bid modifications and withdrawals, such other details, as
the Employer may consider appropriate, will be announced and recorded by
the Employer at the opening. The bidders' representatives who choose to
remain present have to sign this record.
5.1.5 The Employer shall prepare minutes of the bid opening.
5.2.1 Information relating to the examination, clarification, evaluation and
comparison of bids and recommendations for the award of a contract shall not
be disclosed to bidders or any other persons not officially concerned with
such process. Any effort by a bidder to influence the Employer's processing of
bids or award decisions may result in the rejection of the bidder's bid.
5.3 Preliminary examination of technical proposal:
5.3.1 The Employer will examine the bids to determine whether they are complete,
whether the documents have been properly signed, whether-the required
security is included, and whether the bids are generally in order. Any bids
found to be non-responsive for any reason or not meeting the minimum levels
of the performance or other criteria specified in the bidding documents will
be rejected by the Employer and not included for further consideration.
5.4 Evaluation & comparison of technical proposal
5.4.1 The Employer will carry out a detailed evaluation of the bids in order to
determine whether the technical aspects are substantially responsive to the
requirements set forth in the bidding documents. In order to reach such a
determination, the employer will examine the information supplied by the
bidders and other requirements in the bidding documents on a pass or fail
Technical Bid Evaluation
The objective of the technical evaluation shall be to assess the technical
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
competence of the bidder. After completion of technical evaluation, marks
shall be awarded to the qualified bidders. Marking system shall be as
described in Cl.
5.4.2 Clarification of technical proposals and contacting the employer.
5.4.3 Any effort by the bidder to influence the employer in the Employer’s
evaluation of technical proposals, bid comparison or the Employer’s decisions
on acceptance or rejection of bids may result in the rejection of the bidder’s
5.5 Invitation to attend opening of price proposals:
5.5.1 At the end of the evaluation of the technical proposals and after receiving the
approval from competent authority, All bidders who have submitted
substantially responsive technical proposals to attend the bid opening of the
price proposals.
5.5.2 After receiving the approval of competent authority, Only qualified bidders
price proposal open.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
6 OPENING AND EVALUATION OF PRICE PROPOSALS
6.1 Opening of price proposals:
6.1.1 The Employer will open the price proposals of all technically qualified bidders
who submitted substantially responsive technical proposals and the time and
date at the location to be advised to the bidders. The bidder's representatives
who are present shall sign a register evidencing their attendance
6.1.2 The bidder's names, the Bid Prices including Supplementary Price Proposals,
the total amount of each bid, any discounts, the presence or absence of bid
the total amount of each bid, any discounts, the presence or absence of bid
security and such other details as the Employer may consider appropriate,
will be announced and recorded by the Employer at the opening. The bidder's
representatives will be required to sign this record.
6.2.1 Information relating to the examination, clarification, evaluation and
comparison of bids and recommendation for the award of a contract shall not
be disclosed to bidders or any other persons not officially concerned with
such process until the award to the successful bidder has been announced.
Any effort by a bidder to influence the Employer's, processing of bids or award
decisions may result in the rejection of the bidder's bid.
6.3 Clarification of price proposals and contacting the employer:
6.3.1 To assist in the examination, evaluation and comparison of price proposals,
the Employer may, at its discretion, ask any bidder for clarification of its bid.
The request for clarification and the response shall be in writing or by cable,
but no change in the price or substance of the bid shall be sought, offered or
permitted except as required to confirm the correction of arithmetic errors
discovered by the Employer in the evaluation of the bids in accordance with
6.3.2 Subject to Sub-clause 6.3.1, no bidder shall contact the employer on any
matter relating to its bid from the time of opening of price proposals to the
time the contract is awarded. If the bidder wishes to bring additional
information to the notice of the Employer, it should do so in writing.
6.3.3 Any effort by the bidder to influence the Employer in the Employer’s
evaluation of price proposals, bid comparison or contract award decisions
may result in the rejection of the bidder’s bid.
6.4 Preliminary examination of price proposals and determination of
responsiveness:
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
6.4.1 The Employer will examine the bids to determine whether they are complete,
whether the documents have been properly signed, whether the required
security is included, whether the bids are substantially responsive to the
requirements of the bidding documents; and whether the bids provide any
clarification and/or substantiation that the Employer may require pursuant to
6.4.2 A substantially responsive bid is one which conforms to all the terms,
conditions and requirements of the bidding documents, without material
deviation or reservation and includes the amendments and changes, if any,
requested by the Employer during the evaluation of the bidder's technical
6.4.3 If a price proposal is not substantially responsive, it will be rejected by the
Employer, and may not subsequently be made responsive by correction or
withdrawal of the nonconforming deviation or reservation.
6.5 Correction of errors:
6.5.1 Price Proposals determined to be substantially responsive will be checked by
the Employer for any arithmetic errors.
6.5.2 The amount stated in the Form of Bid for Price Proposal will be adjusted by
the Employer in accordance with the above procedure for the correction of
errors and, shall be considered as binding upon the bidder. If the bidder does
not accept the corrected amount of bid, its bid will be rejected, and the bid
security may be forfeited in accordance with Sub-Clause 3.6.6(b).
6.6 Conversion to single currency: not applicable:
6.7 Evaluation and comparison of proposal:
6.7.1 The Employer will evaluate and compare only the bids determined to be
substantially responsive in accordance with Clause 6.4.
6.7.2 Evaluation will be done on the total bid price inclusive of all taxes and duties.
6.7.3 The following evaluation methods will be followed:
The evaluation of the bids would be carried out as per Clause 1.4.9 Evaluation of
6.7.4 Performance Guarantee: A performance guarantee, often provided by a bank or
surety company, assures that a consultant will fulfil their contractual obligations,
including timely completion and adherence to quality standards. It acts as a security
for the project owner, minimizing the risk of delays or non-compliance.
6.7.5 The Employer reserves the right to accept or reject any variation or deviation.
Variations, deviations, and other factors which are in excess of the
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
requirements of the bidding documents or otherwise result in the accrual of
unsolicited benefits to the Employer shall not be taken into account in bid
6.7.6 The estimated effect of the price adjustment provisions of the Conditions of
Particular Application, applied over the period of execution of the Contract,
shall not be taken into account in bid evaluation.
6.7.7 If the bid of the technically qualified bidder is substantially below the
Employer's estimate for the contract, the Employer may require the bidder to
produce detailed price analyses to demonstrate the internal consistency of
those prices. After evaluation of the price analysis, the Employer may require
that the amount of the performance security set forth in Clause 12.3.3 be
increased at the expense of the successful bidder to a level sufficient to protect
the Employer against financial loss in the event of default of the successful
bidder under the Contract. However, if employer feels that with substantially
lower quotation, the desired quality of work is not possible, than it is at the
discretion and right of employer to reject or to consider such price offer.
Under such circumstances, the second lowest bidder shall be called for
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
7 AWARD OF CONTRACT
Subject to Clause 7.2, the Employer will award the Contract to the bidder
whose bid has been determined to be substantially responsive to the bidding
documents and who has offered the Lowest Evaluated Bid Price as per cl.
Provided that such bidder has been determined to be eligible in accordance
with the provisions of Clause 1.4.
7.2 Employer’s right to accept any bid or to reject any or all bids:
Not with standing Clause 7.1, the Employer reserves the right to accept or
reject any bid, and to annul the bidding process and reject all bids, at any
time prior to award of Contract, without thereby incurring any liability to the
affected bidder or bidders or any obligation to inform the affected bidder or
bidders of the grounds for the Employer's action.
7.3 Notification of award:
Prior to expiration of the period of bid validity prescribed by the Employer,
the Employer will notify the successful bidder confirmed by registered letter,
that its bid has been accepted. This letter (here in after and in the Conditions
of Contract called the “Letter of Intent") shall name the sum which the
Employer will pay the Contractor in consideration of the execution,
completion and maintenance of the Works by the Contractor as prescribed
by the Contract (here in after and in the Conditions of Contract called “the
Contract Price”.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
7.3.1 The notification of award will constitute the formation of the Contract.
7.3.2 Upon the furnishing by the successful bidder of a performance security, the
Employer will promptly notify the other bidders that their bids have been
unsuccessful and issue “Notice to proceed to successful bidder.”
7.4 Signing of contract agreement:
7.4.1 At the same time that the employer will notifies the successful bidder that its
bid has been accepted, the successful bidder has to enter in the Contract
Agreement as per Annexure D provided in the bidding documents,
incorporating all agreements between the parties.
7.4.2 Within 10 days of receipt of the LOA/LOI, the successful bidder has to sign the
contract agreement.
7.4.3 The successful bidder has to sign the contract agreement on stamp paper of
value required as per Gujarat stamp act 1958 and its revision if any.
7.5 Corrupt or fraudulent practices:
7.5.1 The RMC requires that bidders observe the highest standard of ethics during
the procurement and execution of such contracts. In pursuance of this policy:
(a) Defines for the purposes of this provision, the terms set forth below as
(i) ”Corrupt practices” means behavior on the part of officials in the public or
private sectors by which they improperly and unlawfully enrich themselves
and/or those close to them, or induce others to do so, by misusing the
position in which they are placed, and it includes the offering, giving,
receiving, or soliciting of anything of value to influence the action of any such
official in the procurement process or in contract execution;
(ii) “Fraudulent practice” means a misrepresentation of facts in order to
influence a procurement process or the execution of a contract to the
detriment of the Borrower, and includes collusive practice among bidders
(prior to or after bid submission) designed to establish bid prices at artificial
non-competitive levels and to deprive the borrower of the benefits of free
and open competition;
(b) Will reject a proposal for award if it determines that the bidder
recommended for award has engaged in corrupt or fraudulent practices in
competing for the contract in question;
(c) Will declare a firm ineligible, either indefinitely or for a stated period of time,
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
If at any time determines that the firm has engaged in corrupt and fraudulent
practices in competing for, or in executing the contract.
7.5.2 Deliverable: The key deliverables to be submitted by consultant and
associated timelines are mentioned as per clause 8.5 Time Schedule:
7.6 Mode of payment:
The fees quoted by the Consultant on the Part – A Fees (Rs.) by bidder in nProcure portal
shall be paid in stages, linked to completion and approval of deliverables under the Scope
of Work, along with post-award advisory support.
All payments shall be subject to certification of deliverables by Rajkot Municipal
Corporation (RMC).
Stage Deliverable Linked
Stage Completion of Part A – Project Vision, Market Assessment & Product Mix
Stage Completion of Part B – Conceptual & Schematic Design + Cost Estimation
Stage Completion of Part C – Transaction Advisory including RFP, Draft
3 Concession Agreement & Bid Process (Clause 8.6)
Stage Post-Award Advisory Support including Developer Handbook
4 finalisation, design clarifications during execution & Project Completion
If the tender needs to be uploaded more than once, no additional payment shall be made by
RMC for the repeated uploads.
The payment of success fees quoted by the Consultant on the Part – B Fees (in %) by bidder
in nProcure portal will be borne by Contractor done on the basis of financial progress
being done by the successful Contractor on site.
Since the project is complex in nature if due to any reason the circumstances arise which
are against the overall interest of project then RMC shall abandon the whole project
midway and the consultant shall not be paid any sum incurred by them.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
8 SCOPE OF WORK
8.1 Project Introduction
Rajkot is considered as the commercial capital of Saurashtra region with many small and
big scale Industries under Gujarat Industrial Development Corporation and Gujarat State
Financial Corporation. Despite of being a centre of engineering goods, bras parts
manufacturing, ceramics, watches and several other products, Saurashtra have limited
facility for hosting summits, exhibitions and convention. A multi facility convention centre
with indoor-outdoor exhibition spaces, lecture halls, meeting room, boardrooms and
several other facilities have been planned within the Smart City area. The centre is
strategically located on T.P. No.- 32 (Raiya) F.P. No.- 82&F.P.No. – 90 (Garden Purpose & for
Development of Green Entry as per Gujarat Town Planning and Urban Development Act,
1976) second ring road, efficiently connected to the Rajkot city. The 1.75 lakh square meter
land parcel Additional 0.24 lakh square meter land parcel(Garden Purpose & for
Development of Green Entry as per Gujarat Town Planning and Urban Development Act,
1976)for the convention centre is meant to be built as a hospitality destination with
upscale hotels, additional lodging options, parking facilities, shops, and a helipad. These
identified complimentary components promote Rajkot as an integrated business and
commercial hub. A convention centre with world-class standard housing all necessary
amenities have been planned.
8.2 Indicative Minimum Amenities
A. Convention & Event Facilities
Main Convention hall with moveable/divisible walls (Capacity Of 5000 Seats)
Indoor AC Exhibition Halls (min 2Nos Capacity Of 2000-2500 Capacity Each)
Conference & Seminar halls
Breakout & Meeting Rooms
Outdoor Exhibition/Event Space
Pre – function and foyer areas
Media Centre/Press Briefing Rooms
Translation and interpretation booths
Hotel rooms (min. 50 rooms) & cafeteria
Event control room and AV/ICT control spaces
B. Visitor & Delegate Facilities
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
Registration and ticketing zones
Business lounges
Food courts, restaurants, and cafeteria facilities
Business centre
Cloak rooms and storage spaces
C. Hospitality & Support Uses
Hotel accommodation (minimum 50 rooms, scalable based on feasibility)
Serviced apartments
Offices and commercial spaces
Retail and F&B outlets
D. Back-of-House, Operations & Safety
Loading docks and service yards
Dedicated service circulation separated from visitor movement
Kitchen, stores, and utility areas
Staff facilities (lockers, rest areas)
Waste management and segregation zones
Security command centre
Emergency medical / first-aid facilities
E. Site & Public Realm
Structured and surface parking facilities
Green entry, landscaped plazas, and public open spaces
Universal accessibility provisions exceeding minimum NBC requirements
F. Sustainability & Global Standards
IGBC / GRIHA / LEED certification target
Net-zero energy roadmap
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
District cooling / centralized HVAC feasibility
Universal accessibility beyond minimum NBC
Climate-resilient design (heat, water, flooding)
The design is intended to be developed as a state of art establishment installed with
modern technology, flexible space with space-shifting walls, breakout space and even
neighbourhood allure.
8.3 Mode of Implementation
The project to be undertaken under Public Private Partnership mode since it has the
possibility of sufficient profit generating potential to attract the private bidders.
8.4 Part A: Project Vision, Market assessment and Product Mix
8.4.1 Market study and Analysis
Conduct a demographic and economic analysis of Rajkot, focusing on population
growth, income levels, and employment trends.
Analyse existing and upcoming infrastructure projects (e.g., BRTS, Smart City
initiatives, DMIC) to evaluate their impact on site connectivity and attractiveness.
Study commercial, residential, retail, hospitality, and institutional real estate trends
in prime locations (e.g., Kalawad Road, University Road, 150 Feet Ring Road).
Identify demand drivers for convention centre-led developments, including MICE
(Meetings, Incentives, Conferences, Exhibitions) activities, tourism, and corporate
Event typology analysis, Seasonal assessment & Absorption analysis
Note : Event means Trade fairs, Corporate events, government summits, Cultural &
Public events .
Benchmark successful mixed-use developments with convention centres in India
and globally to identify best practices.
Assess competition, including existing convention facilities, hotels, and commercial
spaces in Rajkot.
Evaluate zoning regulations, RERA compliance, and municipal policies to ensure
viability of proposed asset classes.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
Market study report detailing demand, supply, pricing trends, and gaps for each
Area table expected outcome analysis.
Events analysis Report.
Infrastructure and regulatory assessment summary
8.4.2 Stakeholder Consultation and Vision Alignment
Conduct workshops with the client to understand the vision for the convention
centre-led development, including scale, target audience, and sustainability goals.
Engage with local authorities (e.g., Rajkot Urban Development Authority) to align
with city master plans and Smart City objectives.
Consult with potential anchor tenants (e.g., hotel chains, corporate, event
organizers) to gauge interest and requirements.
Identify community needs to ensure the development fosters social interaction and
economic growth.
Stakeholder consultation summary.
State government alignment (Tourism, industries, GIDB etc.)
Vision alignment document outlining key project goals and priorities.
8.4.3 Product mix Development:
Based on market study findings, propose Optimal mix complementary asset classes
o Convention centre (anchor) with flexible spaces for exhibitions, conferences,
o Hospitality (e.g., 4–5-star hotels, serviced apartments) to support MICE
o Commercial (e.g., Grade A offices, co-working spaces)
o Retail (e.g., upscale retail, F&B outlets, entertainment zones) to enhance
footfall and vibrancy.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
o Residential (e.g., Service Apartments) to cater to professionals and visitors.
o Institutional (e.g., educational or cultural facilities) to foster community
Develop a preliminary site allocation plan, apportioning the 30 Ha across proposed
asset classes, considering zoning and infrastructure requirements.
Ensure synergy between asset classes (e.g., shared parking, integrated public
spaces) to reduce costs and enhance user experience.
Incorporate sustainable design principles, such as green buildings, renewable
energy, and adaptive reuse, to align with modern development trends.
Assess financial viability of the proposed mix through high-level revenue
projections and risk analysis.
Product mix proposal report with asset class breakdown, rationale, and synergy
Preliminary site allocation plan (conceptual master plan).
8.4.4 Viability Assessment
Conduct a viability study to evaluate capital expenditure (CAPEX), operational
expenditure (OPEX), and return on investment (ROI) for each asset class.
Analyze risks, including market saturation, financing challenges, and regulatory
Propose mitigation strategies, such as phased development or public-private
partnerships (PPPs).
Ensure compliance with environmental standards.
Project Viability Report with financial projections and risk analysis.
Risk mitigation strategy document.
8.4.5 Final Report
Synthesize findings from market study, stakeholder consultations, and viability
analysis into a final product mix recommendation.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
Prepare a high-level implementation roadmap, including phasing, timelines, and key
Present final population, employment, and visiting population for the entire
Develop a presentation for client and stakeholder review, highlighting the
convention centre’s role as the anchor and the complementary asset classes’
Final product mix strategy report.
Implementation roadmap.
Presentation Detailed to RMC
8.5 Part B: Conceptual and Master Design + Cost Estimation
8.5.1 Conceptual master Planning & Urban Design Development
Develop a conceptual master plan based on the product mix, allocating spaces for
the convention centre, hospitality, commercial, retail, residential, and institutional
Define key urban design principles, including pedestrian connectivity, open spaces,
and circulation patterns, to ensure a vibrant and accessible development.
Incorporate sustainable design strategies, such as green roofs, rainwater harvesting,
and energy-efficient systems, aligning with Smart City and environmental standards.
Conduct workshops with the client to refine the conceptual design, ensuring
alignment with their vision and market study findings.
Integrate preliminary landscape design concepts, including native plantings, public
plazas, and green corridors, to enhance aesthetic and environmental value.
Conceptual master plan (2D diagrams max 3 concepts).
Urban design and landscape guideline summary.
Client workshop summary report.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
8.5.2 Master Design Development
Develop architectural designs for key components, including the convention centre
(e.g., plenary halls, breakout rooms, exhibition spaces), hotels, office buildings, retail
zones, and residential units.
Prepare Detailed landscape designs, detailing hardscapes, softscapes, and water
features, ensuring compliance with urban design guidelines.
Outline preliminary infrastructure plans, including roads, pedestrian pathways,
parking, and utilities (water, electricity, sewerage).
Ensure compliance with local regulations, including Rajkot Urban Development
Authority (RUDA) guidelines, RERA, and fire safety norms.
Conduct a preliminary environmental analysis to address site-specific conditions
(e.g., soil, topography, drainage).
Schematic architectural plans and elevations for key buildings.
Schematic landscape design plans.
Preliminary infrastructure layout.
Regulatory compliance checklist.
8.5.3 Preliminary Engineering Design - High Side Estimation
Prepare preliminary structural designs for major buildings, focusing on the
convention centre and high-rise components (e.g., hotels, residential towers).
Develop preliminary MEP (Mechanical, Electrical, Plumbing) designs, including
HVAC, lighting, power distribution, and water management systems.
Outline civil engineering plans for site grading, stormwater management, and road
networks, incorporating sustainable practices like permeable pavements.
Integrate green infrastructure, such as bioswales and solar energy systems, as
Conduct a constructability review to identify potential engineering challenges and
propose solutions.
Preliminary structural design report.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
Fire safety plan.
Preliminary MEP design schematics.
Civil engineering and green infrastructure plans.
Constructability review summary.
8.5.4 Preparation of Urban Design, Landscape, Transport & Infrastructures
Guidelines for Private Sector Partner
Define principles for site layout, building massing, setbacks, and public space
integration, emphasizing connectivity to the convention centre.
Specify standards for street hierarchies, pedestrian pathways, and urban plazas to
enhance accessibility and vibrancy.
Incorporate sustainable urban design principles, such as mixed-use zoning, compact
development, and climate-responsive design.
Align guidelines with Rajkot Urban Development Authority (RUDA) regulations,
Smart City objectives, and National Building Code (NBC).
Provide illustrative diagrams for key urban design elements (e.g., street sections,
building typologies).
Urban Design Guidelines document (1-2 pages, including text and diagrams).
Compliance checklist for Private Sector Partners.
8.5.5 Preparation of Landscape Strategy for Private Sector Partner
Define standards for landscape elements, including native plant species, tree cover,
and water-efficient irrigation systems.
Specify guidelines for public spaces, such as parks, plazas, and green corridors, to
support recreation and biodiversity.
Incorporate sustainable practices, such as xeriscaping, rainwater harvesting, and
permeable surfaces.
Ensure integration with urban design guidelines to create seamless transitions
between built and natural environments.
Provide visual references (e.g., mood boards, precedent images) for landscape
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
Landscape Strategy Guidelines document (1-2 pages, including text and visuals).
8.5.6 Preparation of Concept Transport Plan & Traffic Integrated Plan for Private
Define guidelines for internal road networks, prioritizing pedestrian and non-
motorized transport (e.g., cycle tracks, walkways).
Specify standards for public transport integration, including bus stops and potential
connections to Rajkot’s BRTS.
Outline parking requirements, including shared parking strategies and EV charging
stations, aligned with RUDA norms.
Promote last-mile connectivity through e-rickshaws, bike-sharing, or shuttle
services to the convention centre.
Ensure compliance with regional transport plans (e.g., Comprehensive Mobility Plan
Concept Transport Plan Guidelines document (1-2 pages, including diagrams).
Parking and connectivity standards summary.
8.5.7 Preparation of Detailed Infrastructure Plan for Private Sector Partner
Define standards for water supply, including rainwater harvesting and greywater
recycling, per local and Smart City guidelines.
Specify requirements for sewerage and stormwater management, incorporating
sustainable drainage systems (e.g., bioswales).
Outline electrical infrastructure standards, including renewable energy integration
(e.g., solar panels) and smart grid compatibility.
Provide guidelines for solid waste management, emphasizing segregation,
composting, and recycling facilities.
Ensure infrastructure scalability to accommodate phased development and future
Concept Infrastructure Plan Guidelines document (1-2 pages, including schematics).
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
Utility standards and sustainability checklist.
8.5.8 CAPEX Estimation
Develop a bill of quantities (BOQ) for architectural, landscape, and infrastructure
components based on schematic designs at PAR level. Estimate capital expenditure
(CAPEX) for construction, including materials, labour, and equipment, using current
market rates in Rajkot (e.g., CPWD rates, Gujarat SOR, local vendor quotes).
Calculate preliminary operational expenditure (OPEX) for utilities, maintenance,
and facility management, focusing on the convention centre and shared
infrastructure.
Account for contingencies, escalation, and sustainability features (e.g., energy-
efficient systems) in cost projections.
Benchmark costs against similar mixed-use developments in India to ensure
Provide a phased cost breakdown to align with potential development stages.
Provide Cost risk register & PPP lender Benchmarking.
BOQ and cost estimation report.
CAPEX and OPEX summary with phase-wise breakdown. Benchmarking analysis
8.5.9 Stakeholder Coordination; Associated approvals
Engage local authorities (e.g., RUDA, Rajkot Municipal Corporation) to confirm
compliance with zoning, building codes.
Coordinate with the client to review and approve conceptual and schematic designs.
Prepare submission packages for preliminary regulatory approvals, including layout
Address stakeholder feedback and revise designs as needed to secure approvals.
Responsibility matrix
Stakeholder feedback and revision summary.
Preliminary approval documentation (if applicable).
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
8.5.10 Final Report
Compile conceptual and schematic design drawings, and cost estimates into a
cohesive report.
Implementation roadmap, detailing next steps for detailed design and construction.
Develop a presentation for client and stakeholders, showcasing the design vision,
engineering viability, and cost estimates.
Final conceptual and schematic design report. Engineering design summary.
Cost estimation and phasing report
Final Architectural & Detailed Working Drawings
8.6 Part C: Transaction Advisory
8.6.1 PPP Structuring
Analyse the product mix, conceptual design, and mandatory guidelines to determine
the project’s scope, scale, and financial requirements.
Evaluate PPP models (e.g., Build-Operate-Transfer, Design-Build-Finance-Operate-
Transfer, Hybrid Annuity and / or variants as appropriate) suitable for a convention
centre-led mixed-use development.
Define risk allocation between public and private partners, covering construction,
operational, financial, and regulatory risks.
Develop the transaction modal & bid parameters basic viability for the public &
private sectors.
Assess viability gap funding (VGF) requirements and other government incentives
(e.g., tax exemptions, land subsidies) to enhance project attractiveness.
Ensure compliance with Gujarat Infrastructure Development Board (GIDB)
guidelines, RERA, and national PPP policies.
PPP Structuring Report, including model selection, risk allocation matrix, and
revenue-sharing framework.
VGF and incentive assessment report.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
8.6.2 Presentation to Central Govt. & State, if required, on behalf of Client
Prepare a detailed project presentation highlighting the project’s economic, social,
and tourism benefits.
Coordinate with Central Government bodies as required to explore funding under
appropriate schemes.
Develop financial models to demonstrate project viability, including capital
expenditure (CAPEX), operational expenditure (OPEX), and return on investment
Conduct stakeholder consultations to address concerns and incorporate feedback
into the funding proposal.
Prepare submission documents for government approvals, including project
reports, financial plans, and compliance checklists.
Project presentation deck
8.6.3 Preparation of RFP & DCA
Prepare a Request for Proposal (RFP) detailing project scope, technical
requirements, mandatory guidelines (urban design, landscape, engineering,
transport, infrastructure), and performance standards. Specify bid evaluation
criteria, including technical and financial parameters, ensuring alignment with state
/ national guidelines for similar projects.
Develop a draft Concession Agreement outlining roles, responsibilities, risk
allocation, revenue-sharing terms, and performance monitoring mechanisms.
Include mandatory guidelines from prior work (urban design, landscape strategy,
etc.) as binding annexures in the bidding documents.
RFP document.
Bid evaluation criteria and compliance checklist.
Performance KPIS
Design compliance framework
O & M Benchmarks
Penalty Framework
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
Draft Concession Agreement with annexures (mandatory guidelines, technical
specifications)
8.6.4 Bid Process Management
Develop a bid process timeline, including pre-bid meetings, site visits, and
submission deadlines.
Outreach to potential bidders.
Manage the RFP submission process, including document collection, clarifications,
and addenda issuance.
Evaluate bids based on pre-defined technical and financial criteria.
Support the client in drafting and signing the Concession Agreement, ensuring legal
and regulatory compliance.
Coordinate with legal advisors to address any disputes or clarifications during the
Bid process timeline and management plan.
RFP evaluation reports.
Negotiation summary and final Concession Agreement.
Bid process closure report.
8.6.5 Final Deliverables and Presentation
Compile all deliverables (PPP structure, funding proposals, bidding documents, and
bid process reports) into a comprehensive package.
Prepare a final presentation summarizing the PPP framework, government
approvals, selected bidder, and signed Concession Agreement.
Conduct a close-out meeting with the client to hand over deliverables and discuss
next steps for project implementation.
Final Transaction Advisory Report.
Presentation deck for client and stakeholders.
8.6.6 Preparation of Developer Handbook & Commercial Model Report
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
8.6.6.1 Objective
The Consultant shall prepare a comprehensive Developer Handbook & Commercial Model
Report for the PPP-based development of the Rajkot Convention & Exhibition District. The
Handbook shall serve as a single, consolidated reference document to assist prospective
bidders and lenders in understanding the project framework, development controls,
commercial structure, and implementation approach, and to facilitate informed and
competitive bidding.
8.6.6.2 Scope and Contents
The Developer Handbook & Commercial Model Report shall include, at a minimum, the
following sections:
(a) Project Overview & Vision
Project objectives and development vision
Role of the Convention & Exhibition Centre as the anchor facility
Overview of complementary components including hospitality, commercial, retail,
serviced apartments, institutional uses, and supporting infrastructure
(b) Land, Planning & Regulatory Framework
Site details, land parcels, boundaries, and ownership status
Applicable zoning, land use, FSI, height controls, setbacks, and development
Applicability of regulations, RERA provisions, National Building Code, fire safety
norms, and other statutory requirements
(c) Master Plan & Development Framework
Approved conceptual master plan and site allocation framework
Phasing strategy for development and monetization
Identification of shared and exclusive infrastructure components
(d) Design & Development Control Guidelines
Mandatory urban design, architectural, landscape, transport, and infrastructure
Sustainability and green building requirements
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
Design change control principles and compliance mechanism
(e) Integrated Cost Structure
Asset-wise and phase-wise indicative CAPEX estimates
Shared infrastructure cost allocation framework
Indicative OPEX benchmarks
(f) Commercial & Revenue Model
Asset-wise revenue streams and monetization mechanisms
Lease, revenue-share, and hybrid PPP model options
Indicative financial viability parameters and commercial assumptions
Escalation principles and payment mechanisms to the Authority
(g) PPP Structure & Risk Allocation
Recommended PPP structure and indicative concession tenure
Risk allocation matrix covering construction, market, financial, regulatory, and
operational risks
Assessment of Viability Gap Funding (VGF) and incentives, if applicable
(h) Operations & Management Framework
Convention & Exhibition Centre operations model
Event programming and MICE strategy overview
Staffing and facility management approach
(i) Approval & Implementation Roadmap
List of statutory approvals and clearances required
Roles and responsibilities of Authority, Consultant, and Concessionaire
Indicative timelines for approvals, subject to statutory processes
(j) Bidder Facilitation Information
Data Room index and document availability
Pre-bid clarification protocol
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
Key assumptions, constraints, and disclaimers
8.6.6.3 Deliverables
The Consultant shall submit the following deliverables:
Developer Handbook & Commercial Model Report (hard copy and editable soft
Executive summary for inclusion in bid documents
Presentation to Rajkot Municipal Corporation and stakeholders
8.6.6.4 Status of the Developer Handbook
The Developer Handbook shall serve as a guiding and reference document for bidders and
shall be annexed to the RFP and Draft Concession Agreement for informational and
facilitative purposes only.
In case of any inconsistency between the Developer Handbook and the provisions of the
RFP or the executed Concession Agreement, the RFP and the executed Concession
Agreement shall prevail.
8.6.6.5 Disclaimers and Limitations
All financial indicators, cost estimates, revenue projections, and viability parameters
provided in the Developer Handbook shall be indicative in nature only and shall not
be construed as guarantees, assurances, or commitments by Rajkot Municipal
Cost estimates shall be prepared for bid facilitation purposes and shall not
constitute final project costs.
The Developer Handbook and associated guidelines shall not be construed as
detailed design documents. The Concessionaire shall remain fully responsible for
detailed design, engineering, construction, and statutory approvals in accordance
with the Concession Agreement.
8.6.6.6 Review and Approval
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
The draft Developer Handbook shall be submitted to Rajkot Municipal Corporation for
review and comments. The Consultant shall incorporate the comments received and submit
the final Developer Handbook upon approval by Rajkot Municipal Corporation.
8.7 Time Schedule:
The preparation of feasibility report, work plan, detailed feasibility report, inception
report, draft PPP structure and risk allocation report etc. covered by this bidding are
required to be completed within the period specified in and the Appendix to Technical
Proposal. Bidders submitting bids that deviate from the time schedule specified will be
Sr Name of Work Timeline (Weeks)
1 Inception Report T+4
2 Site Analysis & Demand Assessment T+6
3 Draft report T+7
4 Final report & DPR T+9
5 Developer Handbook T+14
6 Bid Documents T+18
Note: If timeline shown in above table is not met than 0.1 % per day up to 10%
shall be panelized of fees decided as success amount.
T Represents the day of Award of work order.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
9 GENERAL CONDITION OF CONTRACT
9.1 Definitions:
Unless the context otherwise requires, the following terms whenever used in this Contract
have the following meanings.
(i) "Applicable Law"means the laws and any other instruments having the force
of law in the Client's city, State and country and in force from time to time.
(ii) "Client"means the implementing agency that signs the Contract for the
Services with the Selected Consultant.
(iii) "Consultant"means a legally established professional consulting firm or entity
selected by the Client to provide the Services under the signed Contract.
(iv) "Contract"means the legally binding written agreement signed between the
Client and the Consultant and which includes all the attached documents listed
in its paragraph 1 of the Form of Contract (the General Conditions (GCC), the
Special Conditions (SCC), and the Appendices).
(v) "Contract Price"means the price payable to the Consultant as specified in the
Contract agreement, Subject to such additions and adjustments there to or
deductions there from, as may be made pursuant to the contract.
(vi) "Contract Documents"means the documents listed in the contract
agreement, including any amendments there to.
(vii) "Day"means a working day unless indicate do ther wise.
(viii) "Effective Date"means the date on which this Contract comes into force and
effect pursuant to Clause GCC9.1.1
(ix) "Experts"means, collectively, Key Experts, Non-Key Experts, or any other
personnel of the Consultant, Sub-consultant or JV member(s) assigned by the
Consultant to perform the Services or any part thereof under the Contract.
(x) "Foreign Currency"means any currency other than the currency of the
Client's country.
(xi) "GCC"means these General Conditions of Contract.
(xii) "Government"means the Government of the Gujarat or Government ofIndia. For
the performance of the Contract.
(xiii) "Key Expert(s)"means an individual professional whose skills,
qualifications, knowledge and experience are critical to the performance of the
Services under the Contract and whose Curricula Vitae (CV) was taken into
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
account in the technical evaluation of the Consultant's proposal.
(xiv) "Local Currency"means the currency of the Client's country.
(xv) "Non-Key Expert(s)"means an individual professional provided by the
Consultant or its Sub-consultant to perform the Services or any part thereof
under the Contract.
(xvi) "Party"means the Client or the Consultant, as the case may be, and
"Parties" means both of them.
(xvii) "SCC"means the Special Conditions of Contract by which the GCC may be
amended or supplemented but not over-written.
(xviii) "Services"means the work to be performed by the Consultant pursuant to
this Contract, as described in Appendix 1 hereto.
9.1.2 Entities:
(i) Authority means Rajkot Municipal Corporation (RMC)
(ii) "Member"in case of consultant consisting of a joint venture of more than one
entity, means any of these entities, and "Members"means all of these entities.
(iii) "Party"means the Client or the Consultant, as the case may be and"Parties"
Means both of them.
(iv) Client"means the entity purchasing the Services, as specified in the SCC.
(v) "Project Manager"means the person named as such in the SCC or otherwise
appointed by the Client in the manner provided in GCC Clause 9.3.1 (Project
Manager) to perform the duties delegated by the Client.
(vi) "Consultant"means the firm or consultant or Joint Venture or Consortium
whose bid or Proposal to perform the Contract has been accepted by the Client
and is named as such in the Contract Agreement.
(vii) "Consultant's Representative"means any person nominated by the Consultant
and named as such in the SCC or otherwise approved by the Client in the
manner provided in GCC 9.3.3 (Consultant's Representative) to perform the
duties delegated by the Consultant.
(viii)"Owner's Engineers"mean the client's engineer or a representative of the client
who is an independent third party of the client to ensure the designing,
execution and supervision aspects of works assigned.
9.1.3 Key Contractual Terms:
(i) "Confidential Information" means all information, whether in written, oral,
electronic or any other form, relating to the technical, financial, legal,
commercial or business affairs, customers, consultants, products,
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
developments, operations, processes, data (including all Project Data), trade
secrets, design rights, know-how, intellectual property and personnel of a
Party or its Affiliates, which is: (a) identified or marked as ”confidential”,
”proprietary” or with a similar indication at the time of disclosure; or (b)
disclosed in circumstances in which a reasonable person would understand
such information to be confidential, including information disclosed during
negotiations, site or location visits, presentations and meetings in connection
with this Agreement or the Project Agreement. Provided that where the
receiving Party is required by applicable law, regulation or order of a court or
governmental authority to disclose Confidential Information, it may do so to
the extent legally required, subject to giving prompt prior written notice to
the disclosing Party and taking reasonable steps to seek confidential
(ii) "Deliverables"means the products, infrastructure and services specifically
developed for "Rajkot Convention & Exhibition Centre"and agreed to be
delivered by the Consultant in pursuance of the agreement and include all
documents related to the service, user manuals, technical manuals, design,
methodologies, process and operating manuals, service mechanisms, policies
and guidelines, and all their modifications.
(iii) "Goods"meansallequipment,machinery,furnishings,Materials,andothertangibl
e items that the Consultant is required to supply or supply and install under
the Contract, including, without limitation, the Information Technologies and
Materials, but excluding the Consultant's Equipment.
(iv) "Proprietary Information"means processes, methodologies and technical,
financial and business information, including drawings, design prototypes,
designs, formulae, flow charts, data, computer database and computer
programs already owned by, or granted by third Parties to a Party hereto
prior to its being made available under this Agreement, Project Agreement or
a Project Engagement Definition.
(v) "Services"means all technical, logistical, management, and any other Services
to be provided by the Consultant under the Contract. Such Services may
include, but are not restricted to, activity management and quality assurance,
design, development, study, documentation, transportation, insurance, testing,
validation, expediting, site preparation, installation, integration, training, data
migration, maintenance, operations and technical support.
(vi) "Service Level"means the level and quality of service and other performance
criteria which will apply to the Services as set out in any Project Agreement.
(vii) "The Project Plan"means the document to be developed by the Consultant
and approved by the Client, pursuant to GCC 14.1, based on the requirements
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
of the Contract and the Preliminary Project Plan included in the Consultant's
bid. The "Agreed and Finalized Project Plan"is the version of the Project
Plan approved by the Client, in accordance with GCC 14.1Should the Project
Plan conflict with the Contract in any way, the relevant provisions of the
Contract, including any amendments, shall prevail.
(viii) "Software"is a collection of computer programs and related data that provide
the instructions for telling a computer what to do and how to do it.
(ix) "Materials"means all documentation in printed or printable form and all
instructional and informational aides in any form (including graphics, audio,
video, text etc.) and on any medium, provided to the Client under the Contract.
(x) "Intellectual Property Rights" means all rights, in any jurisdiction worldwide,
whether registered or unregistered, whether existing now or in the future, and
whether vested, contingent or prospective, in the nature of, copyright and related
rights (including rights in software and databases), moral rights, including without
limitation all economic rights and all exclusive rights to reproduce, fix, adapt,
modify, translate, create derivative works from, extract or reutilize data from,
manufacture, introduce into circulation, publish, distribute, sell, license, sublicense,
transfer, rent, lease, transmit or provide access electronically,broadcast, display,
enter into computer memory, or otherwise use any portion or copy, in whole or in
part, in any form, directly or indirectly, or to authorize or assign others to do so,
patents, utility models, invention rights and rights in know‑how and trade secrets,
trademarks, service marks, trade names, business names, trade dress, logos, brand
names, internet domain names and social media handles, design rights, industrial
designs, semi‑conductor/mask work rights, rights in data compilations and all other
intellectual property and proprietary rights of a similar or corresponding nature, in
each case including all applications for, and rights to apply for, such rights and all
renewals, extensions, restorations and revivals thereof.”
(xi) "Consultant's Equipment"means all equipment, tools, apparatus, or things of
every kind required in or for the services that is to be provided by the
9.1.4 Activities:
(i) "Delivery"means the transfer of the Goods or Services from the Consultant to
the Client specified in the Contract.
(ii) "Personnel"means persons hired by the Consultant or by any Subcontractor
as employees and assigned to the performance of the Services or any part
9.1.5 Place and Time:
(i) "Day"means calendar day of the English Calendar.
(ii) "Week"means seven(7) consecutive Days, beginning Monday.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
(iii) "Month"means calendar month of the English Calendar.
(iv) "Title"means twelve(12) consecutive Months.
(v) "Effective Date"means the date on which this Contract comes into force and
effect pursuant to Clause GCC 9.1.1
(vi) "Contract Period"is the time period during which this Contract governs the
relations and obligations of the Client and Consultant in relation to the Work, as
specified in the SCC.
(vii) "The Coverage Period"means the Days of the Week and the hours of those Days
during which maintenance, operational, and/or technical support services (if any)
must be available.
9.2 Interpretation
9.2.1 Contract Documents
Subject to Article 1.2 (Order of Precedence) of the Contract Agreement, all
documents forming part of the Contract (and all parts of these documents) are
intended to be correlative, complementary, and mutually explanatory. The Contract
shall be read as a whole.
9.2.2 Governing Law
This Contract, its meaning and interpretation, and the relation between the Parties
shall be governed by the Applicable Law.
9.2.3 Governing Language
This Contract has been executed in the language specified in the SCC, which shall be
the binding and controlling language for all matters relating to the meaning or
interpretation of this Contract.
9.2.4 Relation between the parties
Nothing contained herein shall be construed as establishing a relationship of master
and servant or of principal and agent as between the Client and the Consultant. The
Consultant, subject to this Contract, has complete charge of the Experts and Sub-
consultants, if any, performing the Services and shall be fully responsible for the
Services performed by them or on their behalf hereunder.
9.2.5 Singular and Plural
The singular shall include the plural and the plural the singular, except where the
context other -wise requires.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
The headings shall not limit, alter or affect the meaning of this Contract. Persons
Words importing persons or parties shall include firms, corporations, and
government entities.
9.2.7 Entire agreement
This Contract contains all covenants, stipulations and provisions agreed by the Parties.
No agent or representative of either Party has authority to make, and the Parties shall
not be bound by or be liable for, any statement, representation, promise or agreement
not set forth herein.
9.2.8 Amendment
No amendment or other variation of the Contract shall be effective unless it is in
writing, is dated, express lyrefers to the Contract, and is signed by a duly authorized
representative of each party to the Contract.
9.2.9 Independent Consultant
The Consultant shall be an independent Consultant performing the Contract. The
Contract does not create any agency, partnership, joint venture, or other joint
relationship between the parties to the Contract. Subject to the provisions of the
Contract, the Consultant shall be solely responsible for the manner in which the
Contract is performed.
9.2.10 Location
The proposed location for said project is T.P. No.- 32 (Raiya) F.P. No.- 82 & F.P.No. -
90 (Garden Purpose & for Development of Green Entry as per Gujarat Town
Planning and Urban Development Act, 1976)second ring road, efficiently connected
to the Rajkot city. The 1.75 lakh square meter land parcel Additional 0.24 lakh
square meter land parcel (Garden Purpose & for Development of Green Entry as per
Gujarat Town Planning and Urban Development Act, 1976)for the Convention&
Exhibition Centre
9.2.11 Non waiver
(a) Subject to GCC 9.2.11 (b) of this Clause below, no relaxation, for bearance, delay,
or indulgence by either party in enforcing any of the terms and conditions of the
Contract or the granting of time by either party to the other shall prejudice,
affect, or restrict the rights of that party under the Contract, nor shall any
waiver by either party of any breach of Contract operate as waiver of any
subsequent or continuing breach of Contract.
(b) Any waiver of a party's rights, powers, or remedies under the Contract must be
in writing, must be dated and signed by an authorized representative of the
party granting such waiver, and must specify the right and the extent to which it
is being waived
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
9.2.12 Severability
If any provision or condition of the Contract is prohibited or rendered invalid or
unenforceable, such prohibition, invalidity, or unenforceability shall not affect the
validity or enforceability of any other provisions and conditions of the Contract.
9.2.13 Fairness And Good Faith
The parties undertake to act in good faith with respect to each other's rights under
this contract and to adopt all reasonable measures to ensure the realization of the
objectives of this contract.
Operation of the Contract
The parties recognize that it is impractical in this contract to provide for every
contingency which may arise during the life of the contract, and the parties hereby
agree that it is their intention that this contract shall operate fairly as between them,
and without detriment to the interest of either of them, and that, if during the term
of this contract either party believes that this contract is operating unfairly, the
parties will use their best efforts to agree on such action as may be necessary to
remove the cause or causes of such unfairness, but no failure to agree on any action
pursuant to this clause shall give rise to a dispute subject to arbitration in
accordance with "Dispute Settlement" 9.5 clause GCC hereof.
9.3 Representative:
9.3.1 Authorized Representatives
Any action required or permitted to be taken, and any document required or
permitted to be executed under this Contract by the Client or the Consultant may be
taken or executed by the officials specialized in the SCC.
9.3.2 Project Manager
If the Project Manager is not named in the Contract, then within fourteen [14] days
from the Effective Date, the Client shall appoint and notify the Consultant in writing
of the name of the Project Manager. The Client may from time to time appoint some
other person as the Project Manager in place of the person previously so appointed
and shall give a notice of the name of such other person to the Consultant without
delay. No such appointment shall be made at such a time or in such a manner as to
impede the progress of work. Such appointment shall take effect only upon receipt
of such notice by the Consultant. Subject to the extensions and/or limitations
specified in the SCC (if any), the Project Manager shall have the authority to
represent the Client on all day-to-day matters relating to the Contract, and shall
normally be the person giving or receiving notices on behalf of the Client pursuant
to "Notices"9.4 Clause GCC.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
9.3.3 Consultant's Representative
(a) If the Consultant's Representative is not named in the Contract, then within
fourteen [14] days from the Effective Date, the Consultant shall appoint the
Consultant's Representative and shall request the Client in writing to approve
the person so appointed. The request must be accompanied by detailed
curriculum vitae for the nominee, as well as a description of any other
responsibilities the nominee would retain while performing the duties of the
Consultant's Representative. If the Client does not object to the appointment
within fourteen [14]* days, the Consultant's Representative shall be deemed to
have been approved. If the Client objects to the appointment within fourteen
[14] days giving the reason therefore, then the Consultant shall appoint a
replacement within fourteen [14] days of such objection in accordance with the
Sub-Clause 9.3.2(a) of this Clause GCC.
(b) Subject to the extensions and/or limitations specified in the SCC (if any), the
Consultant's Representative shall have the authority to represent the Consultant
on all day-to-day matters relating to the Contract, and shall normally be the
person giving or receiving notices on behalf of the Consultant pursuant to unless
specified otherwise in the SCC "Notices"9.4 Clause GCC.
(c) The Consultant shall not revoke the appointment of the Consultant's
Representative without the Client's prior written consent, which shall not be
unreasonably with held. If the Client consents to such an action, the Consultant
shall appoint another person of equal or superior qualifications as the
Consultant's Representative, pursuant to the procedure set out in 9.3.2(a) of this
(d) The Consultant's Representative and staff are obliged to work closely with the
Client's Project Manager and staff, act within their own authority, and abide by
directives issued by the Client that are consistent with the terms of the Contract.
TheConsultant's Representative is responsible for managing the activities of its
personnel and any subcontracted personnel.
(e) The Consultant's Representative may, subject to the approval of the Client
(which shall not be unreasonably with held), at any time delegate to any person
any of the powers, functions, and authorities vested in him or her. Any such
delegation may be revoked at any time. Any such delegation or revocation shall
be subject to a prior notice signed by the Consultant's Representative and shall
specify the powers, functions, and authorities thereby delegated or revoked. No
such delegation or revocation shall take effect unless and until the notice of it
has been delivered.
(f) Any act or exercise by any person of powers, functions and authorities so
delegated to him or her in accordance with Sub-Clause 9.3.2(e) of this Clause
GCC shall be deemed to be an act or exercise by the Consultant's Representative.
9.3.4 Objections and Removals
If the Client finds that any of the Experts has committed serious misconduct or has
been charged with having committed a criminal action, or shall the Client determine
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
that Consultant's Expert have engaged in corrupt, fraudulent, collusive, coercive or
obstructive practice while performing the Services, the Consultant shall, at the
Client's written request, provide a replacement.
In the event that any of Key Experts, Non-Key Experts is found by the Client to be
incompetent or incapable in discharging assigned duties, the Client, specifying the
grounds therefore, may request the Consultant to provide a replacement, any
replacement of the removed Experts shall possess better qualifications and
experience and shall be acceptable to the Client.
Except as the Client may otherwise agree,
i. The Consultant shall bear all additional travel and other costsarising out of or
incidental to any removal and/or replacement, and
ii. The remuneration to be paid for any of the Experts provided as a replacement
shall not exceed the remuneration which would have been payable to the
Experts replaced or removed.
Unless otherwise stated in the Contract, all notices to be given under the Contract
shall be in writing and shall be sent, pursuant to Sub-Clause9.4.3 of this Clause GCC
below, by personal delivery, registered post, special courier, cable, telegraph, telex,
facsimile, electronic mail, or Electronic Data Interchange (EDI), with the following
(a) Any notice sent by cable, telegraph, telex, facsimile, electronic mail, or EDI shall
be confirmed within two (2*) days after dispatch by notice sent by registered
post or special courier, except as otherwise specified in the Contract.
(b) Any notice sent by registered post or special courier shall be deemed (in the
absence of evidence of earlier receipt) to have been delivered ten (10*) days
after dispatch. In proving the fact of dispatch, it shall be sufficient to show that
the envelope containing such notice was properly addressed, stamped, and
conveyed to the postal authorities or courier service for transmission by mail or
special courier.
(c) Any notice delivered personally or sent by cable, telegraph, telex, facsimile,
electronic mail, or EDI shall be deemed to have been delivered on the date of its
(d) Either party may change its postal, cable, telex, facsimile, electronic mail, or EDI
addresses for receipt of such notices by ten (10) days' notice to the other party
Notices shall be deemed to include any approvals, consents, instructions, orders,
certificates, information and other communication to be given under the Contract.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
Pursuant to "Representatives"9.3 Clause GCC, notices from/to the Client are
normally given by, or addressed to, the Project Manager, while notices from/to the
Consultant are normally given by, or addressed to, the Consultant's Representative,
or in its absence its deputy if any. If there is no appointed Project Manager or
Consultant's Representative (or deputy), or if their related authority is limited by
the sub-clause 9.3.1 or "Representatives" 9.3.2(b) of "Representatives"
Clause of SCC for GCC, or for any other reason, the Client or Consultant may give and
receive notices at their fallback addresses. The address of the Project Unless
otherwise specified in SCC.
Manager and the fallback address of the Client are as specified in the SCC or as
subsequently established/amended. The address of the Consultant's Representative
and the fallback address of the Consultant are as specified in SCC of the Contract
Agreement or as subsequently established/ amended.
9.5 Disputed Settlement
9.5.1 Settlement of Disputes
The Parties shall seek to resolve any dispute amicably by mutual consultation.
If either Party objects to any action or inaction of the other Party, the objecting Party
may file a written Notice of Dispute to the other Party providing in detail the basis of
the dispute. The Party receiving the Notice of Dispute will consider it and respond in
writing within fourteen [14*] days after receipt. If that Party fails to respond within
fourteen [14*] days, or the dispute cannot be amicably settled within fourteen [14*]
days following the response of that Party.
9.5.2 Arbitration–No Arbitration
9.6 Copyright, Confidential Information, and Ownership
9.6.1 Copyright
As applicable, the Client's and Consultant's rights and obligations with respect to the
designs, methodologies, algorithms, surveys, data, analysis, results and reports
among other things in the deliverables, are specified in the SCC. Subject to the SCC,
the Intellectual Property Rights in all the designs, methodologies, data, analysis,
results and reports among other things in the deliverables of the Contract
Agreement shall, at the date of this Contract or on creation of the rights (if later than
the date of this Contract), vest in the Client. The Consultant shall do and execute or
arrange for the doing and executing of each necessary act, document, and thing that
the Client may consider necessary or desirable to perfect the right, title, and interest
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
of the Client in and to those rights. In respect of such deliverable, the Consultant
shall ensure that the holder of a moral right in such an item does not assert it, and
the Consultant shall, if requested to do so by the Client and were permitted by
applicable law, ensure that the holder of such a moral right waives it.
Except with the prior written consent of the Client, the Consultant and the Experts
shall not at any time communicate to any person or entity any confidential
information acquired in the course of the Services, nor shall the Consultant and the
Experts make public the recommendations formulated in the course of, or as a result
of, the Services.
Unless otherwise specified in the SCC
For the purposes of sub-clause 9.6.2 of this clause GCC, the Consultant is also
deemed to be the Receiving Party of Confidential Information generated by the
Consultant itself in the course of the performance of its obligations under the
Contract and relating to the businesses, services, finances, Consultants, employees,
or other contacts of the Client or the Client's use of the deliverables.
Not with standing sub-clause 9.6.2 and sub-clause 9.6.3 of this clause GCC the
Consultant may furnish to its Sub contractor Confidential Information of the Client
to the extent reasonably required for the Sub contractor to perform its work under
the Contract, in which event the Receiving Party shall ensure that the person to
whom it furnishes Confidential Information of the Disclosing Party is aware of and
abides by the Receiving Party's obligations under this GCC Clause as if that person
were party to the Contract in place of the Receiving Party.
The Consultant shall not, without the Client's prior written consent, use any
Confidential Information received from the Client for any purpose other than those
that are required for the performance of the Contract.
The obligation of the Receiving Party under sub-clause 9.6.2 through of this clause
GCC, however, shall not apply to that information which
(a) Now or here after enters the public domain through no fault of the Receiving Party;
(b) can be proven to have been possessed by the Receiving Party at the time of
disclosure and that was not previously obtained, directly or indirectly, from the
Disclosing Party;
(c) Otherwise lawfully becomes available to the Receiving Party from a third party
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
The above provisions of this GCC Clause shall not in any way modify any
undertaking of confidentiality given by the Consultant prior to the date of the
Contract in respect of the System or any part thereof.
The provisions of this GCC Clause shall survive the termination, for whatever
reason, of the Contract for three [3] years or such longer period as may be specified
The ownership of the deliverables and other Services or Goods shall be transferred
to the Client at the time of Delivery or otherwise under terms that may be agreed
upon and specified in the Contract Agreement.
Ownership and the terms of usage of the deliverables supplied under the Contract
shall be governed by sub-clause 9.6.1 of this clause GCC and any elaboration in the
All plans, drawings, specifications, designs, reports, algorithms, source code of
software, any similar thing prepared utilizing the Client's domain knowledge, and
other documents and tools prepared by the Consultant for the Client under this
contract shall become and remain the property of the Client, and the Consultant
shall, not later than upon termination or expiration of this contract, deliver all such
documents to the Client together with a detailed inventory thereof. The Consultant
may retain a copy of such documents, tools and software, if any. Restriction about
the future use of these documents and software, if any, shall be specified in the SCC.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
10GUARANTEES, LIABILITIES, INDEMNITIES, INSURANCE
10.1 Time Guarantee and Liquidated Damages Trigger
10.1.1 Guarantee
The Consultant guarantees that it shall complete the performance of various
activities of the contract within the time periods specified in the Implementation
Schedule in the Requirements part of Tender Documents and/or the Agreed and
Finalized Project Plan pursuant to GCC Clause 14.1, or within such extended time to
which the Consultant shall be entitled under GCC Clause 9.1.5 (Extension of Time).
10.1.2 Triggering of Liquidated Damages
(a) If the Consultant fails to perform the various activities within the time specified in
the Implementation Schedule in the Requirements part of Tender Documents or
the Agreed and Finalized Project Plan, or any extension of the time previously
granted under GCC Clause 9.1.5 (Extension of Time), the Consultant shall pay to
the Client liquidated damages at the rate specified in the SCC as a percentage of
the Contract Price, or the relevant part of the Contract Price if an item/activity has
not been performed. The aggregate amount of such liquidated damages shall in no
event exceed the amount specified in the SCC ("the Maximum"). Once the
Maximum is reached, the Client may consider termination of the Contract,
pursuant to GCC Clause9.2.2.
(b) Unless otherwise specified in the SCC, liquidated damages payable under Sub-
clause 9.1.2(a)of this clause GCC shall apply only to the failure to perform the
activities/items as specified in the Implementation Schedule in the
Requirements and/or Agreed and Finalized Project Plan. This shall not limit,
however, any other rights or remedies the Client may have under the Contract
for other delays.
(c) If liquidated damages are claimed by the Client for the activity or item, the
Consultant shall have no further liability what so ever to the Client in respect to
the time guarantee for the activity or item. However, the payment of liquidated
damages shall not in any way relieve the Consultant from any of its obligations
to complete the System or from any other of its obligations and liabilities under
(d) If timeline shown in Clause 8.5 (Time Schedule) is not met than 0.1 % per day up to
10% shall be panelized of fees decided as success amount.
10.2 Service Conformity Guarantee and Performance Security Trigger
The Consultant guarantees that, once the Acceptance Certificate(s) has been issued,
the work is in compliance with the Client's requirements set forth in the
Requirements and it conforms to all other aspects of the Contract. The Consultant
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
acknowledges that GCC Clause 14.2.5 regarding Acceptance governs how
conformance of the work to the Contract requirements will be determined.
If, for reasons attributable to the Consultant, the work does not conform to the
Requirements or does not conform to all other aspects of the Contract, the
Consultant shall at its cost and expense make such changes, modifications, and/or
additions as may be necessary to conform to the Requirements and meet all
standards. The Consultant shall notify the Client upon completion of the necessary
changes, modifications, and/or additions and shall request the Client to recheck.
If the work fails to conform to the Requirements, the Client may consider
termination of the Contract, pursuant to GCC Clause 9.2, and for feiture of the
Consultant's Performance Security in accordance with GCC Clause 12.3 in
compensation for the extra costs and delays likely to result from this failure.
10.3 IPR Warranty and Indemnity
10.3.1 IPR Warranty
The Consultant here by represents and warrants that the performance of the
Service, does not and will not infringe any Intellectual Property Rights held by any
third party and that it has all necessary rights or at its sole expense shall have
secured in writing all transfers of rights and other consents necessary to make the
assignments, licenses, and other transfers of Intellectual Property Rights and the
warranties set forth in the Contract, and for the Client to own or exercise all
Intellectual Property Rights as provided in the Contract. Without limitation, the
Consultant shall secure all necessary written agreements, consents, and transfers of
rights from its employees and other persons or entities whose services are used.
10.3.2 IPR Indemnity
The Consultant shall indemnity and hold harmless the Client and its employees and
officers from and against any and all losses, liabilities, and costs (including losses,
liabilities, and costs incurred in defending a claim alleging such a liability), that the
Client or its employees or officers may suffer as a result of any infringement or
alleged infringement of any Intellectual Property Rights by reason of performance of
Pls. Note: If there is any financial burden due to the bidder’s act,the same will be
borne by the Bidder.
Such indemnities shall not apply if any claim of infringement
(a) Is asserted by a parent, subsidiary, or affiliate of the Client's organization;
(b) Is a direct result of a design mandated by the Client's Requirements and the
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
possibility of such infringement was duly noted in the Consultant's Proposal or
If any proceedings are brought or any claim is made against the Client arising out of
the matters referred to in Sub-clause10.3.2 of this clause GCC, the Client shall
promptly give the Consultant notice of such proceedings or claims, and the
Consultant may at its own expense and in the Client's name conduct such
proceedings or claim and any negotiations for the settlement of any such
proceedings or claim.
If the Consultant fails to notify the Client within twenty-eight [28*] days after
receipt of such notice that it intends to conduct any such proceedings or claim, then
the Client shall be free to conduct the same on its own behalf. Unless the Consultant
has so failed to notify the Client within the twenty-eight [28*] days, the Client shall
make no admission that may be prejudicial to the defense of any such proceedings
or claim. The Client shall, at the Consultant's request, afford all available assistance
to the Consultant in conducting such proceedings or claim and shall be reimbursed
by the Consultant for all reasonable expenses incurred in so doing.
The Client shall indemnify and hold harmless the Consultant and its employees,
officers, and Subcontractors from and against any and all losses, liabilities, and costs
(including losses, liabilities, and costs incurred in defending a claim alleging such a
liability) that the Consultant or its employees, officers, or Subcontractors may suffer
as a result of any infringement oral leged infringement of any Intellectual Property
Rights arising out of or in connection with any design, data, drawing, specification,
or other documents or materials provided to the Consultant in connection with this
Contract by the Client or any persons (other than the Consultant) contracted by the
Client, except to the extent that such losses, liabilities, and costs arise as a result of
the Consultant's breach of Sub- clause of this clause GCC.
Such indemnity shall not cover
(a) Any use of the design, data, drawing, specification, or other documents or
materials, other than for the purpose indicated by or to be reasonably inferred
from the Contract;
(b) Any infringement resulting from the use of the design, data, drawing,
specification, or other documents or materials, or any products produced
thereby, in association or combination with any other Goods or Services not
provided by the Client or any other person contracted by the Client, where the
infringement arises because of such association or combination and not because
of the use of the design, data, drawing, specification, or other documents or
materials in its own right.
Such indemnities shall also not apply
(a) If any claim of infringement is asserted by a parent, subsidiary, or affiliate of the
Consultant's organization;
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
(b) To the extent that any claim of infringement is caused by the alteration, by the
Consultant, or any persons contracted by the Consultant, of the design, data,
drawing, specification, or other documents or materials provided to the
Consultant by the Client or any persons contracted by the Client.
If any proceedings are brought or any claim is made against the Consultant arising
out of the matters referred to in Sub-clause 10.3.2 of this clause GCC, the Consultant
shall promptly give the Client notice of such proceedings or claims, and the Client
may at its own expense and in the Consultant's name conduct such proceedings or
claim and any negotiations for the settlement of any such proceedings or claim. If
the Client fails to notify the Consultant within twenty-eight [28*] days after receipt
of such notice that it intends to conduct any such proceedings or claim,
Unless otherwise specified in the SCC
Then the Consultant shall be free to conduct the same on its own behalf. Unless the
Client has so failed to notify the Consultant within the twenty-eight [28*] days, the
Consultant shall make no admission that may be prejudicial to the defense of any
such proceedings or claim. The Consultant shall, at the Client's request, afford all
available assistance to the Client in conducting such proceedings or claim and shall
be reimbursed by the Client for all reasonable expenses incurred in so doing.
Unless specified in the SCC.
10.4 Limitation of Liability
(a) Subject to additional provisions, if any, set forth in the SCC, the Consultant's
liability under this Contract shall be as determined under the Applicable Law.
(b) The Consultant shall not be liable to the Client, whether in contract, tort, or
otherwise, for any indirect or consequential loss or damage, loss of use, or loss
of "interest"costs, provided that this exclusion shall not apply to any obligation
of the Consultant to pay liquidated damages to the Client; and the Consultant
shall replace all the equipment which is intentionally / accidentally damaged
during the course of supply of services.
(c) The aggregate liability of the Consultant to the Client, whether under the
Contract, in tort or otherwise, shall not exceed the total Contract Price, agreed
by the both parties; provided that this limitation shall not apply to any
obligation of the Consultant to indemnify the Client with respect to intellectual
property rights infringement.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
The Consultant shall abide by the job safety, insurance, other prevalent measures
and the Applicable Law.
Subject to Sub-clause 10.5.3 of this Clause GCC, the Consultant shall indemnify and
hold harmless the Client and its employees and officers from and against any and all
losses, liabilities and costs (including losses, liabilities, and costs incurred in
defending a claim alleging such a liability) that the Client or its employees or officers
may suffer as a result of the death or injury of any person or loss of or damage to
any property arising in connection with the service and by reason of the negligence
of the Consultant, or their employees, officers or agents, except any injury, death, or
property damage caused by the negligence of the Client, its contractors, employees,
officers, or agents.
If any proceedings are brought or any claim is made against the Client that might
subject the Consultant to liability under Sub-clause 10.5.2 of this clause GCC, the
Client shall promptly give the Consultant the notice of such proceedings or claims,
and the Consultant may at its own expense and in the Client's name get conduct
such proceedings or claim and any negotiations for the settlement of any such
proceedings or claim. If the Consultant fails to notify the Client within twenty-eight
[28*] days after receipt of such notice that it intends to conduct any such
proceedings or claim, then the Client shall be free to conduct the same on its own
behalf. Unless the Consultant has so failed to notify the Client within the twenty-
eight [28*] day period, the Client shall make no admission that may be prejudicial to
the defense of any such proceedings or claim. The Client shall, at the Consultant's
request, afford all available assistance to the Consultant in conducting such
proceedings or claim and shall be reimbursed by the Consultant for all reasonable
expenses incurred in so doing.
The Client shall indemnify and hold harmless the Consultant and its employees,
officers, and Subcontractors from any and all losses, liabilities, and costs (including
losses, liabilities, and costs incurred in defending a claim alleging such a liability)
that the Consultant or its employees, officers, or Subcontractors may suffer as a
result of the death or personal injury of any person or loss of or damage to property
of the Client, that is caused by fire, explosion, or any other perils, in excess of the
amount recoverable from insurances procured under "Insurances" Clause 10.6 of
GCC, provided that such fire, explosion, or other perils were not caused by any
negligent act or failure of the Consultant.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
If any proceedings are brought or any claim is made against the Consultant that
might subject the Client to liability under Sub-clause10.5.4 of this clause GCC, the
Consultant shall promptly give the Client the notice of such proceedings or claims,
and the Client may at its own expense and in the Consultant’s, name conduct such
proceedings or claim and any negotiations for the settlement of any such
proceedings or claim. If the Client fails to notify the Consultant within twenty-eight
[28*] days after receipt of such notice that it intends to conduct any such
proceedings or claim, then the Consultant shall be free to conduct the same on its
own behalf. Unless the Client has so failed to notify the Consultant within the
twenty-eight [28*] days, the Consultant shall make no admission that may be
prejudicial to the defense of any such proceedings or claim. The Consultant shall, at
the Client's request, afford all available assistance to the Client in conducting such
proceedings or claim and shall be reimbursed by the Client for all reasonable
expenses incurred in so doing.
The party entitled to the benefit of an indemnity under this GCC Clause shall take all
reasonable measures to mitigate any loss or damage that has occurred. If the party
fails to take such measures, the other party's liabilities shall be correspondingly
Unless otherwise specified in the SCC.
10.6 Insurances:
Shall take out and maintain, and shall cause to takeout and maintain, at its (or
the 'Sub-consultants', as the case may be) own cost but on terms and conditions
approved by the Client, insurance against the risks, and for he coverage specified
in the SCC, and
At the Client's request, shall provide evidence to the Clients hawing that such
insurancehasbeentakenoutandmaintainedandthatthecurrentpremiumstherefore
have been paid. The Consultant shall ensure that such insurance is in place prior
to commencing the Services as stated in Clause GCC Clause11.1.2.
The Client shall be named as co-insured under all insurance policies taken out by the
Consultant pursuant to Sub-clause10.6.1 of this clause GCC, except for the Third-
Party Liability, and the Consultant's Subcontractors shall be named as co-insured
under all insurance policies taken out by the Consultant pursuant to Sub-clause
10.6.1 of this clause GCC. All insurers' rights of subrogation against such co-insured
for losses or claims arising out of the performance of the Contract shall be waived
under such policies.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
The Consultant shall deliver to the Client certificates of insurance (or copies of the
insurance policies) as evidence that the required policies are in full force and effect.
The Consultant shall ensure that, where applicable, its Subcontractor(s) shall take
out and maintain in effect adequate insurance policies for their personnel and
vehicles and for work executed by them under the Contract, unless such
Subcontractors are covered by the policies taken out by the Consultant.
IftheConsultantfailstotakeoutand/ormaintainineffecttheinsurancereferredtoinSub-
clause 10.6.1 of this clause GCC, the Client may take out and maintain in effect any
such insurance and may from time to time deduct from any amount due to the
Consultant under the Contract any premium that the Client shall have paid to the
insurer or may otherwise recover such amount as a debt due from the Consultant.
Unless otherwise provided in the Contract, the Consultant shall prepare and conduct
all and any claims made under the policies affected by it pursuant to this GCC Clause
and all monies payable by any insurers shall be paid to the Consultant. The Client
shall give to the Consultant all such reasonable assistance as may be required by the
Consultant in connection with any claim under the relevant insurance policies. With
respect to insurance claims in which the Client's interest is involved, the Consultant
shall not give any release or make any compromise with the insurer without the
prior written consent of the Client. With respect to insurance claims in which the
Consultant's interest is involved, the Client shall not give any release or make any
compromise with the insurer without the prior written consent of the Consultant.
10.7 Force Majeure
“Force Majeure” means any event or circumstance, or combination of events or
circumstances, that (a) is beyond the reasonable control of the affected Party; (b) was not
reasonably foreseeable as of the Effective Date; (c) could not have been prevented, avoided
or removed by the exercise of reasonable diligence and Good Industry Practice; and (d)
materially and adversely affects the ability of the affected Party to perform its obligations
under this Agreement. Subject to the foregoing, Force Majeure events shall include, but not
(i) acts of God, including earthquake, fire, lightning, flood, cyclone, epidemic, pandemic or
other natural physical disaster;
(ii) war (declared or undeclared), invasion, armed conflict, acts of foreign enemies, blockade,
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
embargo, riot, civil commotion, terrorism or sabotage;
(iii) nationwide or state‑wide strikes, lockouts or other industrial disputes not limited to the
employees of the affected Party;
(iv) expropriation, confiscation, requisition, nationalisation, or compulsory acquisition by
any Government Authority;
(v) any act of Government, court or regulatory authority (including change in law, orders,
restraints or injunctions) which directly prevents performance of material obligations, other
than as a result of breach or default by the affected Party.”
Force Majeure shall not include
(i) Any event which is caused by the negligence or intentional action of a Party or
such Party's Experts, Sub-consultants or agents or employees, nor
(ii) Any event which a diligent Party could reasonably have been expected to both
take into account at the time of the conclusion of this Contract, and avoid or
overcome in the carrying out of its obligations hereunder.
iii) failure of contractors, sub‑contractors, suppliers, or service providers of the affected Party
(except to the extent caused by a Force Majeure event affecting them);
iv) failure or breakdown of equipment or facilities arising from normal wear and tear or lack
of maintenance.
10.7.2 No Breach of Contract
Force Majeure shall not include insufficiency of funds or failure to make any
payment required hereunder. The failure of a Party to fulfill any of its obligations
hereunder shall not be considered to be a breach of, or default under, this Contract
insofar as such inability arises from an event of Force Majeure, provided that the
Party affected by such an event has taken all reasonable precautions, due care and
reasonable alternative measures, all with the objective of carrying out the terms and
conditions of this Contract.
10.7.3 Measures to be Taken
A Party affected by an event of Force Majeure shall continue to perform its
obligations under the Contract as far as is reasonably practical, and shall take all
reason-able measures to minimize the consequences of any event of Force Majeure.
APartyaffectedbyaneventofForceMajeureshallnotifytheotherPartyofsuch event as
soon as possible, and in any case not later than fourteen[14*]calendar days
following the occurrence of such event, providing evidence of the nature and cause
of such event, and shall similarly give written notice of the restoration of normal
conditions as soon as possible.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
Any period within which a Party shall, pursuant to this Contract, complete any
action or task, shall be extended for a period equal to the time during which such
Party was unable to perform such action as a result of Force Majeure.
During the period of their inability to perform the Services as a result of an event of
Force Majeure, the Consultant, upon instructions by the Client, shall either
(a) Continue with the Services to the extent reasonably possible, in which case the
Consultant shall continue to be paid under the terms of this Contract and be
reimbursed for additional costs reasonably and necessarily incurred.
InthecaseofdisagreementbetweenthePartiesastotheexistenceorextentofForce
Majeure, the matter shall be settled according to Clauses GCC Clause 9.5.
The party or parties affected by the event of Force Majeure shall use reasonable
efforts to mitigate the effect of the event of Force Majeure upon its or their
performance of the Contract and to fulfill its or their obligations under the Contract,
but without prejudice to either party's right to terminate the Contract under GCC
No delay or nonperformance by either party to this Contract caused by the
occurrence of any event of Force Majeure shall
(a) Constitute a default or breach of the Contract;
(b) Subject to GCC Clauses Clause11.1.3, and Clause11.1.4 give rise to any claim for
damages or additional cost or expense occasioned by the delay or non-
If, and to the extent that, such delay or non-performance is caused by the occurrence
of an event of Force Majeure.
If the performance of the Contract is substantially prevented, hindered, or delayed
for a single period of more than sixty [60*] days or an aggregate period of more than
one hundred and twenty [120*] days on account of one or more events of Force
Majeure during the time period covered by the Contract, the parties will attempt to
develop a mutually satisfactory solution, failing which, either party may terminate
the Contract by giving a notice to the other.*
*: Unless otherwise specified in the SCC
In the event of termination pursuant to GCC Clause 3.1.6, the rights and obligations
of the Client and the Consultant shall be as specified in GCC "Termination" Clause
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
Notwithstanding GCC Clause 11.1.5, Force Majeure shall not apply to any obligation
of the Client to make payments to the Consultant under this Contract.
11TERM, TERMINATION AND MODIFICATION OF
11.1.1 Effectiveness of contract
This Contract shall come into force and effect on the date (the "Effective Date") of
the Client's notice to the Consultant instructing the Consultant to begin carrying out
the Services. This notice shall confirm that the effectiveness conditions, if any, listed
in the SCC have been met.
11.1.2 Commencement of Services
The Consultant shall confirm availability of Key Experts and begin carrying out the
Services not later than the number of days after the Effective Date specified in the
The Consultant shall commence work within the period specified at Sub-clause
11.1.2 of this clause GCC, and the Consultant shall thereafter proceed with the work
in accordance with the time schedule specified in the Implementation Schedule in
the Requirements Section and any refinements made in the Agreed and Finalized
The Consultant shall adhere to the timelines in the Implementation Schedule in the
Requirements Section and any refinements made in the Agreed and Finalized
Project Plan, or within such extended time to which the Consultant shall be entitled
under GCC Clause 11.1.5(Extension of Time).
11.1.5 Extension of time
The time(s) specified in the Schedule of Implementation shall be extended if the
Consultant is delayed or impeded in the performance of any of its obligations under
the Contract by reason of any of the following
(a) AnyoccurrenceofForceMajeureasprovidedinGCCClause"ForceMajeure"10.7;
(b) Default of the Client; or
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
(c) Any other matter specifically mentioned in the Contract;
By such period as shall be fair and reasonable in all the circumstances and as shall
fairly reject the delay or impediment sustained by the Consultant.
Except where otherwise specifically provided in the Contract, the Consultant shall
submittotheProjectManageranoticeofaclaimforanextensionofthetime,together with
particulars of the event or circumstance justifying such extension as soon as
reasonably practicable after the commencement of such event or circumstance. As
soon as reasonably practicable after receipt of such notice and supporting
particulars of the claim, the Client and the Consultant shall agree upon the period of
such extension. In the event that the
ConsultantdoesnotaccepttheClient'sestimateofafairandreasonabletimeextension,the
Consultant shall be entitled to refer the matter under "Settlement of Disputes" of
GCC Clause 9.5.
The Consultant shall at all times use its reasonable efforts to minimize any delay in
the performance of its obligations under the Contract.
11.2 Termination
11.2.1 Expiration of contract
UnlessterminatedearlierpursuanttoGCCClause9.1hereof, this Contract shall expireat
the end of such time period after the Effective Date as specified in the SCC.
11.2.2 Termination by the Client
The Client may terminate this Contract in case of the occurrence of any of the events
specified in paragraphs 11.2.2(a) through 11.2.2(f) of this Clause. In such an
occurrence the Client shall give at least thirty [30*] calendar days' written notice of
termination to the Consultant in case of the events referred to in 11.2.2(a) through
11.2.2(d); at least sixty [60*] calendar days' written notice in case of the event
referred to in 11.2.2(e); and at least five [5*] calendar days' written notice in case of
the event referred to in 11.2.2(f)
(a) If the Consultant fails to remedy a failure in the performance of its obligations
hereunder, as specified in a notice of suspension pursuant to Clause GCC Clause
(b) If the Consultant becomes (or, if the Consultant consists of more than one entity,
if any of its members becomes) insolvent or bankrupt or enter into any
agreements with their creditors for relief of debt or take advantage of any law
for the benefit of debtors or go into liquidation or receivership whether
compulsory or voluntary; unless otherwise specified in the SCC.
(c) If, astheresultofForceMajeure,theConsultantisunabletoperformamaterialportion
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
of the Services for a period of not less than sixty [60*] calendar days;
(d) If the Client, in its sole discretion and for any reason whatsoever, decides to
terminate this Contract;
(e) If the Consultant fails to confirm availability of Key Experts as required in Clause
GCC Clause 11.1.
Sub-Clause: Furthermore, if the Client determines that the Consultant has engaged
in corrupt, fraudulent, collusive, coercive or obstructive practices, in competing for
or in executing the Contract, then the Client may, after giving fourteen [14*]
calendar days written notice to the Consultant, terminate the Consultant's
employment under the Contract. For the purposes of this Clause
(i) "Corrupt practice" is the offering, giving, receiving or soliciting, directly or
indirectly, of anything of value to influence improperly the actions of another
(ii) "Fraudulent practice" is any act or omission, including a misrepresentation,
that knowingly or recklessly misleads, or attempts to mislead, a party to obtain
a financial or other benefit or to avoid an obligation;
(iii) "Collusive practice" is an arrangement between two or more parties designed
to achieve an improper purpose, including to influence improperly the actions
of another party;
(iv) "Coercive practice" is impairing or harming, or threatening to impair or harm,
directly or indirectly, any party or the property of the party to influence
improperly the actions of a party;
(v) "obstructive practice" is (aa) deliberately destroying, falsifying, altering or
concealing of evidence material to the investigation or making false statements
to investigators in order to materially impede an investigation by the Trust
allegationsofacorrupt,fraudulent,coerciveorcollusivepractice;and/orthreatenin
g, harassing or intimidating any party to prevent it from disclosing its
knowledge of matters relevant to the investigation or from pursuing the
investigation; or (bb)acts intended to materially impede the exercise of the
Client's inspection and audit rights provided for under 13 Clause "Consultant's
Responsibilities" GCC.
(f) If the Client, in its sole discretion and for any reasons whatsoever, decides to
terminate this contract.
Unless otherwise specified in the SCC
11.2.3 Termination by the Consultant
The Consultant may terminate this Contract, by not less than thirty [30*] calendar
days' written notice to the Client, in case of the occurrence of any of the events
specified in paragraphs (a) through (d) of this Clause.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
(a) If the Client fails to pay any money due to the Consultant pursuant to this
Contract and not subject to dispute pursuant to Clauses GCC 1.5 within forty-five
[45*] calendar days after receiving written notice from the Consultant that such
payment is overdue.
(b) If, as the result of Force Majeure, the Consultant is unable to perform a material
portion of the Services for a period of not less than sixty [60*] calendar days.
(c) If the Client is in material breach of its obligations pursuant to this Contract and
has not remedied the same within forty- five [45*] days (or such longer period
as the Consultant may have subsequently approved in writing) following the
receipt by the Client of the Consultant's notice specifying such breach.
11.2.4 Termination of contract for failure to become effective
If this Contract has not become effective within such time period after the date of
Contract signature as specified in the SCC, either Party may, by not less than twenty
two [22*] days written notice to the other Party, declare this Contract to be null and
void, and in the event of such a declaration by either Party, neither Party shall have
any claim against the other Party with respect hereto.
11.2.5 Cessation of rights and obligations
Upon termination of this Contract pursuant to GCC Clause 11.2 or GCC Clause 11.2.2
hereof, or upon expiration of this Contract pursuant to Clause11.2.3, all rights and
obligations of the Parties hereunder shall cease, except
(i) Such rights and obligations as may have accrued on the date of termination or
(ii) TheobligationofconfidentialitysetforthinClauseGCC9.6,
(iii) The Consultant's obligation to permit inspection, copying and auditing of their
accounts and records set forth in Clause 13.1and Clause13.1.3 any right which a
Party may have under the Applicable Law.
11.2.6 Cessation of Services
Upon termination of this Contract by notice of either Party to the other pursuant to
Clauses 11.2.2 or GCC 11.2.3, the Consultant shall, immediately upon dispatch or
receipt of such notice, take all necessary steps to bring the Services to a close in a
prompt and orderly manner and shall make every reasonable effort to keep
expenditures for this purpose to a minimum. With respect to documents prepared
by the Consultant and equipment and materials furnished by the Client, the
Consultant shall proceed as provided, respectively, by Clauses GCC Clause13.1.7
Unless otherwise specified in the SCC
11.2.7 Payment upon Termination:
Upon termination of this Contract, the Client shall make no payment to the
Since the project is complex in nature it might be aborted anytime in-between.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
11.3 Modification
11.3.1 Permitted Modifications
In cases of substantial modifications or variations, the prior written consent of the
Authority's is required.
11.3.2 Introducing a Change
Client shall have the right to propose, and subsequently require, the key personal to
order the Consultant from time to time during the performance of the Contract to
make any change, modification, addition, or deletion to, in, or from the Service
(interchangeably called "Change"), provided that such Change falls within the
general scope of the work, does not constitute unrelated work, and is technically
practicable, taking into account the capability of the Consultant. Any change in the
team composition shall be within the condition of the contract and shall be done
with prior approval client.
The Consultant may from time to time during its performance of the Contract
propose to the Client (with a copy to the Project Manager) any Change that the
Consultant considers necessary or desirable to improve the quality or efficiency of
the Service. The Client may at its discretion approve or reject any Change proposed
by the Consultant.
Notwithstanding Sub-clause 11.3.2 and Sub-clause 11.3.3 of this clause GCC, no change
made necessary because of any default of the Consultant in the performance of its
obligations under the Contract shall be deemed to be a Change, and such change shall
not result in any adjustment of the Contract Price or the Time.
11.3.5 Assignment
NeithertheClientnortheConsultantshall,withouttheexpresspriorwritten consent of
the other, assign to any third party the Contract or any part thereof, or any right,
benefit, obligation, or interest therein or hereunder, except that the Consultant shall
be entitled to assign either absolutely or by way of charge any monies due and
payable to it or that may become due and payable to it under the Contract.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
The Consultant shall be deemed to have satisfied itself as to the correctness and sufficiency
of the Contract Price, which shall, except as otherwise provided for in the Contract, coverall
its obligations under the Contract.
12.2 Payment Terms
The Client shall pay to the Consultant as specified in1.1 Instruction to Bidder
The Contract Price shall be paid in Indian Rupees.
No payment made by the Client herein shall be deemed to constitute acceptance by
the Client of any deliverable.
Payments shall be made promptly by the Client, 60 days preferably at the earliest
after submission of a valid invoice by the Consultant.
12.2.4 Mode of Billing and payments
Billings and payments in respect of the Services shall be made as follows
(a) The Client shall pay the Consultant's invoices within sixty [60*] days after the
receipt by the Client of such itemized invoices with supporting documents.
Only such portion of an invoice that is not satisfactorily supported may be
withheld from payment. Should any discrepancy be found to exist between
actual payment and costs authorized to be incurred by the Consultant, the
Client may add or subtract the difference from any subsequent
payments.RMC will make payment as early as possible, however maximum
timeline for payment is 60 days.
(b) The Final Payment. Subject to SCC, the final payment under this Clause shall
be made only after three months from the completion certificate, Final
invoice identified as such, shall have been submitted by the Consultant and
approved as satisfactory by the Client. The Services shall be deemed
completed and finally accepted by the Client and the final report and final
invoice shall be deemed approved by the Client as satisfactory ninety[90*]
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
calendar days after receipt of the final report and final invoice by the Client
unless the Client, with in such ninety(90) calendar day period, gives written
notice to the Consultant specifying in detail deficiencies in the Services, the
final report or final invoice. The Consultant shall there upon promptly make
any necessary corrections, and thereafter the foregoing process shall be
repeated. Any amount that the Client has paid or has caused to be paid in
accordance with this Clause in excess of the amounts payable in accordance
with the provisions of this Contract shall be reimbursed by the Consultant to
the Client within thirty (30) days after receipt by the Consultant of notice
thereof. Any such claim by the Client for reimbursement must be made within
twelve (12) calendar months after receipt by the Client of a final report and a
final invoice approved by the Client in accordance with the above. Unless
otherwise specified in the SCC.
(c) Performance security is
(d) All payments under this Contract shall be made to the accounts of the
Consultant specified in the SCC.
(e) With the exception of the final payment under(b)above, payments do not
constitute acceptance of the Services nor relieve the Consultant of any
obligations hereunder.
12.2.5 Suspension
The Client may, by written notice of suspension to the Consultant, suspend all
payments to the Consultant hereunder if the Consultant fails to perform any of its
obligations under this Contract, including the carrying out of the Services, provided
that such notice of suspension.
(i) Shall specify the nature of the failure, and
(ii) Shall request the Consultant to remedy such failure within a period not exceeding
thirty(30)calendar days after receipt by the Consultant of such notice of suspension.
12.3 Securities
12.3.1 Issuance of Securities
The Consultant shall provide the securities specified below infavor of the Client at
the times and in the amount, manner, and form specified below.
12.3.2 Advance Payment Security–Not Applicable
12.3.3 Performance Security
(a) The Consultant shall, within 10 [ten] days of the notification of Contract award,
provide a performance security for the due performance of the Contract in the
amount, validity and currency as specified in the Instruction to bidder.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
(b) The security shall be a bank guarantee in the form provided in the Appendix-M,
or it shall be in fixed deposit receipt in the name of RMC. No any other form is
acceptable to the Client.
(c) The security shall automatically become null and void once all the obligations of
the Consultant under the Contract have been fulfilled, including, but not limited
to, any obligations during the Warranty Period and any extensions to the period.
The security shall be returned to the Consultant no later than twenty-eight (28)
days after its expiration.
(d) Upon Acceptance of the entire work, the security shall be reduced to the amount
specified in the SCC, on the date of such Acceptance, so that the reduced security
would only cover the remaining warranty obligations of the Consultant.
12.4 Taxes and Duties
The Consultant, Sub-consultants and Experts are responsible for meeting any and all
tax including GST and liabilities arising out of the Contract unless it is stated
otherwise in the SCC. As an exception to the above and as stated in the SCC, all local
identifiable indirect taxes (itemized and finalized at Contract negotiations) are
reimbursed to the Consultant or are paid by the Client on behalf of the Consultant.
If any tax exemptions, reductions, allowances, or privileges may be available to the
Consultant, the Client shall use its best efforts to enable the Consultant to benefit
from any such tax savings to the maximum allowable extent.
For the purpose of the Contract, it is agreed that the Contract Price Specified in
Article 2 (Contract Price and Terms of Payment) of the Contract Agreement is based
on the taxes, duties, levies, and charges prevailing at the date thirty (30) days prior
to the date of proposal submission(also called "Tax" in this GCC sub-Clause). If any
Tax rates are increased or decreased, a new Tax is introduced, an existing Tax is
abolished, or any change in interpretation or application of any Tax occurs in the
course of the performance of the Contract, which was or will be assessed on the
Consultant, its Subcontractors, or their employees in connection with performance
of the Contract, an equitable adjustment to the Contract Price shall be made to fully
take into account any such change by addition to or reduction from the Contract
Price, as the case may be.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
13RESPONSIBILITIES
13.1 Consultant’s Responsibilities
13.1.1 Standard of Performance
The Consultant shall perform the Services and carry out the Services with all due
diligence, efficiency and economy, in accordance with generally accepted
professional standards and practices, and shall observe sound management
practices, and employ appropriate technology and safe and effective equipment,
machinery, materials and methods. The Consultant shall always act, in respect of
any matter relating to this Contract or to the Services, as a faithful adviser to the
Client, and shall at all times support and safeguard the Client's legitimate interests
in any dealings with the third parties.
The Consultant shall perform the Services in accordance with the Contract and the
Applicable Law and shall take all practicable steps to ensure that any of its Experts
and Sub-consultants, comply with the Applicable Law.
The Client shall notify the Consultant in writing of relevant local customs, and the
Consultant shall, after such notification, respect such customs.
13.1.3 Consultant to affiliate not to engage in certain activities
The Consultant agrees that, during the term of this Contract and after its
termination, the Consultant and any entity affiliated with the Consultant, as well as
any Sub-consultants and any entity affiliated with such Sub-consultants, shall be
disqualified from providing goods, works or non-consulting services resulting from
or directly related to the Consultant's Services for the preparation or
implementation of the project, unless otherwise indicated in the SCC.
13.1.4 Prohibition of conflicting activities
The Consultant shall not engage, and shall cause its Experts as well as its Sub-
consultants not to engage, either directly or indirectly, in any business or
professional activities that would conflict with the activities assigned to them under
13.1.5 Accounting, Inspection and Auditing
The Consultant shall keep, and shall make all reasonable efforts to cause its Sub-
consultants to keep, accurate and systematic accounts and records in respect of the
Services in such form and detail as will clearly identify relevant time changes and
The Consultant shall permit and shall cause its Sub-consultants to permit, the
authorities and/or persons appointed by the authorities to inspect the Site and/or
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
all accounts and records relating to the performance of the Contract and the
submission of the Proposal to provide the Services, and to have such accounts and
records audited by auditors appointed by the authorities if requested by the
authorities. The Consultant's attention is drawn to GCC Clause 10.4 which provides,
inter alia, that acts intended to materially impede the exercise of the authority's
inspection and audit rights provided for under this GCCClause13.1 constitute a
prohibited practice subject to contract termination (as well as to a determination of
ineligibility under the authority's prevailing sanctions procedures.)
13.1.6 Maintaining of records and reports
Unless otherwise indicated in the SCC, all reports and relevant data and information
such as maps, diagrams, plans, databases, other documents and software,
supporting records or material compiled or prepared by the Consultant for the
Client in the course of the Services shall be confidential and become and remain the
absolute property of the Client. The Consultant shall, not later than upon
termination or expiration of this Contract, deliver all such documents to the Client,
together with a detailed inventory thereof. The Consultant may retain a copy of such
documents, data and/or software but shall not use the same for purposes unrelated
to this Contract without prior written approval of the Client.
If license agreements are necessary or appropriate between the Consultant and
third parties for purposes of development of the plans, drawings, specifications,
designs, databases, other documents and software, the Consultant shall obtain the
Client's prior written approval to such agreements, and the Client shall be entitled at
its discretion to require recovering the expenses related to the development of the
program(s) concerned. Other restrictions about the future use of these documents
and software, if any, shall be specified in the SCC.
13.1.7 Equipment and materials furnished by the Client
Equipment, vehicles and materials made available to the Consultant by the Client, or
purchased by the Consultant wholly or partly with funds provided by the Client,
shall be the property of the Client and shall be marked accordingly. Upon
termination or expiration of this Contract, the Consultant shall make available to the
Client an inventory of such equipment, vehicles and materials and shall dispose of
such equipment, vehicles and materials in accordance with the Client's instructions.
While in possession of such equipment, vehicles and materials, the Consultant,
unless otherwise instructed by the Client in writing, shall insure them at the
expense of the Client in an amount equal to their full replacement value.
Any equipment or materials brought by the Consultant or its Experts into the
Client's country for the use either for the project or personal use shall remain the
property of the Consultant or the Experts concerned, as applicable.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
Other Consultant responsibilities, if any, are as stated in the SCC.
13.2 Client’s Responsibilities
Unless otherwise specified in the SCC, the Client shall use its best efforts to,
Assist the Consultant with obtaining work permits and such other documents as
shall be necessary to enable the Consultant to perform the Services.
Assist the Consultant with promptly obtaining, for the Experts and, if appropriate,
their eligible dependents, all necessary entry and exit visas, residence permits,
exchange permits and any other documents required for their stay in the Client's
country while carrying out the Services under the Contract.
Facilitate prompt clearance through customs of any property required for the
Services and of the personal effects of the Experts and their eligible dependents.
Issue to officials, agents and representatives of the Government all such instructions
and information as may be necessary or appropriate for the prompt and effective
implementation of the Services.
Assist the Consultant for the Services with obtaining exemption from any
requirement to register or obtain any permit to practice their profession or to
establish themselves either individually or as a corporate entity in the Client's
country according to the applicable law in the Client's country.
Assist the Consultant obtaining the privilege, pursuant to the applicable law in the
Client's country, of bringing into the Client's country reasonable amounts of foreign
currency for the purposes of the Services or for the personal use of the Experts and
of withdrawing any such amounts as may be earned there in by the Experts in the
execution of the Services.
13.2.7 Access to facilities
The Client warrants that the Consultant shall have, free of charge, unimpeded access
to the project site in respect of which access is required for the performance of the
Services. The Client will be responsible for any damage to the project site or any
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
property thereon resulting from such access and will indemnify the Consultant and
each of the experts in respect of liability for any such damage, unless such damage is
caused by the willful default or negligence of the Consultant.
13.2.8 Counter personnel
The Client shall make available to the Consultant free of charge such professional
and support counterpart personnel, to be nominated by the Client with the
Consultant's advice, if specified in SCC.
If counterpart personnel are not provided by the Client to the Consultant as and
when specified in Appendix J, the Client and the Consultant shall agree on (i) how
the affected part of the Services shall be carried out, and(ii) the additional payments,
if any, to be made by the Client to the Consultant as a result there of pursuant to GCC
clause 12.2.3 as specified.
Professional and support counterpart personnel, excluding Client's liaison
personnel, shall work under the exclusive direction of the Consultant. If any member
of the counterpart personnel fails to perform adequately any work assigned to such
member by the Consultant that is consistent with the position occupied by such
member, the Consultant may request the replacement of such member, and the
Client shall not unreasonably refuse to act upon such request.
13.2.9 Services, facilities and Property of the Client
The Client shall make available to the Consultant and the Experts, for the purposes
of the Services and free of any charge, the services, facilities and property described
in the Terms of Reference at the times and in the manner specified in said Appendix
In case that such services, facilities and property shall not be made available to the
Consultant as and when specified in Appendix 1, the Parties shall agree on
(i) Anytime extension that it may be appropriate to grant to the Consultant for
the performance of the Services,
(ii) ThemannerinwhichtheConsultantshallprocureanysuchservices,facilitiesand
property from other sources, and
(iii) The additional payments, if any, to be made to the Consultant as a result
thereof pursuant to Clause GCC
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
14SUBJECT OF CONTRACT
14.1 Project Plan
In close cooperation with the Client and based on the Preliminary Project Plan
included in the Consultant's proposal/bid, the Consultant shall develop a Project
Plan encompassing the activities specified in the Contract. The contents of the
Project Plan shall be as specified in the SCC and/or Requirements.
The Progress and other reports specified in the SCC shall be prepared by the
Consultant and submitted to the Client in the format and frequency specified in the
The Consultant shall formally present to the Client the Project Plan in accordance
with the procedure specified in the SCC.
The Consultant shall undertake to deliver in accordance with the Agreed and
Finalized Project Plan and the Contract.
14.2 Documents Approval
14.2.1 Instructions and Specifications
The Consultant shall execute the work and the implementation activities necessary
for successful performance of the work in compliance with the provisions of the
Contract or, where not so specified, in accordance with good industry practice.
14.2.2 Codes and Standards
Wherever references are made in the Contract to codes and standards in accordance
with which the Contract shall be executed, the edition or the revised version of such
codes and standards current at the date of signing the Contract shall apply unless
otherwise specified in the SCC. During Contract execution, any changes in such
codes and standards shall be applied after approval by the Client.
14.2.3 Approval/Review of Documents by the Project Manager
(a) The Consultant shall prepare and furnish to the Project Manager the
documents as specified in the SCC for the Project Manager's approval or
review. Any part of the Service covered by or related to the documents to be
approved by the Project Manager shall be executed only after the Project
Manager's approval of these documents. Sub-clause 14.2.3(b) onwards of this
clause GCC shall apply to those documents requiring the Project Manager's
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
approval, but not to those furnished to the Project Manager for its review only.
(b) Within fourteen [14*] days after receipt by the Project Manager of any
document requiring the Project Manager's approval in accordance with Sub-
clause 14.2.3(a) of this clause GCC, the Project Manager shall either return one
copy of the document to the Consultant with its approval endorsed on the
document or shall notify the Consultant in writing of its disapproval of the
document and the reasons for disapproval and the modifications that the
Project Manager proposes. If the Project Manager fails to take such action
within the fourteen [14*] days, then the document shall be deemed to have
been approved by the Project Manager.
(c) The Project Manager shall not disapprove any document except on the
grounds that the document does not comply with some specified provision of
the Contract or that it is contrary to good industry practice.
(d) If the Project Manager disapproves the document, the Consultant shall modify
the document and resubmit it for the Project Manager's approval in
accordance with Sub-clause 14.2.3(b) of this clause GCC. If the Project
Manager approves the document subject to modification(s), the Consultant
shall make the required modification(s), and the document shall then be
deemed to have been approved, subject to Sub-clause 14.2.3(e) of this clause
GCC. The procedure set out in Sub- clause 14.2.3(a) through Sub-clause
14.2.3(d) of this clause GCC shall be repeated, as appropriate, until the Project
Manager approves such documents.
(e) If any dispute occurs between the Client and the Consultant in connection with
or arising out of the disapproval by the Project Manager of any document
and/or any modification(s) to a document that cannot be settled between the
parties within a reasonable period, then, the Project Manager shall give
instructions as to whether and if so, how, performance of the Contract is to
proceed. The Consultant shall proceed with the Contract in accordance with
the Project Manager's instructions, provided that after the dispute resolution,
the Term of contract shall be extended accordingly.
(f) The Project Manager's approval, with or without modification of the document
furnished by the Consultant, shall not relieve the Consultant of any
responsibility or liability imposed upon it by any provisions of the Contract
except to the extent that any subsequent failure results from modifications
required by the Project Manager or inaccurate information furnished in
writing to the Consultant by or on behalf of the Client.
(g) The Consultant shall not depart from any approved document unless the
Consultant has first submitted to the Project Manager an amended document
and obtained the Project Manager's approval of the document, pursuant to the
provisions of this Clause 14.2.3 of this clause GCC.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
14.2.4 Inspections
The Client or its representative shall have the right to inspect any of the ongoing
works/activities at any location.
The Client shall issue an acceptance certificate against each successful deliverable as
per the implementation schedule and as further detailed in the SCC.
14.3.1 Description of personnel
The title, agreed job description, minimum qualification and time-input estimates to
carry out the Services of each of the Consultant's Key Experts are described in
If required to comply with the provisions, adjustments with respect to the estimated
time-input of Key Experts set forth in Appendix L may be made by the Consultant by
a written notice to the Client, provided
(i) Thatsuchadjustmentsshallnotaltertheoriginaltime-
inputestimatesforanyindividual by more than 10 percentage or one week,
whichever is larger; and
(ii) That the aggregate of such adjustments shall not cause payments under this
Contract to exceed the ceilings set forth.
If additional work is required beyond the scope of the Services specified in
Appendix J, the estimated time-input for the Key Experts may be increased by
agreement in writing between the Client and the Consultant. In case where
payments under this Contract exceed the ceilings set forth, the Parties shall sign a
Contract amendment.
14.3.2 Replacement of personnel
Except as the Client may otherwise agree in writing, no changes shall be made in the
Key Personnel. Notwithstanding the above, the substitution of Key Personnel during
Contract execution may be considered only based on the Consultant's written
request and due to circumstances outside the reasonable control of the Consultant,
including but not limited to death or medical incapacity. In such case, the Consultant
shall forthwith provide, as a replacement, a person of equivalent or better
qualifications and experience, and at the same rate of remuneration. If the
Consultant is replacing the Key Personnel without approval of RMC, then the
following exclusive penalty will be applied.
For Project Manager/Team Leader–Rs.10,000/-(Rupees Ten Thousand) per
PPP Specialist–Rs.5000/-(Rupees Five Thousand)per day.
Urban Designer–Rs.5000/-(Rupees Three Thousand)per day.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
Financial Expert–Rs.5000/-(Rupees Two Thousand)per day.
Legal Expert–Rs.5000/-(Rupees Two Thousand)per day
14.3.3 Approval of personnel
If during execution of the Contract, additional Key Personnel are required to carry
out the Services, the Consultant shall submit to the Client for review and approval a
copy of their Curricula Vitae (CVs). If the Client does not object in writing (stating
the reasons for the objection) within twenty-two [22*] days from the date of receipt
of such CVs, such additional Key Experts shall be deemed to have been approved by
TherateofremunerationpayabletosuchnewadditionalKeyExpertsshallbebasedonthe
rates for other Key Experts position which require similar qualifications and
Unless otherwise specified in the SCC
14.3.4 Removal and/or Replacement of personnel
(a) Except as the Client may otherwise agree, no changes shall be made in the key
personnel. If, for any reason beyond the reasonable control of the Consultant it
becomes necessary to replace any of the personnel, the Consultant shall
forthwith provide as a replacement a person of equivalent or better
qualifications.
(i) Finds that any of the personnel has committed serious misconduct or has
been charged with having committed a criminal action, or
(ii) Has reasonable cause to be dissatisfied with the performance of any of the
personnel, then the Consultant shall, at the Client's written request
specifying the gourds therefore, forthwith provide as a replacement a
person with qualification and experience acceptable to the Client.
(c) Any of the personnel provided as a replacement under sub-clauses (a) and
(b)above, the rate of remuneration applicable to such person, shall be subject
to the prior written approval by the Client except as the Client may otherwise
(d) Except as the Client may otherwise agree,
(i) The Consultant shall bear all additional travel and other costs arising out of
or incidental to any removal and/or replacement, and
(ii) The remuneration to be paid for any of the Experts provided as a
replacement shall not exceed the remuneration which would have been
payable to the Experts replaced or removed.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
14.3.5 Working Hours, Overtime, Leave etc.
Working hours and holidays for Experts are set forth in Appendix L. To account for
travel time to/from the Client's country, experts carrying out Services inside the
Client's country shall be deemed to have commenced or finished work in respect of
the Services such number of days before their arrival in, or after their departure
from, the Client's country as is specified in Appendix L. The Experts shall not be
entitled to be paid for overtime nor to take paid sick leave or vacation leave except
as specified in Appendix L and the Consultant's remuneration shall be deemed to
cover these items.
Any taking of leave by Key Experts shall be subject to the prior approval by the
Consultant who shall ensure that absence for leave purposes will not delay the
progress and or impact adequate supervision of the Services.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
15BID DATA SHEET
Title: RFP for Engagement of Consultant Cum
Transaction Advisor for Development of Rajkot
Convention & Exhibition Centre Based on PPP
Model, Atal Smart City – Rajkot
Identification Number: RMC/JNNURM/WZ/25-26/2
Brief Description of Services: RFP for Engagement of Consultant Cum
Transaction Advisor for Development of Rajkot
Convention & Exhibition Centre Based on PPP
Model, Atal Smart City – Rajkot
Resulting Contract: As given in "Chapter 9".
15.1 Milestone dates
:: Milestone dates of e-Tendering ::
1 Downloading of e – Tender documents
Pre-bid Meeting at RMC West Zone, JnNurm Cell,
2 "Shri HariSinhji Gohil Bhawan”, Behind Big Bazaar, 16-01-2026 at 11:00 Hrs.
150 Ring Road, Rajkot - 360
3 Last date for the online submission of e - Tender 27-01-2026 up to 18:00 Hrs.
Submission of EMD, Tender fee and other
documents by Regd. AD / Speed Post only.
5 Opening of Online Primary (Technical) Bid 02-02-2026 up to 11:00 Hrs.
6 Presentation 04-02-2026 at 11:00 Hrs.
7 Qualified List for Financial Bid Opening 06-02-2026 at 14:00 Hrs.
Opening of Online Commercial Bid (Price Bid)
technically qualified bidders only
9 Bid Validity 120 Days
For further particulars, visit us on www.rmc.nprocure.com
The RFP would be available at the e-procurement platform:
https://rmc.nprocure.comany subsequent notifications, changes and amendments
in the assignment/documents would be posted only on the website.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
15.2 Time period for completion of the project
Sr Name of Work Timeline (Weeks)
1 Inception Report T+4
2 Site Analysis & Demand Assessment T+6
3 Draft report T+7
4 Final report & DPR T+9
5 Developer Handbook T+14
6 Bid Documents T+18
Note: If timeline shown in above table is not met than 0.1 % per day up to 10%
shall be panelized of fees decided as success amount.
15.3 Extension of time period: N.A.
15.4 Authority's address:
Rajkot Municipal Corporation.
Shri Harisinhji Gohil Zonal Office
West Zone, B/H. Big Bazaar,
150 Feet Ring Road,
Rajkot - 360 005 (Gujarat)
Website: www.rmc.gov.in
15.5 e- Procurement website:
(Gujarat):https://rmc.nprocure.com
15.6 Cost of the bidding documents:
INR 23,500 (Indian Rupees Twenty Three Thousand and Five Hundred Rupees
All bidders must submit tender fee in person as above (after providing the online
details of the same), submit at the above mentioned address in form of Demand Draft
in favor of "Rajkot Municipal Corporation – RMC", payable at Rajkot, from any
Nationalized/Scheduled Bank (except Co-operative Bank) in India
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
Form T1: Letter of BID:-
(On Bidder's letter head)
Having examined the bidding documents, including Addenda, the receipt of which is hereby
acknowledged, we, the undersigned, offer to [specify scope of the contract] under the
above-named Contract in full conformity with the said bidding documents for the sum
specified in financial bid form or such other sums as may be determined in accordance with
the terms and conditions of the Contract. The above amounts are in accordance with the
We undertake, if our bid is accepted, to commence performance and to achieve
completion within the respective times stated in the bidding documents.
If our bid is accepted, we undertake to provide an advance payment security and a
performance security in the form and amounts and within the times specified in the
bidding documents.
We agree to abide by this bid for a period of [ specify number ] days from the date fixed
for submission of bids as stipulated in the bidding documents, and it shall remain binding
upon us and may be accepted by you at any time before the expiration of that period.
Until a formal contract is prepared and executed between us, this bid, which consists of
the letter and Attachments 1 through [ ] hereto, together with your written acceptance
thereof and your notification of award, shall constitute a binding contract between us.
We understand that you are not bound to accept the lowest, or any bid you may receive.
In the capacity of
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
Duly authorized to sign this bid for and on behalf of
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
Form T2: Bid Security:-
Bank Demand Draft/Bank Guarantee(having validity of 120 days) for Bid Security
Bank Demand Draft/Bank Guarantee (having validity of 120 days) for Bid Security
Form of Bank Guarantee (Earnest Money Deposit)
Whereas M/s…………………………………………………………….(Hereunder called the consultants)
Is desirous and prepared to tender for work in accordance with terms and conditions of
Bank, agree to give the consultants a Guarantee for the Earnest Money Deposit.
I .Therefore, we here by affirm that we are Guarantors on behalf of the consultants upto a
total of Rupees……………………………………………………………………(i.e. Rs.
we undertake to pay Rajkot Municipal Corporation (RMC) upon their first written demand
and without demur, without delay and without necessity of previous notice of individual or
administrative procedure and without necessity to prove the bank the defects or short
coming or debit of the Consultant any sum within the limit of
2.We further agree that the guarantee here in contained shall remain in full and effect
during the period that would be taken for the acceptance of tender. However, unless a
demand or claim under this guarantee is made only in writing on or
before the………………………………………………………………… We shall be discharged from all
liabilities under the guarantee thereafter.
We under-take not to revoke the guarantee during its currency except with the previous
consent of the City Engineer, Rajkot Municipal Corporation, in writing.
We lastly undertake not to revoke the guarantee for any change in constitution of the
consultants or the Bank.
Signature and Seal of Guarantor
Signature of consultants
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
Form T3: Power of Attorney:-
Power of Attorney for signing of Bid Know all men by these presents, we, (name of the firm and
address of the registered office) do hereby irrevocably constitute, nominate, appoint and authorize
Mr. /Ms. (Name), son/daughter/wife of. . . . . . . . …….......and presently residing at . . . . . . . . . , who is
presently employed with us and holding the position of . . . . . . . . . . . . . , as our true and lawful
attorney (hereinafter referred to as the "Attorney") to do in our name and on our behalf, all such
acts, deeds and things as are necessary or required in connection with or incidental to submission
of our bid for Name of Bid [insert: Name of Bid from Bid Data Sheet] proposed by (the "Authority")
including but not limited to signing and submission of all applications, bids and other documents
and writings, participate in bidders' and other conferences and providing information / responses
to the Authority, representing us in all matters before the Authority, signing and execution of all
contracts including the Agreement and undertakings consequent to acceptance of our bid, and
generally dealing with the Authority in all matters in connection with or relating to or arising out of
our bid for the said Scheme and/or upon award thereof to us and/or till the entering into of the
Agreement with the Authority.
AND we hereby agree to ratify and confirm all acts, deeds and things done or caused to be done by
our said Attorney pursuant to and in exercise of the powers conferred by this Power of Attorney
and that all acts, deeds and things done by our said Attorney in exercise of the powers hereby
conferred shall and shall always be deemed to have been done by us.
IN WITNESS WHEREOF WE………. . . THE ABOVE NAMED PRINCIPAL HAVE EXECUTED THIS
POWER OF ATTORNEY ON THIS . . . . . . . . . . . . . . .
(Signature, name, designation and address)
(Signature, name, designation and address of the Attorney)
The mode of execution of the Power of Attorney should be in accordance with the procedure, if any,
laid down by the applicable law and the charter documents of the executant(s) and when it is so
required, the same should be under common seal affixed in accordance with the required
The Power of Attorney should be executed on a non-judicial stamp paper of Rs. 300 (three
Hundred) and duly notarized by a notary public.
Wherever required, the Bidder should submit for verification the extract of the charter documents
and documents such as a board or shareholders resolution/ power of attorney in favor of the
person executing this Power of Attorney for the delegation of power here under on behalf of the
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
To be submitted on Non-Judicial Stamp paper of Rs. 300.00duly signed by authorized
Notary Signed by an authorized PERSON of the Firm/agency
1. I/we undersigned, do here by certify that all the statements made in the required
attachments are true and correct.
2. The under signed also here by certifies that neither our firm/agency
M/s………………………………… nor any of its constitute partners have abandoned any
work or any contract awarded to us for such works have been rescinded or
neither Black listed nor Debarred from any Govt. Semi Government Any
Institutional firm or private companies, during last Five years prior to the date
of this application.
3. The undersigned here by authorized(s) and request(s) any bank, person, firm or
Authority to furnish pertinent information deemed necessary and request by the
Department to verify this statement or regarding my(our) competence and
general reputation.
4. The under signed understands and agrees that, further qualifying information
may be requested, and agrees to furnish any such information at the request of
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
To be submitted on Non-Judicial Stamp paper of Rs. 300.00 duly signed by authorized
Notary Signed by an authorized PERSON of the Firm/agency
1. I/we agree that, the decision of the Rajkot Municipal Corporation for selection of
applicants will be final and binding to me/us.
2. All the information and data furnished herewith correct to my/our best of
3. I/we agree that, we have no objection, if inquiries are made about our works, its
related areas and any other inquiry regarding all details, projects and works
listed by us in the post qualification documents at any stage
4. I/we undersigned on behalf of our firm M/s…………………………………………. hereby
given undertaking that I/we am/are jointly and severally responsible to meet the
liabilities over and above the business of the firm and make good the above
financial loss sustained by the Authority as a result of my/our abandoning the
work entrusted to me/us/this firm.
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
Qualification and Experience and Employment status of all key personal who are
proposed for Administrator &execution of the Contract.
a Name of the Applicant
b Address of the Registered Office
e Email address
g Web-site, if any
2 Please furnish office address.
b Contact Phone No
a Year of establishment (enclose
Documentary evidence):
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
b No. of years of experience in
the: Relevant field (Minimum
experience Required is as per
ITB-Key Experts in relevant
4 Type of the Organization
(Whether: Proprietorship,
Partnership, Private Ltd, Co-
operative body etc)
5 Name of the Proprietor/Partners/Directors of the Applicant with Addresses
a Details of Registration–
Whether: Partnership firm,
b Name of Registering Authority,
Date& Registration Number
7 Name & Address of Banker
8 Weather an assessment of
Income Tax. If: So, mention
Permanent Account No.(Enclose
document evidence)
9 Please mention Service Tax
Registration (Encl.
Documentary evidence)
10. Furnish details of consultants/specialist whose
Rajkot Municipal Corporation – RMC
RFP for Engagement of Consultant Cum Transaction Advisor for Development of Rajkot Convention &
Exhibition Centre Based on PPP Model, Atal Smart City – Rajkot
Services are generally availed of by the applicant
1 Project Management
2 PPP Consultant
3 Urban Designing Consultant
4 Financial Expert
11. Furnish details of
A. Office infrastructure at main Office
1 Carpet area of Office
2 No. of Architects
3 No. of Engineers
4 No. of Interior Designer
5 No. of legal expert
B. If the main office is not located in Rajkot, Please Furnish details of office
infrastructure in Rajkot
1 Carpet area of Office (Sq.m)
2 No. of Urban Planner
3 No. of Engineers
4 No. of PPP expert
5 No. of other expert
(Provide details of Each Expert)
Rajkot Municipal Corporation – RMC
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2nd attempt final tender for convention centre consaltantcy.pdf
RFP FOR CONVENTION CENTRE _CORRIGENDUM_AMENDMENT_1.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .