| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹8.0 LAccepted-Finance V P O KOSRI TEHSIL JAISINGHPUR DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | ₹8.0 L | L-1 | Accepted-Finance Found Lowest one |
| 2 | L-2₹8.1 LRejected-Finance NOT AVAILABLE | ₹8.1 L | L-2 | Rejected-Finance High rate qouted |
| 3 | L-3₹9.0 LRejected-Finance DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 176001 | ₹9.0 L | L-3 | Rejected-Finance High rate qouted |
| 4 | Rejected-Technical HIMACHAL PRADESH | - | - | Rejected-Technical Not Eligible |
| Sl No | Description | Qty | Unit | Ankit L2 | JITENDER RANA L1 | Sanjay Kumar L3 |
|---|---|---|---|---|---|---|
| 1.00Excavation in foundation trenches etc. in earth work in all kinds of soil such as pick work,jumper work,blasting in soft and hard rock and chiselling work including saturated soil slushy soil and under floor upto all depth and stacking the excavated soil not more than 3 metre clear from the edge of excavation and then returning the stacked soil in 15 centimetre (Fifteen centimetre) layer when required into plinth sides of foundation etc.consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer-in-charge. | ||||||
| 2.00 | a) Pick Work 15 % | 18.41 | Cubic metre | 180 ₹3,313.80 | 190 ₹3,497.90 | 250 ₹4,602.50 |
| 3.00 | b) Jumper Work 35 % | 33.14 | Cubic metre | 550 ₹18,227 | 260 ₹8,616.40 | 320 ₹10,604.80 |
| 4.00 | c) Chiseling work where blasting is prohibited in hard rock 50 % | 22.09 | Cubic metre | 850 ₹18,776.50 | 860 ₹18,997.40 | 1,170 ₹25,845.30 |
| 5.00 | Providing and laying cement concrete 1:4:8 (One cement is to four sand is to eight graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-charge. | 4.97 | Cubic metre | 6,200 ₹30,814 | 5,500 ₹27,335 | 5,694 ₹28,299.18 |
| 6.00Providing form work with steel plates 3.15 milimetre thick welded with angle iron in frame 30x30x5 milimetre so as to give a fair finish including centring,shuttering,strutting and propping etc.with wooden battens ballies,height of propping and centring below supporting floor two ceiling not exceeding 4 metre and removal of the same for in-situ-reinforced concrete and plain concrete work in:- | ||||||
| 7.00 | a) Vertical surfaces such as walls(any thickness)partitions walls and the like including attached pillasters,buttreses plinth string courses and the like within all leads and lifts as per the direction of Engineer-in-charge. | 14.74 | Square metre | 120 ₹1,768.80 | 70 ₹1,031.80 | 345 ₹5,085.30 |
| 8.00 | b) Edges of slab and breaks in floor and walls under 20 centimetre in wide within all leads and lifts as per the direction Engineer-in-charge. | 27.2 | Running metre | 40 ₹1,088 | 36 ₹979.20 | 120 ₹3,264 |
| 9.00Providing and laying cement concrete 1:2:4(One cement is to two sand is to four graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:- | ||||||
| 10.00 | a) Foundation,footings bases of column and the like mass concrete within all leads and lifts as per the direction of Engineer-in-charge. | 6.2 | Cubic metre | 7,500 ₹46,500 | 7,500 ₹46,500 | 7,757 ₹48,093.40 |
Tender Value
₹10.0 L
EMD Value
₹20,040
Closing Date
28 Jan 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
JAL SHAKTI DIVISION PALAMPUR
Construction of Check Dam in Chor Nallah
2026_HPIPH_126221_1
HP IPH 10267-10312 DATED 19.01.2026
Open Tender
Civil Works
90 days
PALAMPUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
EXECUTIVE ENGINEER
₹20,040
26 Feb 2026
19 Jan 2026
29 Jan 2026
19 Jan 2026
28 Jan 2026
19 Jan 2026
a) Pick Work 15 %
b) Jumper Work 35 %
c) Chiseling work where blasting is prohibited in hard rock 50 %
Providing and laying cement concrete 1:4:8 (One cement is to four sand is to eight graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-charge.
a) Vertical surfaces such as walls(any thickness)partitions walls and the like including attached pillasters,buttreses plinth string courses and the like within all leads and lifts as per the direction of Engineer-in-charge.
b) Edges of slab and breaks in floor and walls under 20 centimetre in wide within all leads and lifts as per the direction Engineer-in-charge.
a) Foundation,footings bases of column and the like mass concrete within all leads and lifts as per the direction of Engineer-in-charge.
b) Walls (any thickness) butt not less then 0.10 metre thickness) attached pillasters, buttresses, plinth and string courses etc. from top of foundation up to floor two level with in all leads and lifts as per the direction of Engineer-in-charge.
Providing and laying cement concrete 1:5:10 (One cement is to five sand is to ten graded stone aggregate 40 milimetre nominal size) with 15% plum and curing complete excluding the cost of form work in retaining walls/breast walls, the size of plums shall usually be 150 milimetre to 300 milimetre as per HPPWD specification within all leads and lifts as per the direction of Engineer-in-charge.
Boulder filling/stone soling properly hand packed tightly/interstices with Kharanja stone under floor including carriage of material spreading, watering and rolling of hiding material moorum or earth etc. within all leads and lifts as per the direction of Engineer-in-charge.
Providing and laying cement concrete 1:3:6 (One cement is to three sand is to Six graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth, retaining walls and breast wall within all leads and lifts as per the direction of Engineer-in-charge.
Providing and laying cement concrete 1:2:4(One cement is to two sand is to four graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth.
Providing and laying mild steel/tor steel reinforcement for reinforced cement concrete work including bending binding and placing in position complete upto floor two level within all leads and lifts as per the direction of Engineer-in-charge.
Providing in reinforcement cement concrete work smooth finishing of the exposed surface with cement mortar 1:3 (1 cement 3 sand) within all leads and lifts as per the direction of Engineer-in-charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_186064.xls
BOQ • 0.30 MB
Form6.pdf
Tender Documents • 0.28 MB
Form8.pdf
Tender Documents • 0.99 MB
Termsandconditions.pdf
Tender Documents • 0.16 MB