Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.8 LAccepted-AOC | 1 | Accepted-AOC Single bid sanctioned |
Tender Value
₹4.5 L
EMD Value
₹11,200
Closing Date
16 Dec 2019, 5:00 pmClosed
Harikrishnan K.P
Executive Engineer, Irrigation-Mechanical Division, Malampuzha
CPP-KKPS- Mechanical works - Repairs and Renovation of shutters of various branch canals
2019_Irrig_323353_1
33/EE/MECH/MPZA/2019-20
Open Tender
Repair and Maintenance Works
Item Rate
120 days
Kunnamkattupathi
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
Yes
online
₹11,200
Yes
12 Mar 2020
21 Nov 2019
20 Dec 2019
21 Nov 2019
16 Dec 2019
21 Nov 2019
21 Nov 2019 - 16 Dec 2019
Amount
Maintenance of Canal Shutters
od38722/2019_2020/MH : Dismantling, lifting the shutter from the groove for painting after dismantling the stool screw rod and hoisting mechanism, stacking these items at convenient place and handed over the scrap materials to departmental officer at site,. including cost of all materials, labour charges, hire charges, energy charges, conveyance, all leads and lifts etc. complete
85.101 : Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges
85.102 : Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges
85.107 : Supply of MS round bar including cost of conveyance charges
od38906/2019_2020/MH : FABRICATION OF STRUCTURAL STEEL CANAL GATE AND ACCESSORIES as per approved specifications and directions of departmental officer at site including cost of labour ,machinery , incidental and handling charges etc complete but excluding cost of material which already supplied.
od38889/2019_2020/MH : FABRICATION OF HOISTING BRIDGE UNIT in Structural Steel confirming to IS2062 as per approved specifications and directions of departmental officer at site including cost of labour ,machinery , incidental and handling charges etc complete but excluding cost of material which already supplied.(FOR CANAL GATES - )
od38882/2019_2020/MH : Drilling and Fastening with Expansion bolt W/Nut M24x150mm length in concrete including conveyance and labor charges complete.
od38888/2019_2020/MH : Providing of WORM & PINION having a lifting speed of around 5cm/min for 24 RPM of hand operation including cost of all materials, labour, hire charges and conveyance (Canal Shutters)
od38907/2019_2020/MH : OVERHAULING OF EXISTING WORM AND PINION including cost of all materials,labour,hire charges, energy charges,conveyance and all leads and lifts for CANAL SHUTTER.
od38909/2019_2020/MH : Overhauling and resetting of base and Nut assembly including cost of all materials, labour charges,hire charges, energy charges, conveyance, all leads and lifts (Canal Shutter)
od38890/2019_2020/MH : PROVIDING BASE AND NUT arrangement for hoisting Mechanism including cost of all materials labour hire charges of machinery, industrial charges etc complete.
od38892/2019_2020/MH : FABRICATION OF 50mm THREADED SCREW ROD with EN-8 shaft including cost of all materials, hire charges ,industrial charges and labour charges etc complete.
od38883/2019_2020/MH : Cost of supplying and fixing of Screw rod LOCKING ARRANGEMENT including cost of materials,labour and conveyance complete.
od38884/2019_2020/MH : Hire Charges of Diesel Generator set at site (Maintenance of Canal Shutters)
85.114 : Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site
85.115 : Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site
od38723/2019_2020/MH : Re-Conditioning of existing EN-8 Screw rod including cost of all materials, labour charges, hire charges, energy charges, conveyance, all leads and lifts etc. complete.
4.1.2 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size)
od38887/2019_2020/MH : Erection and trial run for the Canal Shutters, Hoisting assembly , Screw rod including cost of materails, labour, conveyance etc complete
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_446986.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .