Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.5 LAdmitted-Fee/PreQual/Technical/Finance KHEDA BARI SONAMURA DIST SEPAHIJALA TRIPURA PIN 799131 | SEPAHIJALA | TRIPURA | 799131 | -0.11% | ₹13.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹13.5 L
EMD Value
₹26,972
Closing Date
5 Aug 2026, 3:00 pmClosed
The EE, MCD, PWD(B),ILS Road, Agartala
O/O The EE, MCD, PWD(B),ILS Road, Agartala
Repairs and maintenance of non-residential Government Office building (Medical College Sub-Division I) during the year 2026-27/ SH Brick work, tiles work, Plastering work, Sanitary fittings etc
2026_CEPWD_75041_1
43/EE/MCD/PWD(B)/2026-27
Open Tender
Civil Works - Bridges
Percentage
90 days
AGMC and GBP Hospital, Agartala
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹26,972
5 Aug 2026
29 Jul 2026
5 Aug 2026
29 Jul 2026
5 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level andremoval of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 100 | sqm | 9.4 | ₹940 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.
-All kinds of soil | 15 | cum | 179.9 | ₹2,698.5 |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 6 | cum | 1,177.3 | ₹7,063.8 |
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level. | |||||
| 4.1 | i)1 : 3 : 6 ( 1 cement : 3 fine sand : 6 graded well burnt brick aggregate of 40 mm nominal size) | - | cum | 9,295.7 | - |
| 4.2 | ii) 1 : 2 : 4 ( 1 cement : 2 fine sand : 4 graded well burnt brick aggregate of 20 mm nominal size) | 4 | Sqm | 10,742.6 | ₹42,970.4 |
| 5 | First class brick work in foundation and plinth including cost of all materials as required complete:-
In cement mortar 1:3 ( 1 cement : 3 fine sand ). | 20 | cum | 10,175 | ₹2,03,500 |
| 6 | Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:-
In cement mortar 1:3 ( 1 cement : 3 fine sand ). | - | sqm | 1,572 | - |
| 7 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or
more | 20 | Kg | 103.9 | ₹2,078 |
| 8 | Providing and laying in position cement concrete of
specified grade excluding the cost of centring and
shuttering -
-All work upto plinth level:
1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone
aggregate 20 mm nominal size) | 7 | cum | 11,735.9 | ₹82,151.3 |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
DNIT.pdf
Tender Documents • 2.99 MB
int.PDF
Additional Documents • 0.20 MB
BOQ_76395.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .