Loading…
Loading…
Tender Value
₹5.2 Cr
EMD Value
₹5.2 L
Closing Date
18 May 2026, 6:00 pmClosed
CITY ENGINEER ( I/C)
CONSTRUCTION OF FOOT OVER BRIDGE AT GONDAL CHOWKDI IN WARD NO. 13 ON 150 FEET RINGROAD, RAJKOTWITH 5 YEAR OPERATION AND MAINTANANCE(Re-Tender)
300357
RMC/ENGG/CZ/26-27/01
Open
Civil Works
Works
Rajkot
14 documents required · 13 mandatory · 1 optional
₹15,000
Rajkot Municipal Corporation
₹5.2 L
1 May 2026
1 May 2026
1 May 2026
18 May 2026
1 May 2026
5.Opening of Technical Bid 28/05/2026 at 11.00 Hours onwards
6.Verificationofsubmitteddocuments 29/05/2026 at 11.00 Hours onwards
(EMD,e-Tenderfee, etc.)
7. Agency to Remain present with 30/05/2026 at 16:00 to 18:00 Hours
original documents for Verification onwards
8.Opening of Price Bid(For Technically 05/06/2026 at 11:00 Hours onwards
qualified bidders only)
9.Bid Validity 120Days
For further details, pre-qualification criteria etc. visit www.rmc.nprocure.com
Office of the CITY ENGINEER
RAJKOTMUNICIPALCORPORATION AMBEDKAR
BHAVAN CENTRAL ZONE NEAR BUS STAND,
RAJKOT - 360005 (GUJARAT)
RAJKOTMUNICIPALCORPORATION
CONSTRUCTION OF FOOT OVER BRIDGE AT GONDAL CHOWKDI
IN WARD NO. 13 ON 150 FEET RINGROAD, RAJKOT WITH
5 YEAR OPERATION AND MAINTANANCE (Re-Tender)
Section-1 – Invitation to Bid, Instructions to Bidders and Formats.
Section-2 – General Conditions of Contract
Section-3 – Technical Specifications
Bill of Quantities(With Price)
Statement showing the details of abbreviations
FullForm Abbreviation
CITYENGINEER ACE
Operation and Maintenance O&M
Net Present Value NPV
Engineering Procurement and Construction EPC
Paschim Gujarat Vij Co.Ltd. PGVCL
Critical Path Method CPM
Reinforced Cement Concrete RCC
High Ground Level Reservoir HGLR
Bureau of Indian Standard BIS
American Water Works Association AWWA
American Petroleum Industries API
Million Liter per Day MLD
High Yield Strength Deformed bar HYSD
Corrosion Resistance Steel CRS
Ordinary Portland Cement OPC
American Standard for Testing of Material ASTM
Flux Compensated Magnetic Amplifier FCMA
Cost Insurance and Freight CIF
Free On Board FOB
INVITATIONFORBIDS
RAJKOTMUNICIPALCORPORATION
Thee-Tendersareinvitedwithtwobidsystembye-Tenderingfromtheexperienced
contractorsregisteredinGWSSB/StateGovernment/CentralGovernment/Semi
Government in appropriate class for below mentioned work:
a) Construction Cost(Civil+Elec.)
Sr Nameofwork b) O&M Cost in Rs. (5 Years)
No c) Total Estimated Cost
e) E-TENDER fee
f) Time limit for
completion ofwork
1 CONSTRUCTION OF FOOT OVER BRIDGE AT a) Rs.4,74,32,716/-(withoutGST)
GONDAL CHOWKDI IN WARD NO. 13 ON 150 b) 47,43,271/-(withoutGST)
FEET RING ROAD, RAJKOT WITH 5 YEAR c) 5,21,75,987/-(withoutGST)
OPERATION AND MAINTANANCE (Re-Tender) d) Rs.521759/-
e-TENDERNo.RMC/ENGG/CZ/26-27/ f) 12Months
g) Sp. Cat-I (Bridge) and "A" Class
Milestone dates for e-tendering are as under
1.Downloadingofe-documents 01-05-2026 To 18-05-2026 up-to
2. Pre-bid Meeting 08-05-2026 at 16:00 Hours on wards
3.Last date for online submission of 18-05-2026 up-to18.00Hrs.
4.Submission of EMD, Tender fee and 25/05/2026 up-to18.00Hrs.
Other documents for verification by
Regd.Post.A.D. / Speed Post
5.OpeningofTechnicalBid 28/05/2026 at 11.00 Hours onwards
6.Verificationofsubmitteddocuments 29/05/2026 at 11.00 Hours onwards
(EMD,e-Tenderfee, etc.)
7. Agency to Remain present with 30/05/2026 at 16:00 to 18:00 Hours
original documents for Verification onwards
8.Opening ofPriceBid(For Technically 05/06/2026 at 11:00 Hours onwards
qualified bidders only)
9.BidValidity 120Days
For further details, pre-qualification criteria etc. visit www.rmc.nprocure.com
1. The e-tender fee will be accepted only in form of Demand Draft in favor of
"Rajkot Municipal Corporation" Rajkot, payable at Rajkot fromany Nationalized
Bank or Scheduled Bank (except Co-operative Bank) in India and must be
delivered to above address.
2. All bidders must submit Bid security (EMD) as above (1% of Tender Amount)
either directly deposited in ICICI Bank Account No.015305010638 (Rajkot
Municipal Corporation) IFSC Code ICIC0000153 (NEFT/RTGS or ONLINE
TRANSFER) or submit at the below mentioned address in form of Demand
Draft in favor of "Rajkot Municipal Corporation", Rajkot, from any Nationalized
Bank or Scheduled Bank (except Co-operative Bank) in India.Bank Guarantee is
applicable only for Bid Estimated Amount of RS. 1.00 Crore and above Submission
of required documents shall have to be done at the below mentioned address:
Office of the CITY ENGINEER
RAJKOTMUNICIPALCORPORATION
AMBEDKARBHAVAN CENTRAL ZONE
NEAR BUS STAND, RAJKOT -
3. The pre-qualification requirement is as under:
i) Financial Criteria:
(1) The Bidder must have achieved a minimum annual Turnover
(defined as billing work in progress and completed in all classes of
civil engineering construction works only) in any one year over the
last seven financial years of the annual value of contracts value.
(2) The Bidder should give undertaking that he has access to or has
available, liquid assets(Aggregate of Working capital, cash in
hand&uncommitted bank guarantees) and/or credit facility equal to
25% of the value of the contract / contracts applied.
(3) Available BidCapacity(ABC)must be more than the estimated tender
Available bid capacity(ABC)=(AxNx2)–B,
A = Maximum of updated total amount of work executed in any one
A = Maximum of updated total amount of work executed in any one
year of the last seven financial years.
B =Amount of the existing commitments and ongoing works to be
discharge during time interval ofN years from the bid due date.
N=Number of years prescribed for completion of the proposed works
(4) Bidde rmust have minimum “A” Class registration.
ii) Experience Criteria:
The bidder should possess following minimum experience:
(1) Experience in successfully completing or substantially completing at least
one contract of similar nature of work of at least 40 percent of the value
of proposed contract within the last seven years.
Definition of similar nature of work:
(1) Bidder should have completed at least one work of similar nature of 40% of
tender amount is completed in last seven years.
Similar nature work shall mean construction of Railway ROB Railway Span of
greater than 24m length / Railway Foot over Bridge of greater than 24m length.
At least one completed work of similar nature of 40% of tender amount.
(2) The works may have been executed by the applicant as prime contractor or as a member
of a joint venture. In case a project has been executed by a joint venture weight
towards experience of the project would be given to each joint venture in proportion of their
final participation in the joint venture.
(3) Substantially completed works means those works which are at least 90% completed as on
the date of submission (i.e. Gross value of work done up to the last date of submission is
90% or more of the original contract price) and continuing satisfactorily.For these, a
certificate from the employers shall be submitted along with the application incorporating
clearly the name of the work, contract value, billing amount, date of commencement of works
satisfactory performance of the contract & any other relevant information.
NOTE: -For O&MfinancialcriteriawillbecalculatedonTenderamount of 1 Year.
(4) The work shall be awarded irrespective of any experience tounemployed Engineer.
NOTE:-OnlyapplicableforEle/Mech/CivilWork
For Diploma Holder:- Up to tender amount of Rs.5 LacsFor Degree
Holder:- Up to tender amount of Rs.10 Lacs
Noteonpre-qualificationrequirement:
1. Enhancement factor at 10% per year for last seven years will be
applicable to arrive at average annual turnover and experience to
finalize the magnitude of work done in last seven years.
1 CurrentYear(2026-27)
2. For Financial and Experience criteria, the estimated cost of
Rs5,21,75,987/-will be considered.
4. Bidder has to quote their rates without GST. The invoice should be
submitted by contractor showing the breakup of GST in the bill. GST will be
paid extra at the prevailing rate at the time of execution.
5. The contractor shall have to purchase the material required for this tender
work, only from the supplier having registered GST Number. RMC will not be
responsible to pay any amount towards GST if the material is purchased from
the unregistered supplier / not having GST Number.
6. After opening of Technical Bid, the procedure for the pre-qualification shall be
adopted and the Price Bid of only successful qualified bidder shall be opened
for final evaluation of the contract. The decision of Municipal Commissioner
regarding the pre-qualification shall be final and binding to all the bidders.
7. The Tender of those bidder(s) those who fails to produce the required
documents physically within the stipulated date and time, will be treated as
non-responsive and their Price Bid will not be opened.
8. The bidder should not have been Black Listed, suspended, terminated, backed
out, debarred & delisted by any Municipal Body / Urban Local Body /
Development Authority in any State Government Body or undertaking / any
department or undertaking of Government of India, since inception of the firm
/ Company. Such a case will be rejected out rightly. A Declaration in this
regard on Rs.300/- Stamp Paper duly Notarized shall have to be submitted as
per Annexure along with the tender documents. Submission of the bid
document without such Notarized declaration will be rejected out rightly.
9. The bidder should provide accurate information on any litigation history or
arbitration resulting from contracts completed or under execution by him
over the last ten years. This should also include such cases, which are in
process / progress. A consistent history of awards against the bidder may
result in failure of the bid. In case the bidder has not provided such
information and has come to the notice of the authority, the tender will be
rejected at what so ever stage and in such case all the losses that will arise
out of this issue will be recovered from the Bidder / bidder and he will not
have any defense for the same.
10. Joint Venture is not permitted for this tender.
11. For this work L-1 agency has to appoint a Project engineer as proposed by
RMC whose educational qualification of MINIMUM DIPLOMA in CIVIL
ENGINEERING with minimum 5 Years of Experience and whose salary must be
minimum Rs.26,000/- per month given by L-1 agency. In case of failing that
the same amount is deducted by RMC from agency’s Bill. For that no other
extra payment is given by RMC.
12. Conditional Tenders will be out rightly rejected.
13. If no agency remains present and are no points for Prebid meeting, “NIL”
minutes to be considered and the same will not be uploaded.
14. Rajkot Municipal Corporation, Rajkot, reserves the right to accept / reject
any or all e-tender(s) without assigning any reasons thereof.
15. O&M (Total Cost of 5 Years, GST Will Not Paid by RMC to the Bidder on O&M
CITYENGINEER(I/C)
RajkotMunicipalCorporation
CHECKLISTFORSUBMISSIONOFDOCUMENTS(ONLINEANDOFFLINE)
Thebiddermustsubmittherelevantdocumentsasperbelow:
Sr DocumentName ONLINE OFFLINE
No SUBMISSION SUBMISSION
1 TenderFee
3 AgencyRegistrationCertificate --
4 GSTRegistration --
5 PANCard --
6 PFRegistration --
7 ESICRegistration --
8 LabourLicense & CESS AsPerPrevailing --
Registration Govt. Rules
9 Non blacklist Declaration on
10 TurnoverCertificatefromCA --
11 WorkExperienceCertificates --
12 WorkingCapitalCertificate from --
13 Otherdocuments,ifany --
14 Available Bid Capacity Certificate --
with Sign and Stamp of CA
Note: The bidder must submit all relevant documents as per qualification criteria
and tender conditions. No correspondence to the agency will be done for shortfall
Original documents to be brought by bidder/authorized person for verification on
the date and time as communicated by engineer-in-charge. Successful bidder to
submit hard copyof tender documents including addenda/Corrigendum,if any and
othersupportivedocumentsasrequiredinthistender,dulystamped&signedonall pages.
CITYENGINEER(I/C)
RajkotMunicipalCorporation
NameandsignatureofBidder
CheckListforsubmissionofDocumentsTab
TenderFeesubmittedasperTender Yes/No
Tender Earnest Money Deposit Yes/No
submitted as per Tender
Registrationdocumentssubmitted as Yes/No
per tender requirement
FinancialDetails:
Turnoverdetailssubmittedas per Yes/No
Working Capital as per requirement Yes/No
of tender is submitted
ExperienceDetails:
Details of TechnicalStaff and details Yes/No
of machineries submitted
Addressproofsubmitted Yes/No
Identityproofsubmitted Yes/No
Fresh Declaration on Non-Judicial Yes/No
Stamp Paper regarding not black
listed or Terminated or Debarred, is
ProfessionalTaxReceiptofcurrent Yes/No
Over and above, the agency shall also have to submit all other
necessary documents as may be required for pre-qualification, failing
which, theagency will be treated as Non-responsive and will be
DISQUALIFIED and also the online pricebidofsuchagencywillnot
Signatureofcontractorwithseal
INSTRUCTIONSTOBIDDER
The contract documents may be secured in accordance with the Notice
Inviting E-TENDER for the work called. The work shall include supply of
materials necessary for construction of the work.
IT2.INVITATIONTOE-TENDER
TheRajkotMunicipalCorporationhereinafterreferredastheCorporationwill
receive e-Tenders for the work of as per the specifications and schedule of
prices in the e-Tender document. The e-Tenders shall be opened online as
specifiedinthee-TendernoticeinthepresenceofinterestedBiddersortheir
representatives. The Corporation reserves the right to reject the lowest or
anyotheroralle-TendersorpartofitwhichintheopinionoftheCorporation
doesnotappeartobeinitsbestinterest,andtheBiddershallhavenocause of action
or claim against the Corporation or its officers, employees, successors or
assignees for rejection of his e-Tender.
IT3.LANGUAGEOFe-TENDER
E-TENDERsshallbesubmittedinEnglish,andallinformationinthee-Tender shall
also be in English, Information in any other language shall be accompanied
by its translation in English. Failure to comply with this may make the e-
Tender liable to rejection.
IT4.QUALIFICATIONSOFBIDDERS
A. The Bidders shall abide by the laws of the Union of India and of Gujarat State
and legal jurisdiction of the place where the works are located.
B. The Bidder shall furnish a written statement of financial and technical
parameters with details and documents along with his e-Tender which
contains namely as below:
i. TheBidder’sexperienceinthefieldsrelevanttothiscontract.
ii. The Bidder’s financial capacity/resources and standing over at least
iii. TheBidder’spresentcommitments(Jobsonhand).
iv. TheBidder’scapabilityandqualificationsofhimselfandhisregularstaff etc.
v. PlantsandMachineryavailablewiththeBidderfortheworke-Tendered.
C. Jointventure:(N.A.)
i. For the work mentioned above Joint Venture shall be allowed with
maximum number of partner two, however all the fees, guarantee
amount etc will be in the name of lead partner.
ii. In Joint Venture, the lead partner as well as any other partner should
have experience of similar nature of work, minimum 15 % of the
estimated cost.
IncaseofJointventurethetenderevaluationwillbeasunder:
Thefinanceofeachpartnerwillbeconsiderproportionatetotheir share in
the Joint venture agreement.
Theexperiencedofeachpartnerwillbeaddedinthetender evaluation.
Bids submitted by a joint venture of two firms as partners shall comply with
the following requirements.
i. Tender fee, Earnest Money Deposit, Security Deposit and other financial
details will be in the name of the lead partner.
ii. All the partners shall have to enter into the Joint venture agreement and
original agreement duly notarized shall have to be submitted along with
tender documents.
iii. The bid, and in case of a successful bid, the Form of Contract Agreement,
shall be signed so as to be legally binding on all partners.
iv. One of the partners shall be authorized to be in charge, and his
authorization shall be evidenced by submitting a power of attorney by
legally authorized signatories of all the partners.
v. The partner in charge shall be authorizes to incur liabilities, receive
payments and receive instructions for and on behalf of any or all partners
of the joint venture and the entire execution of the Contract.
vi. Allpartners ofthe joint venture shall bejointlyandseverallyliable forthe
execution of the Contract in accordance with the Contract terms and
relevant statement to this effect shall be included in the authorization
mentioned under (iv) above as well as in the Bid Form and the Form of
Contract Agreement ( in case of successful bid ); and
vii. PermissibleJointventurepartnersshallberestrictedtotwonumbers.
TheownerortheEngineer-in-chargeisnotobligedtodisclosehisfindingsor his
The Bidder shall furnish original documentson the date mentioned in tender
notice.Thebidforthosebidderwillbetreatedasnon-responsivewhofailing to
produce original documents on specified date.
D. Price Escalation: -
Price escalation will be applicable for the works above Rs 100 Lakh. (1 Cr.)
Contract price shall be adjusted for increase or decrease in rates and price of Labour,
Materials, Fuels & Lubricants in accordance with the followin principles & procedures
and as per formula given in the contract data.
A. The price adjustment shall apply for the work done from the start date given in the
contract data up to end of the initial intended completion date or extensions granted by
the Competent Authority and shall not apply to the work carried out beyond the
stipulated time for reasons attributable to the contractor.
B. The price adjustment shall be determined during each month from the formula given
in the contract dat.
C. Following expressions and meanings during to the work done during cach month.
The price adjustment for Material
Vm0.85 *(Pm/100)*R*(Mi-Mo) / Mo, Where.
Vm= Increase or decrease in the cost of work during the month under
consideration due to change in rates for local materials other than Cement, Steel.
Bitumen & POL (Fuel & Lubricants)
Mo= The all-India wholesale price index (All commodities) on 28 days preceding
the schedule date of opening of technical bids, as published by the office of
Economic Advisor, Dept. for promotion of Industry & internal trade, Ministry of
Commerce and Industry.
Mi =The all-India Whole sale price index (all commodities) for the month under
consideration as published by the office of Economic Advisor, Dept. for promotion
of Industry & internal trade, Ministry of Commerce and Industry.
Pm= Percentage of local Material Component (other than Cement, Steel, Bitumen
& POL) of the work.
R= Total value of work done during the month. It would include the amount of
secured advance granted, if any, during the month less the amount of secured
advance recovered.
The following percentage will govern the price adjustment for the entire contract.
2. Cement-Pc……………….. 1.57%
4. Bitumen-Pb……………….. 0.00%
6. Plant & Machinery spares - Pp……………….. 8.33%
7. Other Material - Pm……………….. 62.91%
Note: The same formula will be applicable to Steel Ps / Cement Pc /Bitumen
Pb/Labor P1/POL (Fuel & Lubricants) Pf/Plant & machinery spares Pp/Other
IT5.E-TENDERDOCUMENTS
The e-Tender documents and drawings shall comprehensively be referred to
as e-TENDER document. The several sections form in the document are the
essentialpartsofthecontractandarequirementoccurringinoneshallbeas binding
as though occurring in all, they are to be taken as mutually, explanatory
and describe and provide for complete works.
IT6.EXAMINATIONBYBIDDERS
A. Atthisownexpenseandpriortosubmittinghise-Tender,eachBiddershall
(a) examine the Contract Documents, (b) visit the site and determine local
conditions which may affect the work including the prevailing wages and
otherpertinentcostfactors,(c)familiarize,himselfwithallcentral,stateand local
laws, ordinance, rules regulations and codes affecting the material supply
including the cost of permits and licenses required for the work and(d)
correlate his observations, investigations, and determinations with the
requirements of the e-TENDER Documents, site & subsoil investigation.
B. The e-Tender is invited on..%. Rateand contractor shall have to quote his
Theworksshallhavetobecompletedinallrespectasstatedinthee-Tender
document to the satisfaction of the Corporation.
a) ThefollowingcomprisesinContractDocumentsatapriceofRs15,000-00.
e-TENDERDocument:
1. NoticeinvitingBidders.
2. InstructionstotheBidder.
5. Generalconditionsofcontract
Technicalspecifications
a. BidForm(WithPrice)
b. PreambletoPriceschedule
c. PriceSchedule(Schedule-B)
GeneralSpecifications
1. Generalnote&sitedescription.
3. ScopeofContract.
4. E-Tenderprice.
5. CompletionSchedule.
6. Siteinvestigation.
7. Contractor’sresponsibility.
9. QualityAssurance.
10. ClassificationofStrata.
E. Copy of the E-TENDER Document should be completed, checked in a
responsible manner, digitally signed, and submitted. Security Bond shall be
submitted in person by the stipulate date, which shall form the e-Tender.
The e-Tender is required to complete with all the pages in which entries are
required to be made bythe Bidderarecontainedinthee-Tender documents and
the Bidder shall not take out or add to or amend the text of any of the
documentsexceptinsofarasmaybenecessarytocomplywithanyaddenda issued
pursuant to Clause IT.17 hereof.
IT7.EARNESTMONEYDEPOSIT:
A. EachBiddermustsubmitareceiptofdepositasTenderguaranteetowards
EarnestmoneyamountingtoRs.521759/-/-inanyformmentionedbelow:
a) ByaDemandDraftontheRajkotBranchofanyNationalizedBankor Scheduled
Bank except co-operative bank.
b) It can be directly deposited in the account of Rajkot Municipal
c) A Bank Guarantee from Rajkot Branch of any Nationalized Bank or
ScheduledBankexceptco-operativebank.Itshallbevalidforaperiodof not
less than Three hundred and Sixty (360) days from the date of
EMDshallcomplywiththerequirementsforBondasstipulatedintheGeneral
conditions of contract. The Tender guarantee bond will be held by the owner
as a guarantee that the Bidder, if awarded the contract, will enter into the
contract agreement in good faith and furnish the required bonds. Any e-
TendernotaccompaniedbyaTenderguaranteeintheformofearnestmoney
depositedforthesumstipulatedinthee-TenderDocumentwillbesummarily
B. TheEarnestMoneyDepositwillberefundedtotheunsuccessfulBiddersafter an
award has been finalized.
C. TheEarnestMoneyDeposit(Tender Guarantee)willbeforfeitedin eventthe
successful Bidder fails to accept the contract and fails to submit the
“Performance Guarantee Bonds to the Owner as stipulated in this e-Tender
document within ten (10) days after receiptof notice of award of contract.
The successful Bidder shall furnish the required Security Deposit for
performance and plus additional security if any for unbalanced bids in
accordance with the condition of the contract and attend the office of the
Engineer In-charge for execution of the contract documents. If he fails to
furnish the Security Deposit for performance or enter into an agreement to
execute the contract for the work offered to him, his Earnest Money Deposit
willbeforfeitedandtheBidderwillbeBlackListed/Debarredfromtendering for
further works of Rajkot Municipal Corporation for the period of three years.
D. The Earnest Money Deposit of the successful Bidder shall be returned after
theperformanceguaranteebond,asrequired,isfurnishedbythecontractor.
E. Nointerestshallbepaidbytheowneronanye-Tenderguarantee.
IT8.INCOMETAXCLEARANCECERTIFICATE:
LatestIncomeTaxclearanceCertificatesmustaccompanywiththe e-Tender
without which the e-Tender is liable to be summarily rejected. The Income
Tax Clearance Certificate obtained from the Income Tax Officer shall clearly
indicate the Income Tax Pan No/Circle/Ward, District and the reference
number of the assessment along with the assessment year.
IT9.PREPARATIONOFe-TENDERDOCUMENTS
Bidders are required to note the following while preparing the e-TENDER
A. e-TENDER shall be submitted on the e-TENDER form bound here in
English. All statements shall be properly filled in. Numbers shall be stated
both in words and in figures were so indicated.
B.All entries or prices and arithmetic shall be checked before submission of
thee-TENDER.Ifthere isdiscrepancybetweenthe ratesquotedin figures
andinwords,theratesexpressedinwordsshallbeconsideredasbinding.
C. Each e-Tender shall be accompanied by the prescribed e-Tender security
bond and other required documents and drawings. All witnesses and
sureties shall be persons of status and probity and their full names,
occupations and addresses shall be stated below their signature.
D. Variation to the contract Documents requested by the Bidder may be
affixedanddulysignedandstamped.Suchvariationsmaybeapprovedor
refused by the Corporation is not obliged to give reason for his decisions.
IT10.SUBMISSIONOFe-TENDERDOCUMENTS
Biddersarerequestedtosubmitthee-TENDERDocumentsonfollowinglines.
A.Volumecontainingfollowingdocuments:
I. EarnestMoneyDeposit.
II. Certificates as registered contractor in appropriate class with
Government of Gujarat or appropriate authority.
III. Bidder’s financial capability statement including last three years
Incometaxreturns,balancesheet,dulysignedbyregisteredchartered
IV. Bidder’sexperienceinthefieldrelevanttothiscontract.
V. A list of the equipment the Bidder possesses and that which he
proposed to acquire and use for the purpose related to the work.
The time limit for receipt of e-Tender shall strictly apply in all cases. The
Bidders should therefore ensure that their e-Tender is received by the
competent authority The Rajkot Municipal Corporation at before expiry
of the time limit. No delay on account of any cause for receipt of e-Tender
shall be entertained.
The e-Tender must contain the name address of residence and place of
business of the person or persons submitting the e-Tender and must be
digitally signed.
e-TENDER by partnership firm must be furnished with the full names and
addresses of all partners and be signed by one of the members of the
partnership or by a legally authorized representative holding power of
attorney followed by signature and designation of the person of person
e-TENDERbyCorporations/Companies mustbesignedwiththelegalname
oftheCorporation/Companiesbythepresident/orbythesecretaryorother
person or persons legally authorized to bind the Corporation/Company in
IT11TENDERVALIDITYPERIOD
The validity period of the e-Tender submitted for this work shall be of One
Hundred and Twenty (120) calendar days from the date opening of the
TechnicalbidofeTenderandthattheBiddershallnotbeallowedtowithdraw or
modify the e-Tender offer on his own during the validity period. The Bidder
will not be allowed to withdrawn the e-Tender or make any
modificationsoradditionsinthetermsandconditionsonhisowne-Tender.If this is
done then the owner shall, without prejudice to any other right or remedy,
be at liberty to reject the e-Tender and forfeit the earnest money deposit in
IT12GENERALPERFORMANCEDATA
Bidder shall present all the information which sought for in the e-Tender
document in form of various schedules if given. E-TENDERs may not be
considered if left blank or the schedules are not properly filled in.
IT13SIGNINGOFe-TENDERDOCUMENTS
If the Tender is made by an individual it shall be signed with his full name
above his current address. If the Tender is made by a proprietary firm, it
shall be signed by the proprietor above his name and the name of his firm
with his current address.
If the e-Tender is made by a firm in partnership,it shall be signed by all the
partners of the firm above their full names and current address, or by a
partner holding the power of attorney for the firm, in which case a certified
copy of the power of attorney shall accompany the e-TENDER. A certified
copyofthepartnershipdeed,currentaddressesofallthepartnersofthefirm shall
also accompany the e-Tender.
If the e-Tender is made by a limited company or a limited corporation, it
shall be signed by a duly authorized person holding the power of attorney,
shallaccompanythe e-Tender.Such limited companyor corporation maybe
required to furnish satisfactory evidence of its existence before the contract
If the e-TENDER is made by a group of firms, the sponsoring firm shall
submit complete information pertaining to each firms in the group and state
alongwiththebidastowhichofthefirmsshallhavetheresponsibilityfore-
Tenderingandforcompletionofthecontractdocumentsandfurnishevidence
admissible in law in respect of the authority to such firms on behalf of the
group of firms for e- Tendering and for completion of contract documents.
The full information and satisfactory evidence pertaining to the participation
of each member of the group of firms in the e-Tender shall be furnished
along with the e-Tender.
Allwitnessesandsuretiesshallbepersonsofstatusandprobityandtheirfull
names,occupationsandaddressesshallbestaredbelowtheirsignatures.All the
signatures in the e-Tender document shall be dated.
IT14WITHDRAWALOFTENDERS
If,duringthetendervalidityperiod,theBidderwithdrawshisTender,Tender
security (Earnest Money) shall be forfeited and Bidder will be debarred for
next three years to quote in R.M.C.
IT15INTERPRETATIONSOFe-TENDERDOCUMENTS
Bidders shall carefully examine the e-TENDER Document and fully inform
themselves astoalltheconditions and matterswhich mayinanyway affect
theworkorthecostthereof.IfaBidderfindsdiscrepanciesoromissionfrom the
specifications or other documents or should be in doubt as to their
meaning,heshouldatonceaddressquerytotheADDL.CITYENGINEER,
R.M.C. The result of interpretation of the e-TENDER will be issued as
IT16ERRORSANDDISCREPANCIESINe-TENDERS
In case of conflict between the figures and words in the rates the rate
expressed in words shall prevail and apply in such cases.
IT17MODIFICATIONOFDOCUMENTS
Modification of specifications and extension of the closing date of the e-
Tender, if required will be made by an addendum. Each addendum will be
madeavailableonlinetoallBidders.Theseshallformapartofe-Tender.The Bidder
shall not add to or amend the text of any of the documents except in so far
as may be necessary to comply with any addendum.
AddendaformpartoftheContractDocuments,andfullconsiderationshallbe given
to all Addenda in the preparation of e-Tender. Bidders shall verify the
number of Addenda issued, if any and acknowledge the receipt of all
Addendainthee-TENDERFailuretosoacknowledgemaycausethee-Tender to be
A. RMCmayissueAddendatoadviseBiddersofchangedrequirements.Such
addenda may modify previously issued Addenda.
B. Noaddendummaybeissuedafterthetimestatedinthenoticeinvitinge-
IT18TAXANDDUTIESONMATERIALS
All charge on account of excise duties, Central / State, sales tax, work
contract tax and other duties etc. on materials obtained for the works from
any source shall be borne by the contractors. No (P) or ‘C’ or ‘D’ form shall
IT19EVALUATIONOFe-TENDERS
While comparing e-Tenders, the Rajkot Municipal Corporation shall consider
factors like price offer is workable with the market price, efficiency and
reliability of construction method proposed, compliance with the
specifications, relative quality, work done in past with Rajkot Municipal
CorporationorotherGovernmentOrganizations,litigationissuesetc.
Evaluation criteria specifically mentioned in the specification will also be
taken into consideration in the evaluation of e- Tenders.
IT20TIMEREQUIREDFORCOMPLETION
Thecompletionperiodmentionedinthisscheduleistobereckonedfromthe
dateofnoticetoproceed.Totalcompletionperiodis12Monthsfromthedate
ofissueofnoticetoproceedandcontractorshould adheretothiscompletion time.
Monsoon period from 1stJuly to 30thSeptember will be considered as non-
working period and hence excluded in time limit.
IT21POLICYFORTENDERUNDERCONSIDERATION
TENDERshallbetermedtobeunderconsiderationfromtheopeningofthee- Tender
until such time any official announcement or award is made.
Whilee-Tendersareunderconsideration,Biddersandtheirrepresentativeor
otherinterestedpartiesareadvisedtorefrainfromcontactingbyanymeans any
Corporation personnel or representatives on matters related to the e-
Tenders under study. The Corporation’s representatives if necessary will
obtain clarification on e-Tenders by requesting such information from any or
all the Bidders, either in writing or through personal contact, as may be
necessary.TheBidderwillnotbepermittedtochangethesubstanceofhise- Tender
after e-Tenders have been opened. This includes any post Tender
pricerevision.Non-compliancewithhisprovisionshallmaketheTenderliable for
IT22PRICESANDPAYMENTS
The Bidder must understand clearly that the prices quoted are for the total
works or the part of the total works quoted for and include all costs due to
materials, labour, equipment, supervision, other services, royalties, taxes
etc. and to include all extra to cover the cost. No claim for additional
paymentbeyondthepricesquotedwillbeentertainedandtheBidderwillnot be
entitled subsequently to make any claim on any ground.
IT23PAYMENTTERMS
The terms of payment are defined in the General Conditions of Contract and
Technical specifications. The Corporation shall not under any circumstances
relax these terms of payment and will not consider any alternative payment
terms. Bidders should therefore in their own interest note this provision to
avoid rejection of their e-Tenders.
Awardofthecontractortherejectionore-TENDERswillbe made duringthe Tender
contractors are requested to quote their price offer in % below or above
A. After all contract contingencies are satisfied and the Notice of Award is
issued,thesuccessfulBiddershallexecutetheContractAgreementwithin the
time stated and shall furnish the Bond as required herein. The contract
Agreement shall be executed,in form stipulated by the Owner.
B. If the Bidder receiving the Notice of Award fails or refuses to execute the
Contract Agreement within the stated time limit or fails or refuses to
furnishtheBondasrequiredherein.TheOwnermayannulhisawardand
declarethee-Tendersecurityforfeited andwilltakeactionasdeemedfit.
C. A Corporation, partnership firm or other consortium acting as the Bidder
and receiving the award shall furnish evidence of its existence and
evidence that the officer signing the contract agreement and Bonds for
thecorporation,partnershipfirmorotherconsortiumactingastheBidder is
duly authorized to do so.
IT25SIGNINGOFCONTRACT
The successful Bidder shall be required to execute the contract agreement
within 10 days of receipt of intimation to execute the contract, failing which
the Corporation will be entitled annul to the award and forfeit the Earnest
MoneyDeposit.Thepersontosignthecontractdocumentshallbepersonas
detailed in Article IT.13 (signing of e-Tender documents).
IT26DISQUALIFICATION
Ae-Tendershallbedisqualifiedandwillnotbetakenforconsiderationif,
(a) The envelope does not show on theoutside thereferenceof bid andthus
gets opened before the due date of opening (as per Article IT 10 i.e.
submission of tender document)
(b) The TenderfeeandTenderEarnestMoneyDepositisnotdepositedinfull and in
the manner as specified as per Article IT.7 i.e. Earnest Money Deposit.
(c) The e-Tender is in a language other than English or does not contain its
English Translation in case of other language adopted for e-Tender
(d) The e-Tender documents are not signed by an authorized person (as per
Article IT. 13 i.e. signing of e-Tender documents).
(e) The general performance data for qualification is not submitted fully (as
per Article IT 12 i.e. General performance Data).
(f) Bidder does not agree to payment terms defined as per Article IT. 23 i.e.
A.Ae-Tendermayfurtherbedisqualifiedif,
(a) PricevariationisproposedbytheBidderonanyprincipleotherthanthose
provided in the e-TENDER Documents.
(b) Completionscheduleofferedisnotconsistentwiththecompletion schedule
defined and specified in e-Tender document.
(c) Thevalidityofe-TenderbondislessthanthatmentionedinArticleIT.
i.e.e-Tendervalidityperiod.
(d) Anyofthepageorpagesofe-Tenderis/areremovedorreplaced.
(e) Anyconditionaltender.
(f) AllcorrectionsorpostedslipsarenotinitiatedbyBidder.
(g) Anyerasureismadeinthee-tender.
IT27PERFORMANCEGUARANTEE(SECURITYDEPOSIT)
As a contract security the Bidder to whom the award is made shall furnish a
performance guarantee (Security deposit) for the amount of 5% of the
contract price to guarantee the faithful performance, completion and
maintenance of the works of the contract in accordance with all conditions
and terms specified herein and to the satisfaction of the Engineer-in-charge
and ensuring the discharge of all obligations arising from the execution of
Additionalperformanceguaranteeispayableif,
1. the contract price offered by the selected bidder is lower than 10% but
up to 20% of the estimated project cost than the additional performance
security shall be calculated @ 20% of the difference in the estimated
project cost minus 10%of the estimated project cost and Contract price
offered by the selected bidder.
2. thecontractpriceofferedbytheselectedbidderislowerthan20%ofthe
Estimated project cost than the additional performance security shall be
calculated @ 30% of the difference in the Estimated project cost minus
10%of the Estimated project cost and Contract price offered by the
selected bidder.
This additional performance security shall be treated as part of the
performance security.
Performance security shall be valid beyond 60 days of the defect liability
periodandtheadditionalperformancesecurityshallbevalidbeyond28days of
project completion date.
Final SD will be calculated at the time of final bill i.e. actual completion
Performanceasmentionedabovemaybeintheformsmentionedbelow:
d) By a Demand Draft on the Rajkot Branch of any Nationalized Bank or
Scheduled Bank except co-operative bank.
e) A fixed deposit receipt of any Schedule Bank or Nationalized Bank
(except Co-operative Bank) duly endorsed in favor of the
RajkotMunicipal Corporation, Rajkot.
f) ABankGuaranteefromRajkotBranchofanyNationalizedBankorScheduled
Bank except co-operative bank.
TheperformanceguaranteeshallbedeliveredtotheCorporationwithinten
(10) days of the notice of award and at least three (3) days before the
contract agreement is signed unless otherwise specified by the Engineer-in-
charge. Alternatively, the contractor may at his option deposit an amount of
2.5% of the value of the contract price within ten days and the balance
2.5% to be recovered in installments through deduction @ the rate of 10%
from the running account bills. It is further clarified that Performance
Guarantee (SD) forextra work willalsoberecovered@ 10% from thebillof
extra work i.e. works beyond tender amount.
On due performance and completion of the contract in all respects, THE
PERFORMANCE GUARANTEE (SECURITY DEPOSIT) WILL BE
RELEASED TO THE CONTRACTOR WITHOUT ANY INTEREST AFTER
DEFECT LIABILITY PERIOD IS OVER.
ThesuccessfulBiddershallhavetoenterintoanagreementonanon-judicial stamp
paper of amount as per Stamp Duty Act in the formofthe agreement
approved by the Corporation. The cost of stamp paper and adhesive stamp
shall be borne by the contractor.
Specific reference in the specifications to any material by manufacturer’s
name,orcatalogueshallbeconstructedasestablishingastandardorquality and
performance and not as limiting competition and the Bidder in such cases,
may at his option freely use only other product, provided that it ensures an
equal of higher quality than the standard mentioned and meets Corporation
IT30NONTRANSFERABLE
e-TENDERdocumentsarenottransferable.
IT31COSTOFe-Tendering
TheownerwillnotdefrayexpenseincurredbyBiddersine-Tendering.
IT32EFFECTOFe-Tender
The e-Tender for the work shall remain for a period of One hundred and
Twenty (120) calendar days from the date of opening of the e-Tenders for
this work and that the Biddershall not be allowed to withdrawor modify the
offer in his own during the period. If any Bidder withdraws or makes any
modification or additions in the terms and conditions of his own e-Tender,
then the Corporation shall, without prejudice to any other right or remedy,
be at liberty to reject thee-Tender and forfeit the earnest money in full.
IT33CHANGEINQUANTITY
The Corporation reservestherighttowaiveanyinformationinanye-Tender and
to reject one or all e-Tenders without assigning any reasons for such
rejectionandalsotovarythequantitiesofitemsorgroupasspecifiedinthe
scheduled of prices as may be necessary.
IT34NEWEQUIPMENTANDMATERIAL
All materials, equipment and spare parts thereof shall be new, unused and
originallycomingfrommanufacturer’splanttotheCorporation.Therebuiltor
overhauled equipment/materials will not be allowed to be used on works.
IT35RIGHTSRESERVED
The owner reserves the right to reject any or all e-Tenders, to waive any
informalityorirregularityin anye-Tenderwithout assigninganyreason.The
owner further reserves the right to withhold issuance of the notice to
proceed,evenafterexecutionofthecontractagreement.Nopaymentwillbe made
to the successful Bidder on account of such withholding. The owner is not
obliged to give reasons for any such action.
IT36ADDITIONALRIGHTSRESERVED
TheCommissioner,RajkotMunicipalCorporation,reservestherighttoreduce
thescopeofwork&splitthee-Tenderintwoormorepartswithoutassigning any
reason even after the awards of contract.
IT37MOBILIZATIONADVANCE
Nomobilizationadvanceoradvanceonmachinerywillbegiven.
IT38CONDITIONALe-Tenders
The scope of work is clearly mentioned in the e-Tender documents. The
contractor shall have to carry out the work in accordance with the details
specifications. No condition will be accepted. The conditional e-Tender will
liable to be rejected.
IT39CESS®ISTRATION:
For the welfare of labour working under construction Industry, the agency
shall have to take the registration with competent authority as per Circular
No.CWA/2004/841/M-3dated30-01-2006ofGovernmentofGujarat.Rajkot
Municipal Corporation will deduct prevailing CESS of the value of work and
will deposit the same in Government.
IT40ESIREGISTRATION:
The contractors who are liable to be registered under ESI Act must possess
ESI registration number at the time of filling of tender. The agency should
follow all the rules and regulations ofESI Act as per prevailing norms.
IT41PROFESSIONALTAX
The bidder shall have to pay the Professional Tax for current financial year
imposed by Government of Gujarat, and also the bidder shall have to
produce Enrollment Certificate for the same.
The contractors who are liable to be registered under EPF Act, 1950 must
possessEFPcodeatthetimeoffillingoftender.Theagencyshouldfollowall the rules
and regulations of the Act as prevailing currently.
IT43LABOURLICENSE:
The contractors who are liable to be registered under Contract Labour Act,
1970mustpossessonline LabourLicenseatthetimeoffillingoftender.The agency
should follow all the rules and regulations of the Act as prevailing currently.
IT44FILLINGOFe-TENDER
The bidder shall have to fill all the details required in on-line bidding form of
e-Tender. Incomplete OR inappropriate OR wrong information filled may
cause the e-Tender to be rejected.
Addl/Asst.Engineer Dy.Ex.Engineer CITYENGINEER(SPL)
SignatureofContractorwithSeal
Financial&OtherStatements
Information/DetailstobesubmittedbytheBiddersinthePerformamentioned
underStatementno1to9.Allthedocuments submitted herewith assupporting
documents shall beduly attested and certified true copy.
I / We hereby declared
that I am / We partner(s) are not black listed or Terminated or Debarred or
suspended,backedout,delistedorconnectedwithfirmblacklistedorterminatedor
debarredorsuspendedorbackedoutordelistedinanyStates,CPWD/MES/Railways
oranyGovernment,Semi-GovernmentorPrivatebodysincetheinceptionofthefirm
/ company. Also, no Police complaint is lodged against the firm / company or Staff
deployed by me / us.
AtpresentIam/weareregisteredasapprovedcontractor(s),firmsin
State,CPWD/MES/Railways.
I, owner / We, the partners of this firm, hereby givean undertakingthat we
are jointly and severally responsible to meet all the liabilities ever and above the
business of this firm and make good the above financial loss sustained by the
Rajkot Municipal Corporation as a result of our abandoning the works entrusted to
I further undertake that if above declaration proves to be wrong/ incorrect
or misleading, our tender/ contract stands to be cancelled/ terminated.
Place: SignatureofAuthorizedPerson
APPLICABILITYOF PROVIDENT FUND AND MISCELLANEOUS
Successfulbidder i.e. the agencywhosetender is accepted bytheRMCshall have to
comply the necessary formalities under the employees provident fund and Miscellaneous
Provisions Act, 1952 as Contributory Provident Fund Scheme is applicable to labourers
engaged in construction activity and shall have to submit proofs regarding deduction of
providentfundandotherduesanddepositingthesamewithgovernmentdepartmentunder the act
and the scheme regularly on monthly basis failing which no running / final bill payment will
be made by the RMC to the contractor in any circumstances.
Acertificatetotheaboveeffecthastobegivenbythecontractoras under.
DepositingProvidentFundcontribution
Thisto certify that we have deducted the employees’ P.F. and deposited the
samealongwithemployer’scontributiontowardsprovidentfundonlabourcharges
/wagespaidbyustothelaborersengagedfortheworkof
Fund Authority under our Provident Fund Code No.
Weproduceherewiththecopiesofthechallansfortheprovidentfund deduction
and contribution deposited as mentioned above.
Date: SealandSignatureoftheBidder
CURRICULAMVITAE
Sr.No. Detailsofperson
3. Qualifications
4. ExperienceinProjectRelatedfield
5. Otherexperiences
6. EmploymentRecord.
Sr.No. Perid Organization Status
From- To under which /positionin
(1) Separatesheetforeachpersontobefurnishedasabove.
(2) Thecontractor’s Project Team should consist ofpersons
in the following disciplines.
a) Senior EngineerwithexperienceofBuildingwork
b) SeniormaterialEngineer.
c) SeniorQuantitySurveyor.
d) Projectmanagementexpert.
e) Siteincharge
INFORMATIONREGARDINGFINANCIALCAPACITY OF
THE CONTRACTORS
Sr. Details Amount(Rs.inlakhs) Remarks
1. Solvency ABanker’sCertificateof
current financial year
maypleasebeattached.
2. AnnualTurnoverforthe Certifiedtruecopy to
lastsevenyears. beattached
3. Priceofbiggestsimilar Certifiedtruecopyto
nature job carriedout be attached
STATEMENTNO.–4/A
BIDDER’SFINANCIALCAPACITY
Turnover in NetCash
Sr.No. FinancialYear worth Capital
Engineering Rs.
1) Figures to be taken from audited balance sheets. Duly certified
attested true copy
2) Copiesofthebalancesheettobeattached..
3) Thebiddershallhavetoprovidethatforaperiodofatleast1
Monthsthebidderhasabilitytosustainnegativecashbalance and
how he proposes to meet with the same.
4) CashPlan/CashflowStatement.
STATEMENTNO.–4/B
AVAILABLEBIDCAPACITY
Theavailablebidcapacitywillbeworkedoutasfollows.
Availablebidcapacity=(AxNx2)–B,
A=Maximumof updatedtotal amount of work executedin any one year of
A=Maximumof updatedtotal amount of work executedin any one year of
the last five financialyears.
B=Theamountoftheexistingcommitmentsandongoingworkstobe discharge
during timeintervalof N years fromthebidduedate.
N=Numberofyearsprescribedforcompletionoftheproposedworks
LIST OF SINGLE PROJECT WORK OF NOT LESS THAN OF THE ESTIMATED
COST COMPLETED DURING THE LAST SEVEN YEARS.
Sr. Nameof Tot Tot Date Date of
No Year of Nameof owner& al al of Actual
. Construc Project contact cost valu starti completio
t ion person of eof ng n of work
work of the the wor work
Note:Certificatefromtheownersinsupportofaboveworksmaybe enclosed
with this statement.
STATEMENTNO.5/A
Detailed information of similar type of work costing not less than 50% of tender amountcompleted
withgoodqualityandworkmanshipin thepastsevenyears.
Name of Contractor:
Sr. Nam Nam Estimate Tender Date Target Actual Reas Amount of work done Amount of Remarks
No e of e of dcost ed of date of date of on during last sevenyears workdone
. wor clien o f work amount award completi completi for preceding this tender afterMarch
k t (Rs. Rs. of on on delay (Rs. Lakhs).
Lakhs) (Lakhs) contra (Rs.
Note:Certificatefromtheownersinsupportofaboveworksmaybeenclosedwiththisstatement.
STATEMENTNO–5/B
DETAILSOFIMPORTANTCONSTRUCTIONPROJECTS
Sr. Nameof Estimat Prescribed ActualCompletion Actual Name,
No Project ed time of Completion address
. cost performance Cost Rs. and
Start Completion Start Completion
Date Date Date Date
Note:Certificatefromtheownersinsupportofaboveworksmaybeenclosedwiththisstatement.
STATEMENTNO.–5/C
DETAILSOFONGOINGPROJECT
Sr. Nameofproject Value of Start Likely date Name, address,
No remaining date of telephone, fax no. of
workRs.in completion project authority and
lakhs. contact person.
DETAILS OF PLANT & MACHINERY TO BE DEPLOYED ON THIS
Nameofthecontractor/company
Sr. Name of available Present value of
No plants/machinery (withmake location plant/
& year) machineries
Plant/machinerieswhichareproposedtobeprocuredshallhaveto be
procured at the earliest after award of the work and before the
start of the work.
METHODSTATEMENTANDWORKPLAN
The Bidder shall have to provide a brief write up to be enclosed with
the “Technical Bids” covering his approach and methodology to handle
the project construction activities including his details work plan. The
brief shall include the following aspects.
2. Constructionequipmentavailability and
plan of deployment.
3. PERT/Constructionchart/Barchart.
ApplicationForm(1)
GeneralInformation
All individual firms and each partner of a consortium applying for
qualification are requested to complete the information in this form.
Nationalityinformationtobeprovidedforallownersorapplicantswhoare
partnerships or individually-owned firms.
Where the Applicant proposes to use named subcontractors for critical
componentsoftheworks,orforworkcontentsinexcessof10percentof the
value of the whole works the following information should also be
supplied for the specialist subcontractor(s).
2. Headofficeaddress
3. Telephone Contact
5. Placeofincorporation/registration Year of incorporation/
Nationalityofowners
Name Nationality
NameofBiddersofficers/Personstobecontacted
Name. Address PhoneNos. Fax.
ApplicationForm(1A)
StructureandOrganization
aproprietaryfirm
afirminpartnership
aLimitedCompanyorCorporation
agroupoffirms/consortium(ifYes,give
completion information in respect of
Attach the Organization Chart showing
the structure of the organization
includingthenamesoftheDirectorsand
position of officers
Numberofyearsofexperience:
as a Prime Contractor (contractor
shouldering major responsibility
othercountries(specifycountry)
othercountries(Specifycountry)
as a sub-contractor (specify main
othercountries(Specifycountry)
4. Name and address of any associates
theapplicanthasinIndia(incasethe
applicant happens to be from foreign
country)whoareknowledgeablein the
procedures of customs,
immigration,taxesandother
informationnecessarytodothework.
For how many years has your
organization been in business of
similar work under its present name?
What were your fields when your
organization was established?
Whetheranynewfieldswereaddedin
your organization? And if so, when?
5.Wereyoueverrequiredtosuspend
constructionforaperiodofmorethan
sixmonthscontinuouslyafteryou
started? If so, give the name of
project and give reasons thereof.
6. Have you ever left the work awarded
to you incomplete? If so, give name of
project and reasons for not completing
In which fields of civil engineering
construction do you claim specialization
Give details of your experience in
mechanized cement concrete lining and
in modern concrete technology for
manufacture and quality control.
Givedetailsofyourexperienceinusing
heavy earth moving equipment and
quality control in compaction of soils.
Give details of your experience in
Underground Drainage work in rocky
Givedetailsofcivilworkfordrainage
pumping station
Givedetailsforconstructionofsewerage
treatment plant
Givedetailsforpumpingmachineryin
drainage pumping station
GENERALCONDITIONS
::TABLEOFCONTESTS::
No. Description
GC-1 DefinitionsandInterpretations
GC-2 Locationofsiteandaccessibility
GC-3 Scopeofwork
GC-4 Rulinglanguage
GC-5 InterpretationofContractDocument
GC-6 Contractortounderstandhimselffully
GC-7 Errorsinsubmissions
GC-8 SufficiencyofE-TENDER
GC-9 Discrepancies
GC-10 PerformanceGuarantee(Security Deposit)
GC-11 Inspectionofwork
GC-12 DefectLiability
GC-13 PowerofEngineer-In-Chargetogivefurtherinstructions.
GC-14 Programme
GC-15 Sub-lettingof work
GC-16 Sub-Contractsfortemporaryworks, etc.
GC-17 Timeforcompletion
GC-18 Extensionoftime
GC-19 ContractAgreement
GC-20 Liquidateddamages
GC-21 ForfeitureofSecurityDeposit
GC-22 ActionofForfeitureofSecurityDeposit
GC-23 Nocompensationforalterationinorrestrictioninwork
GC-24 Intheeventofdeathofcontractor
GC-25 Membersoftheownernotindividuallyliable
GC-26 Ownernotboundbypersonalrepresentations
GC-27 Contractor'soffice at site
GC-28 Contractor'ssubordinatestaff andtheirconduct
GC-29 Terminationofsub-contractbyowner
GC-30 Powerofentry
GC-31 Contractor'sresponsibility withtheotherContractorand
GC-32 OtherAgenciesatsite
GC-34 Rightsofvariousinterests
GC-35 Priceadjustments
GC-36 TermsofPayment
GC-37 RetentionMoney
GC-38 PaymentsduefromtheContractor
GC-39 Contingent Fee
GC-40 BreachofContractbyContractor
GC-41 DefaultofContractor
GC-42 Bankruptcy
GC-43 Ownership
GC-44 Declarationagainstwaiver
GC-45 Lawsgoverningthecontract
GC-46 Overpaymentandunderpayment
GC-47 Settlementofdisputes
GC-48 Disputesofdifferencestobereferredto
GC-49 Arbitration
GC-50 TerminationoftheContract
GC-51 Specialrisks
GC-52 ChangeinConstitution
GC-53 Sub-contractualrelations
GC-54 PatentsandRoyalties
GC-56 Executionofwork
GC-57 Workinmonsoon
GC-58 WorkonSundaysandHolidays
GC-59 GeneralConditionsfor constructionwork
GC-60 DrawingstobesuppliedbytheOwner
GC-61 DrawingstobesuppliedbytheContractor
GC-62 Settingoutwork
GC-63 ResponsibilitiesofContractorforcorrectnessofwork
GC-64 MaterialstobesuppliedbytheOwner
GC-65 ConditionsofissueofmaterialsbytheOwner
GC-66 MaterialsprocuredwithassistanceoftheOwner
GC-67 Materialsobtainedfromdismantling
GC-68 Articleofvalueoftreasurefoundduringconstruction
GC-69 Discrepanciesbetweeninstructions
GC-70 Alternations inspecificationsand designs andextrawork.
GC-71 Actionwhennospecificationsareissued
GC-72 Abnormalrates
GC-73 AssistancetoEngineer-In-Charge
GC-74 Testsforqualityofwork
GC-75 Actionandcompensationincaseofbadworkmanship
GC-76 Suspensionwork
GC-77 Ownermaydopartofthework
GC-78 Possessionpriortocompletion
GC-79 CompletionCertificate
GC-80 ScheduleofRates
GC-81 Procedureformeasurementofworkinprogress
GC-82 Runningaccountpaymentstoberegardedasadvances
GC-83 Noticeforclaimforadditionalpayment
GC-84 PaymentofContractor'sBill
GC-85 FinalBill
GC-86 Receiptforpayment
GC-87 CompletionCertificate
GC-88 Taxes,Duties,etc.
GC-89 Insurance
GC-90 DamagetoProperty
GC-91 ContractortoIndemnifyOwner
GC-92 Implementation ofApprenticeAct1954
GC-93 HealthandSanitaryarrangementsforworkers
GC-94 SafetyCode
GC-95 Accidents
GC-01 DEFINITIONSANDINTERPRETATIONS :
1.0 In the contract (as hereinafter defined) the following words and
expressionsshall,unlessrepugnanttothesubjectorcontextthereof,have the
following means as signed to them.
1.1 The "Owner / Corporation" shall mean Rajkot Municipal Corporation and
shall include its Municipal Commissioner or other Officers authorized by
the Corporation and also include owner's successors and assignees.
1.2 The "Contractor" shall mean the person or the persons, firm or Company
whose e-Tender has been accepted by the Owner and includes the
Contractors legal representative, his successors and permitted assigned.
1.4 The "Engineer-In-Charge" shall mean the person designated as such by
the owner from time to time and shall include those who are expressly
authorized by the Corporation to act for and on its behalf for all functions
pertaining to the operation of this contract.
1.5 Engineer-In-Charge's Representative shall mean any resident Engineer or
Assistant to the Engineer-In-Charge appointed from time to time by the
owner to perform duties set forth in the E-TENDER Document whose
authority shall be notified in writing to the Contractor by the Engineer-In-
1.6 "E-TENDER" – the offer or proposal of the Bidder submitted in the
prescribed form setting for the prices for the work to be performed, and
the details thereof.
1.7 "Contract Price" shall mean total money payable to the Contractor under
the contract. (This includes estimated amount as well as GST and
Contractors’ premium)
1.8 "Addenda" shall mean the written or graphic notices issued prior to
submissionofe-Tenderwhichmodifyorinterpretthecontractdocuments.
1.9 "ContractTime"–thetimespecifiedforthecompletionofwork.
1.10 "Contract"shallmean agreementbetweenthepartiesfor theexecution of
works including therein all contract documents.
1.11 "Contract Document" shall mean collectively the e-Tender documents,
designs, drawings, specifications, agreed variations, if any and such other
documents constituting the e-Tender and acceptance thereof.
1.12 "TheSub-Contractor"shallmeananyperson,firmorcompany(otherthan the
Contractor) to whom any part of the work has been entrusted by the
Contractor with the written consent of the Engineer-In-Charge and the
legal representative successors and permitted assignee of such person,
firm or company.
1.13 The "Specifications" shall mean all directions, the various Technical
Specifications,provisionsandrequirementsattachedtothecontractwhich
pertains to the method and manner of performing the work, to the
quantities and qualities of the work and the materials to be furnished
under the contract for the work and any order(s) or instruction(s) there
under. ItshallalsomeanthelatestIndianStandardInstituteSpecification
relative to the particular work or part thereof, so far as they are not
contrary to the E-TENDER specifications and in absence of any other
CountryappliedinIndianasamatterofstandardengineeringpracticeand
approved in writing by the Engineer-In-Charge with or without
1.14 The "Drawings" shall include maps, plans, tracings, or prints thereof with
any modification approved in writing by the Engineer-In-Charge and as
such other drawings as may, from time to time, be furnished or approved
in writing by the Engineer-In-Charge in connection with the work.
1.15 The "Work" shall mean the works to be executed in accordance with the
contract or the part thereof as the case may be and shall include extra,
additional, altered or substituted works as required for the purpose of the
contract.Itshallmeanthetotalityoftheworkbyexpressionorimplication
envisaged in the contract and shall include all materials, equipment and
labour required for or relative or incidental to or in connection with the
commencement, performance and completion of any work and / or
incorporation in the work.
1.16 The"PermanentWork"shallmeanworkswhichwillbeincorporatedinand
formpartoftheworktobehandedovertotheownerbytheContractoron
completion of the contract.
1.17 The "Temporary Work" shall mean all temporary works of every kind
required in or about the execution, completion and maintenance of the
1.18 "Site" shall mean the land andother places, on, under, in or through which
the permanent works are to be carried out and any other lands or places
provided by the Corporation for the purpose of the contract together with
any other places designated in the contract as forming part of the site.
1.19 The "Construction Equipment" shall mean all appliances / equipment of
whatever nature required in or for execution, completion or maintenance
of works or temporary works (as herein before defined) but does not
include materials or other things intended to form or forming part of the
permanent work.
1.20 "Notice in writing or written Notice" shall mean a notice written,
typed or in printed form delivered personally OR sent by Registered Post
to the last known private or business address or Registered Office of the
Contractor OR through e-mail OR mobile message shall be deemed to
have been received in the ordinary course of post it would have been
1.21 The "Alteration / variation order" shall mean an order given in writing by
theEngineer-In-Chargeto effectadditionsor deletionsfrom or alterations in
1.22 "Final Test Certificate" shall mean the final test certificate issued by the
owner within the provisions of the contract.
1.23 The "Completion Certificate"shallmean the certificate to be issued by the
Engineer-In-Charge when the work has been completed and tested to his
1.24 The "Final Certificate" shall mean the final certificate issued by the
Engineer-In-Charge after the period of defects liability is over and the
work is finally accepted by the owner.
1.25 "DefectsLiabilityPeriod"shallmeanthespecifiedperiodbetweentheissue of
CompletionCertificate andthe issue of finalcertificate duringwhich the
Contractor is responsible for rectifying all defects that may appear in the
1.26 "Approved" shall mean approved in writing including subsequent
confirmation in writing of previous verbal approval and "Approval" means
approved in writing including as aforesaid.
1.27 "Letter of Acceptance" shall mean an intimation by a letter to Bidder that
his e-Tender has been accepted in accordance with the provisions
contained therein.
1.28 "Order" and "Instructions" shall respectively mean any written order or
instructiongivenbytheEngineer-In-Chargewithinthescopeofhispowers in
terms of the contract.
1.29 "Running Account Bill" shall mean a bill for the payment of "On Account"
money to the Contractor during the progress of work on the basis of work
done and the supply of non-perishable materials to be incorporated in the
1.30 "Security Deposit" shall mean the deposit to be held by the owner as
security for the due performance of the contractual obligations.
1.31 The "Appointing Authority" for the purpose of Arbitration shall be the
Municipal Commissioner, Rajkot Municipal Corporation.
1.32. "Retention Money" shall mean the money retained from R.A.Bills for the
due completion of the "LET WORS".
1.33 Unlessotherwisespecificallystated,themasculinegendershallincludethe
feminine and neuter genders and vice-versa and the singular shall include
the plural and vice-versa.
GC-02 LOCATIONOFSITEANDACCESSIBILITY:
The intending bidders should inspect the site & make thyself
familiar with site conditions and available communication facilities.
Non-availability of access roads shall in no case be the cause to
condone delay in the execution of the work and no claim or extra
compensation will be paid.
GC-03 SCOPEOFWORK:
The scope of work is defined broadly in the special conditions of contract
and specifications. The Contractor shall provide all necessary materials,
equipmentandlabouretc.fortheexecutionandmaintenanceofthework. All
material that go with the work shall be approved by the Engineer-In-
Charge prior to procurement and use.
The Contractor shall make his own arrangement for power supply during
LandforContractor'sFieldOffice,GodownEtc.:
Owner will not be in a position to provide land required for Contractor's
field office, godown, etc. The Contractor shall have to make his own
arrangement for the same.
GC-04 RULINGLANGUAGE:
The language according to which the contract shall be construed and
interpreted shall be English. All entries in the contract document and all
correspondence between the contractor and the Corporation or the
Engineer-In-Charge shall be in English/Gujarati. All dimensions for the
materials shall be given in metric units only.
GC-05 INTERPRETATIONOFCONTRACTDOCUMENT:
1. TheprovisionoftheGeneralConditionsofContractandSpecialConditions
ofContractshallprevailoverthoseofanyotherdocumentsofthecontract unless
specifically provided otherwise, should have there be any discrepancy,
inconsistency, error or omission in the several documents forming the
contract, the matter may be referred to the Engineer-In-
Chargeforhisinstructionsanddecision.TheEngineer-In-Charge'sdecision in
such case shall be final and binding to the Contractor.
2. Worksshownuponthedrawingsbutnotdescribedinthespecificationsor
described in the specifications without showing on the drawings shall be
taken as described in the specifications and shown on the drawings.
3. The headings and the marginal notes to the clause of these General
Conditions of Contract or to the specifications or to any other part of e-
Tenderdocumentsaresolelyforthepurposeofgiving aconcise indication
andnotasummaryofcontentsthereof.Theyshallneverbedeemedtobe part
thereof or be used in the interpretation or construction of the contract.
4. Unless otherwise states specifically, in this contract documents the
singular shall include the plural and vice-versa wherever the context so
requires. Works imparting persons shall include relevant Corporations /
Body of individual / firm of partnership.
5. Notwithstanding the sub-division of the documents into separate section
and volumes every part of each shall be supplementary to and
complementary of every other part and shall be read with and into the
context so far as it may be practicable to do so.
6. WhereanyportionoftheGeneralConditionsofContractisrepugnanttoor
atvariancewithanyprovisionsoftheSpecialConditionsofContract,then, unless
a different intention appears, the provisions of the special conditions of
contract shall be deemed to over ride the provisions of General Conditions
of Contract to the extent of each repugnancy of variance.
7. The materials, design, and workmanship shall satisfy the relevant IS, and
codes referred to. If additional requirements are shown in the
specifications, the same shall be satisfied over and above IS and other
8. IfthespecificationsmentionthattheContractorshallperformcertainwork
orprovidecertainfacilities,itshallmeanthattheContractorshalldosoat his own
9. ContractortoCollectHisOwnInformation-
The details given in the e-Tender are arranged making necessary
investigations for framing an estimate. However, when the work is being
executed,changesinsoilconditionsarelikelytobemetwithinviewofthe
formation of soil, strata in Rajkot District. It is, therefore, desirable that
theContractormakeshisowninvestigationsoradditionalinvestigationsas
maybe required forcorrectly assessing the cost ofdifferent items ofwork
andsubmithise-Tenderaccordingly.Anychangeindescriptionorquantity of an
item shall not vitiate the contract or release the Contractor from
executing the work comprised in the contract according to the drawings
and specifications at the e-Tendered rates.
He is deemed to have know the scope, nature and magnitude of the work
andtherequirementsofmaterialsandlabourinvolved andastowhatever
workhehastocompleteinaccordancewiththecontract.TheContractoris
expected to visit the site and surroundings to satisfy himself as to the
nature of all existing structures, if any, and also as to the nature and the
conditionsofrailways,roads,bridgesandculverts,meansoftransportand
communications whether by land, air or water and as to possible
interruptions thereto and the access and gross from the site, to have
examined and satisfied himself as to the sites for obtaining sand, stones,
bricks and other materials, the site for disposal of surplus materials, the
available accommodation and make such enquiries as may be necessary
for executing and completing the work, to have local enquiries as to the
sub-soil, subsoil water and variation thereof, storms, prevailing winds,
climatic conditions and all other similar matters, effecting work. He is
expectedtobefamiliarwithhisliabilityforpaymentofGovernmenttaxes,
customs and excise duty and other charges etc. in contract with the
execution of this contract.
GC-06 CONTRACTORTOUNDERSTANDHIMSELFFULLY :
The Contractor by e-Tendering shall be deemed to have satisfied himself,
asto allconsiderations andcircumstancesaffectingthee-Tenderprice, as to
the possibility of executing the works as shown and described in the
contract and to have fixed his prices according to his own view on these
matters and to have understood that no additional allowances except as
otherwiseexpresslyprovided,willafterwardsbemadebeyondthecontract
price. The Contractor shall be responsible for any misunderstanding or
incorrect information, however, obtained.
GC-07 ERRORSINSUBMISSIONS:
The Contractor shall be responsible for any errors or omissions in the
particulars supplied by him, whether such particularshave been approved
by the Engineer-In-Charge or not.
GC-08 SUFFICIENCYOFe-TENDER:
The Contractor shall be deemed to have satisfied himself before e-
Tendering as to the correctness of the e-Tender rates which rates shall,
except as otherwise provides for, cover all the Contractor's liabilities and
obligations set forth or implied in the contract for the proper execution of
the work for compliance with requirements of Article GC-19 thereof.
GC-09 DISCREPANCIES:
The drawings and specifications are to be considered as mutually
explanatory of each other, detailed drawings being followed in
preference to small-scale drawings and figured dimensions in
preference to scale andspecial conditions in preference to General
Conditions. The special directions or dimensions given in the
specifications shall supercede all else. Should any discrepancies
however, appear or should any misunderstanding arise as to the
meaning and intent of the said specifications or drawings, or as to
thedimensionsorthequalityofthe materialsorthedueandproper
execution of the works, or as to the measurement or quality and
valuation of the work executed under this contract or as extra there
upon, the same shall be explained by the Engineer-In-Charge and
his explanation shall be subject to the finaldecision of the Municipal
Corporation in case reference be made to it, be binding upon the
Contractor and the Contractor shall execute the work according to
such explanation and without addition or to deduction from the
contract price and shall also do all such works and things necessary
forthe proper completion of the works as implied by the drawings
and specifications, even though such works and things are not
specially shownand described in the said specifications. In cases
where no particular specifications are given for any article to be
used under the contract, the relevant specifications of the Indian
Standard Institution shall apply.
GC-10 PERFORMANCEGUARANTEE(SECURITYDEPOSIT)
As a contract security the Bidder to whom the award is made shall furnish a
performance guarantee (Security deposit) for the amount of 5% of the
contract price to guarantee the faithful performance, completion and
maintenance of the works of the contract in accordance with all conditions
and terms specified herein and to the satisfaction of the Engineer-in-charge
and ensuring the discharge of all obligations arising from the execution of
Additionalperformanceguaranteeispayableif,
3. the contract price offered by the selected bidder is lower than 10% but
upto 20% of the estimated project cost than the additional performance
security shall be calculated @ 20% of the difference in the estimated
project cost minus 10%of the estimated project cost and Contract price
offered by the selected bidder.
4. the contractpriceofferedbytheselectedbidderislowerthan20%ofthe
Estimated project cost than the additional performance security shall be
calculated @ 30% of the difference in the Estimated project cost minus
10%of the Estimated project cost and Contract price offered by the
selected bidder.
This additional performance security shall be treated as part of the
performance security.
Performance security shall be valid beyond 60 days of the defect liability
periodandtheadditionalperformancesecurityshallbevalidbeyond28days of
project completion date.
Final SD will be calculated at the time of final bill i.e. actual completion
Performanceasmentionedabovemaybeintheformsmentionedbelow:
d) By a Demand Draft on the Rajkot Branch of any Nationalized Bank or
Scheduled Bank except co-operative bank.
e) A fixed deposit receipt of any Schedule Bank or Nationalized Bank
(except Co-operative Bank) duly endorsed in favour of the
RajkotMunicipal Corporation, Rajkot.
f) ABankGuaranteefromRajkotBranchofanyNationalizedBankorScheduled
Bank except co-operative bank.
TheperformanceguaranteeshallbedeliveredtotheCorporationwithinten
(10) days of the notice of award and at least three (3) days before the
contract agreement is signed unless otherwise specified by the Engineer-in-
charge. Alternatively, the contractor may at his option deposit an amount of
2.5% of the value of the contract price within ten days and the balance
2.5% to be recovered in installments through deduction @ the rate of 10%
from the running account bills. It is further clarified that Performance
Guarantee (SD) forextra work willalsoberecovered@ 10% from thebillof
extraworki.e.worksbeyondtenderamount.
On due performance and completion of the contract in all respects, THE
PERFORMANCE GUARANTEE (SECURITY DEPOSIT) WILL BE RELEASED TO
THE CONTRACTOR WITHOUT ANY INTEREST AFTER DEFECT LIABILITY
PERIOD IS OVER.
GC-11 INSPECTIONOFWORK:
1. The Engineer-In-Charge shall have full power and authority to inspect the
work at any time wherever in progress either on the site or at the
Contractor's or any other manufacturer's workshop or factories wherever
situated and the Contractor shall afford to Engineer-In-Charge every
facility and assistance to carry out such inspection, Contractor or his
authorizedrepresentativeshall, at all timeduring theusualworkinghours and
all times when so notified, remain present to receive orders and
Orders given to Contractor's representative shall be considered to have
the same force as if they had been given to the Contractor himself.
Contractor shall give not less than ten (10) days notice in writing to the
Engineer-In-Charge before covering up or otherwise placing beyond reach
of inspection and measurement any work in order that the same may be
inspected and measured. In the event of breach of the above, the same
shall be uncovered at Contractor's expenses for carrying out such
inspection or measurement.
2. The material shall be dispatched from Contractor's store on site of work
beforeobtainingapprovalinwritingoftheEngineer-In-Charge.Contractor shall
provide at all times during the progress of work and maintenance period
of proper means of access with ladders, gangways, etc. and make
necessaryarrangementasdirectedforinspectionormeasurementofwork by
Engineer-In-Charge.
GC-12 DEFECTLIABILITY:
1. Contractor shall guarantee the work for a period of 60 Months. Any
damage or defect that may arise or that may remain undiscovered at the
time of issue of Completion Certificate connected in any way with the
equipment or materials supplied by him or in the workmanship shall be
rectified or replaced by Contractor at his own expense as desired by
Engineer-In-Chargeor indefaultEngineer-In-Chargemaycausethesame to
be made good by other agency and deduct expenses of which the
certificate of Engineer-In-Charge shall be final from any sums that may
thenor any timethereafter becomeduetoContractor or from hissecurity
deposit or the proceeds of sale thereof or of a sufficient portion thereof.
2. From the commencement to completion of work Contractor shall take full
responsibilityforthecareoftheworkincludingalltemporaryworksandin case
any damages, occur from any cause whatsoever he shall at his own
cost,repair andmakegoodthesamesothatoncompletion,workshallbe
ingoodorderandinconformity,ineveryrespect,withtherequirementsof
contract and as per the instructions of the Engineer-In-Charge.
3. Ifatanytimebeforetheworkistakenover,theEngineer-In-Charge-
a) Decide that any work done or materials used by the Contractor are
defective or not in accordance with the contract or that work or any
portion thereof is defective or do not fulfill the requirements of contract
(allsuchmaterialsbeinghereinaftercalleddefectsinthisclause)heshall,
as soon as reasonably practicably, give notice to Contractor in writing of
the said defect specifying particulars of the same then Contractor shall at
his own expense and with all speed make good the defects so specified.
b) In case Contractor fails to do so, owner may take, at the cost of the
Contractor,suchstopsasmayinallcircumstancesberesponsibletomake
goodsuchdefects.Theexpendituresoincurredbyownerwillberecovered from
the amount due to Contractor. The decision of Engineer-In-Charge with
regard to the amount to be recovered from Contractor will be final and
binding on the Contractor.
GC-13 POWER OF ENGINEER-IN-CHARGE TO GIVE
FURTHERINSTRUCTIONS:
The Engineer-In-Charge shall have the power and authority from time to
time and at all times to give further instructions and directions as may
appear to him necessary or proper for the guidance of the Contractor and
the works and efficient execution of the works according to the terms of
the specifications, and the Contractor shall receive, execute, obey and be
bound by the same, according to the true intent and meaning thereof, as
fully and effectively as though the same had accompanied or had been
mentioned or referred to in the specifications. No work which radically
changes the original nature of the contract shall be ordered by the
Engineer-In-Chargeandintheeventofanydeviationbeingordered,which in
the opinion of the Contractor changes the original nature of the
contract,heshallneverthelesscarryitoutandanydisagreementastothe nature
of the work and the rate to be paid to thereof shall be resolved.
Thetimeofcompletionofworksshall,intheeventofanydeviations being
ordered resulting in additional cost or reduction in cost over the contract
sum, be extended or reduced reasonably by the Engineer-In-Charge. The
Engineer-In-Charge's decision in the case shall be final and binding.
GC-14 PROGRAMME:
The time allowed for execution of works shall be the essence of the
contract. The contract period shall commence from the date of notice of
intimation to proceed. The Bidder at the time of submitting his e-Tender
shall indicate in the construction schedule his programme of execution of
work commencement with the total time specified. The Contractor shall
providetheEngineer-In-Chargeadetailedprogrammeoftimeschedulefor
execution of the works in accordance with the specifications and the
completion date. The entire programme to be finalized by the Contractor,
has to conform to the execution period mentioned along with the Bill of
Quantities in the e-Tender documents. The Engineer-In-Charge upon
scrutiny of such submitted programme by Contractor, shall examine
suitabilityofittotherequirementofcontractandsuggestmodifications,if found
GC-15 SUB-LETTINGOFWORK:
No part of the contract nor any share of interest thereon shall in any
manner or degree be transferred, assigned or sublet by the Contractor
directly or indirectly to any person, firm or Corporation whosoever except
as provided for in the succeeding sub-clause, without the consent in
writing of the owner.
GC-16 SUB-CONTRACTSFORTEMPORARYWORKSETC.:
The owner may give written consent to sub-contractors for execution of
any part of the works at the site, being entered upon the contractor
provided each individual contract is submitted to the Engineer-In-Charge
before being entered into and is approved by him. List of sub-contractors
to be supplied.
Not-withstanding any subletting with such approval as aforesaid and
notwithstanding the Engineer-In-Charge shall have received of any sub-
contractors,theContractorshallbeandshallremainsolelyresponsiblefor the
quality and proper and expeditious execution of the works and the
performance of all the conditions of contract in all respects as if such
subletting or subcontracting had not taken place and as if such works had
been done directly by the Contractor.
GC-17 TIMEFORCOMPLETION:
1. The work covered under this contract shall be commenced from the date
the Contractor is served with a notice to proceed with the work and shall
be completed before the date as mentioned in the time schedule of work.
The time is the essence of the contract and unless the same is extended
as mentioned in Clause GC-18 "Extension of Time", the Contractor shall
pay liquidated damages for the delay.
2. The general time schedule for construction is given in the e-Tender
document. Contractor shall prepare a detailed weekly or monthly
constructionprogrammeinconsultationwiththeEngineer-In-Chargesoon
after the agreement and the work shall be strictly executed accordingly.
The time for construction includes, the time required for testing,
rectifications,ifany,retestingandcompletionoftheworkinallrespectsto the
entire satisfaction of the Engineer-In-Charge except the items which are
not coming in the way to commission the project.
3. Monsoonperiodfrom1stJulyto30thSeptembershallbeconsidered as non-
working period hence excluded in time limit.
GC-18 EXTENSIONOFTIME:
Time shall be considered as the essence of the contract. If, however, the
failure of the Contractor to complete the work as per the stipulated dates
referred to above arises from delays on the part of Corporation in
supplying the materials or equipment, it has undertaken to supply under
the contract or from delays on the quantity of work to be done under the
contract, or force majeure an appropriate extension of time will be given
bythe Corporation. The Contractor shallrequest for suchextensionwithin
onemonthofthecause ofsuchdelayand inany casebeforeexpiryofthe
contract period.
GC-19 CONTRACTAGREEMENT:
ThesuccessfulBiddershallenterinto andexecutethecontractagreement
within10(ten)daysofthenoticeofaward,inthe formshownine-Tender
documents with such modifications as may be necessary in the opinion of
theCorporation. Itshall beincumbent ontheContractor topay the stamp
duty and the legal charges for the preparation of the contract agreement.
GC-20 LIQUIDATEDDAMAGES:
If the Contractor fails to complete the work or designated part thereof
within the stipulated completion date for the work or for the part, he shall
pay liquidated damages at 0.1 (zero point one) percent of contract value
for per day of delay subject to maximum of 10% of the contract value or
as decided by Municipal Commissioner.
The Contractor shall complete one-sixth quantum of work within one
fourth period, four-tenth quantum of work within one-half period and
eight-tenth quantum of work within three-fourth period, failing which, the
Contractor shall be liable to pay liquidated damages an amount as
specified above, or as decided by Municipal Commissioner.
The amount of liquidated damages shall, however, be subjected to a
maximum of 10 percent of the contract value.
GC-21 FORFEITUREOFSECUEITYDEPOSIT:
Whenever any claim against the Contractor for the payment of a sum of
money out of or under the contract arises, the Corporation shall be
entitled to recover such sum by appropriating in part or whole, the
security deposit of the Contractor. In case the security deposit is
insufficient, the balance recoverable shall be deducted from any sum then
due or which at any time thereafter may become due to the Contractor.
The Contractor shall pay to the owner on demand any balance remaining
GC-22 ACTIONOFFORFEITUREOFSECURITYDEPOSIT:
In any case in which under any Clause or Clauses of the contract, the
Contractor shall committed a breach of any of the terms contained in this
contract,theownershallhavepowertoadoptanyofthefollowingcourses as he
may deem best suited to his interest.
a) To rescind the contract (of which recession notice in writing to the
contractor under the hand of the owner shall be conclusive evidence) in
which case the security deposit of the Contractor shall stand forfeited and
be absolutely at the disposal of the owner.
b) To employ labour and to supply materials to carry out the balance work
debiting Contractor with the cost of labour employed and the cost of
materials supplied for which a certificate of the Engineer-In-Charge shall
be final and conclusive against the Contractor and 10% of costs on above
tocoveralldepartmentalchargesandcreditinghimwiththevalueofwork done
at the same rates as if it has been carried out by the Contractor under the
terms of his contract. The certificate of Engineer-In-Charge as to the
value of the work done shall be final and conclusive against the
c) Tomeasureuptheworkofthecontractorandtotakesuchpartthereofas shall be
unexecuted out of his hand and give it to another Contractor to complete,
the same. in this case the excess expenditure incurred than what would
have been paid to the original Contractor, if the whole work had been
executed by him, shall be borne and paid by the original Contractor and
shall be deducted from any money due to him by the
ownerunderthecontractorotherwiseandfortheexcessexpenditure,the
certificate of the Engineer-In-Charge shall be final and conclusive.
In the event any of the above courses being adopted by the owner, the
Contractorshallhavenoclaimsforcompensationforanylosssustainedby him
by reason of his having purchased or procured any materials or
enteredintoanyagreementsormadeanyadvanceonaccountoforwitha view to
the execution of the work or the performance of the contract.
In purchase the Contractor shall not be entitled to recover or be paid any
sum for any work actually performed under this contract unless the
Engineer-In-Charge will certify in writing the performance of such work
andthevaluepayableinrespectthereofandheshallonlybeentitledtobe paid the
value so certified.
In the event of the owner putting in force the powers as stated in a, b, c,
abovevestedinhimundertheproceedingclause,hemay,ifhesodesires, take
possession of all or any tools and plant, materials and stores in or upon
the works or the site thereof belonging to the Contractor, or procured by
him and intended to be used for the execution of the work or
anypartthereofpayingorallowingforthesameinaccountatthecontract rates to
be certified by the Engineer-In-Charge. The Engineer-In-Charge
maygivenoticeinwritingtotheContractororhisrepresentativerequiring him to
remove such tools, plant, materials or stores from the premises within the
time specified in the notice and in the event of the Contractor failing to
comply with any such notice, the Engineer-In-Charge may remove them
at the Contractor's expenses or sell them by auction or private sale on
account of the Contractor and his risks in all respects
withoutanyfurthernoticeastothedate,timeorplaceofthesaleandthe certificate
of Engineer-In-Charge as to the expense of any such removal and the
amount of the proceeds and the expenses of any such sale shall be final
and conclusive against the Contractor.
GC-23 COMPENSATIONFORALTERATIONINORRESTRICTIONINWORK:
If at any time from the commencement of the work, the owner shall for
any reasons whatsoever not require the whole work or part thereof as
specified in the e-Tender to be carried out, the Engineer-In-Charge shall
givenoticeinwritingofthefacttotheContractor,whoshallhavenoclaim to any
payment or compensation whatsoever on account of any profit or
advantagewhichhe mighthave derivedfrom the executionof thework in full
but which he did not derive in consequence of full amount of the work not
having been carried out. He also shall not have any claim for
compensation by reasons of any alterations having been made in original
specifications, drawings, designs and instructions which shall involve any
curtailment of the work as originally contemplated.
When the Contractor is a partnership firm, the prior approval in writing of
theownershallbeobtainedbeforeanychangeismadeintheConstitution of the
firm. Where the Contractor is an individual or a Hindu Undivided Family or
business concern, such approval as aforesaid shall, likewise be obtained
before Contractor enters into an agreement with other parties where
under, the reconstituted firm would have the right to carry out the
workherebyundertakenbytheContractor.Ineithercase,ifpriorapproval as
aforesaid is not obtained, the contract shall be deemed to have been
allottedcontraventionofsublettingclausehereofandthesameactionmay be
taken and the same consequence shall ensure as provided in the
subletting clause.
GC-24 INTHEEVENTOFDEATHOFTHECONTRACTOR:
Without prejudice to any of the rights or remedies under the contract, if
the Contractor dies, the owner shall have the option of terminating the
contract without compensation to the Contractor.
GC-25 MEMBERSOFTHEOWNERNOTINDIVIDUALLYLIABLE:
No officialor employee of the owner shall in any way be personally bound
or liable for the acts or obligation of the owner under the contract, or
answerable for any default or omission in the observance or performance
of any acts, matters or things, which are herein, contained.
GC-26 OWNERNOTBOUNDBYPERSONALREPRESENTATIONS :
The Contractor shall not be entitled to any increase on the schedule of
rates or any other rights or claims whatsoever by reason of
representation,promiseorguaranteesgivenorallegedtohavebeengiven to
him by any person.
GC-27 CONTRACTOR'SOFFICEATSITE:
The Contractor shall provide and maintain an office at the site for the
accommodationofhisagentandstaff andsuchofficeshallremainopenat all
reasonable hours to receive information, notices or other communications.
GC-28 CONTRACTOR'SSUBORDINATESTAFFANDTHEIRCONDUCT:
1. The Contractor on award of the work shall name and depute a qualified
Engineer having experience of carrying out work of similar nature, whom
equipment’s, materials, if any, shall be issued and instructions for work
given. the Contractor shall also provide to the satisfaction of Engineer-In-
Charge sufficient and qualified staff, competent sub-agents, foreman and
loadinghandsincludingthosespeciallyqualifiedbypreviousexperienceto
supervise the type of works comprised in the contract in such manner as
will ensure work of the best quality and expeditious working. If, in the
opinionoftheEngineer-In-Chargeadditionalproperlyqualifiedsupervision
staff is considered necessary, it shall be employed by the Contractor,
without additional charge on account thereof. The Contractor shall ensure
to the satisfaction of the Engineer-In-Charge that sub-contractors, if any,
shall provide competent and efficient supervision over the work entrusted
2. If and whenever any of the Contractor's or sub-contractor's agents, sub-
agents,assistants,foremanorotheremployeesshall,intheopinionofthe
Engineer-In-Charge, be guilty of any misconduct or be incompetent or
insufficiently qualified or negligent in the performance of their duties or
that in the opinion of the owner or Engineer-In-Charge, it is undesirable
for administrative or any other reason for person or persons to be
employed in the works, the Contractor if so directed by the Engineer-In-
Charge, shall at once remove such person or persons from employment
thereon. Any person or persons so removed shall not again be re-
employed in connection with the works without the written permission of
the Engineer-In-Charge. Any person, so removed from the works shall be
immediately replaced at the expense of the Contractor by a qualified and
competent substitute. Should the Contractor be required to repatriate any
personremovedfrom the worksheshalldoso after approval of Engineer- In-
Charge and shall bear all costs in connection therewith.
3. TheContractorshallberesponsiblefortheproperbehaviorofallthestaff,
foreman,workmenandothersandshallexercisepropercontroloverthem and in
particular and without prejudice to the said generality, the Contractor
shall be bound to prohibit and prevent any employee from trespassing or
acting in any way detrimental or prejudicial to the interest of the
community or of the properties or occupiers of land and properties
in the neighborhood and in the event of such employees so trespassing,
the Contractor shall be responsible therefore and relieve the owner of all
consequent claims, actions for damages or injury or any other ground
whatsoever. The decision of the Engineer-In-Charge upon any matter
arising under this claim shall be final.
4. If and when required by the owner, the Contractor's personnel entering
upontheowner'spremisesshallbeproperlyidentifiedbybadgesofatype
acceptable to the owner which must be worn at all times on owner's
GC-29 TERMINATIONOFSUB-CONTRACTBYOWNER:
If any sub-contractor engaged upon the works at the site execute any
work which in the opinion of Engineer-In-Charge is not accordance with
the contract documents, the owner may by written notice to the
Contractor requesthimtoterminatesuch sub-contractandtheContractor
uponthereceiptof suchnoticeshallterminatesuchsub-contractsandthe latter
shall forthwith leave the works, failing which, the owner shall have the
right to remove such sub-contractors from the site.
No action taken by the owner under the above clause shall relieve the
Contractor of his liabilities under the contract or give rise to any right to
compensation, extension of time or otherwise.
GC-30 POWEROFENTRY:
If the Contractor shall not commence the work in the manner previously
described in the contract documents or if he shall at any time, in the
opinion of Engineer-In-Charge –
i) Failtocarryoutworksinconformitywiththecontractdocuments,or
ii) Failtocarryouttheworksinaccordancewiththetimeschedule,or
iii) Substantially suspend work or the works for a period of seven days
without authority from Engineer-In-Charge, or
iv) FailtocarryoutandexecutetheworktothesatisfactionoftheEngineer-
v) Fail to supply sufficient or suitable construction plant, temporary works,
labour, materials or things, or
vi) Commit breach of any other provisions of the contract on his part to be
performedorobservedorpersistsinanyoftheabovementionedbreaches
ofthecontractfor seven daysafternoticeinwritingshallhavebeengiven to the
Contractor by the Engineer-In-Charge requiring such breach to be
vii) Abandonthework,or
viii) During the continuance of the contract becomes bankrupt, make any
arrangementorcompromisewithhiscreditors,orpermit anyexecutionto
beleviedorgo into liquidationwhethercompulsoryorvoluntarynotbeing
merely a voluntary liquidation for the purpose of amalgamation or
reconstruction then in any such case.
The owner shall have the power to enter upon the works and take
possession thereof and of the materials, temporary works, constructional
plant and stores therein and to revoke the Contractor's license to use the
same and to complete the works by his agents, other Contractor or
workmen, torelatethesameupon any termstosuchotherpersonfirm or
Corporation as the owner in his absolute discretion may think proper to
employ, and for the purpose aforesaid to use or authorize the use of any
materials, temporary works, constructional plant, and stores as aforesaid
with making payments or allowance to the Contractor for the said
materials other than such as may be certified in writing by the Engineer-
In-Chargetobereasonableandwithoutmakinganypaymentorallowance
totheContractorfortheuseofsaidtemporaryworks,constructionalplant and
stock or being liable for loss or damage thereto. If the owner shall be
reason of his taking possession of the works or of the work being got
completed by other Contractor incurred excess expenditure be deducted
from any money which may be due for the work done by the Contractor
under the contract and not paid for. Any deficiency shall forthwith be
made good and paid to the owner by the Contractor and the owner shall
have power to sell in such manner and for such price as he may think fit
alloranyoftheconstructionalplant,materialsetc.,consistconstructedby or
belonging to and to recoup and retain the said deficiency or any part
thereof out of the proceeds of the sale.
CONTRACTOR'SRESPONSIBILITYWITHTHEOTHERCONTRACTORAN
Without repugnance to any other conditions, it shall be the responsibility
of the Contractor executing the work, to work in close co-operation and
co-ordination with other Contractors or their authorized representatives
and the Contractor will put a joint scheme with the concurrence of other
contractors or their authorized representatives showing the arrangements
for carrying hisportion of thework to theEngineer-In-Chargeandgetthe
approval. The Engineer-In-Charge before approving the joint scheme will
callthepartiesconcernedandmodifytheschemeifrequired.Noclaimwill be
entertained on account of the above. The Contractor shall conform in
allrespectswiththe provisionsof anystatutoryregulations,ordinances or
bylaws of any local or duly constituted authorities or public bodies which
may be applicable from time to time to works or any temporary works.
The Contractor s shall keep the owner indemnified against all penalties
and liabilities of every kind arising out of non-adherence to such statutes,
ordinance, laws, rules, regulations etc.
GC-32 OTHERAGENCIESATSITE:
The Contractor shallhave to execute the work in such place and condition
where other agencies will also be engaged for other works, such as site
grading, filling and leveling, electrical and mechanical engineering works
etc. No claim shall be entertained for works being executed in the above
AnynoticeunderthiscontractmaybeservedontheContractororhisduly
authorized representative at the job site or may be served by Registered
Post direct to the official address of the Contractor. Proof of issue of any
such notice could be conclusive of the Contractor having been duly
informed of all contents therein.
GC-34 RIGHTSOFVARIOUSINTERESTS:
The owner reserves the right to distribute the work between more than
one Contractors. Contractor shall co-operate and afford reasonable
opportunity to other Contractor s for access to the works, for the carriage
andstorageofmaterialsandexecutionof theirworks.Wheneverthework being
done by department of the owner or by other Contractor employed by the
owner is contingent upon work covered by this contract, the respective
rights of the various interests shall be determined by the Engineer-In-
Charge to secure the completion of various portions of the work in general
GC-35 PRICEADJUSTMENTS:
No adjustment in price shall be allowed and no price escalation will be
GC-36 TERMSOFPAYMENT:
The payment of bills shall be made progressively according to the rules
and practices followed by the Corporation. The progressive payment
unless otherwise provided in the contract agreement or subsequently
agreedtobythepartiesshallbemadegenerallymonthlyonsubmissionof a bill
by the Contractor in prescribed form of an amount according to the value
of the work performed less the price of materials supplied by owner
aggregate of previous progressive payments and as required by Clause
GC-37 (Retention of Money) herein. All such progressive payments shall
be regarded as payments by way of advance against final payment.
Payment for the work done by the Contractor will be based on the
measurement at various stages of the work, in accordance with the
condition at clause GC-81 (measurement of work in progress).
GC-37 RETENTIONMONEY:
Pursuance to clause GC-36 (Terms of Payment) any on at money due to
the Contractor for work done, Corporation will hold as Retention money
five (5) percent of the value of work. The retention money will not
normally be due for payment until the completion of the entire work and
till such period the work has been finally accepted by the Corporation and
a completion certificate issued by the Corporation in pursuant to Clause-
GC 79 (Completion Certificate).
GC-38 PAYMENTSDUEFROMTHECONTRACTOR :
All costs, damages or expenses, for which under the contract, Contractor
is liabletotheCorporation, may bededucted bytheCorporationfrom any
money due or becoming due to the Contractor under the contract or from
any other contract with the Corporation or may be recovered by action at
law or otherwise from the Contractor.
GC-39 CONTINGENTFEE:
i) The Contractor warrants that he has not employed a person to solicit or
secure the contract upon any agreement for a commission, percentage,
and brokerage contingent fee. Breach of this warranty shall give the
Corporationtherighttocancelthecontractortotakeanydrasticmeasure as the
Corporation may deem fit. The warranty does not apply to commissions
payable by the Contractor to establish commercial or selling agent for the
purpose of securing business.
ii) No officer, employer or agent of the Corporation shall be admitted to any
share or part of this contract or to any benefit that may rise there from.
GC-40 BREACHOFCONTRACTBYCONTRACTOR:
If the Contractor fails to perform the work under the contract with due
diligenceorshallrefuseorneglecttocomplywithinstructionsgiventohim in
writing by the Engineer-In-Charge in accordance with the contract, or
shall contravene the provisions of the contract, the Corporation may give
notice in writing to the Contractor to make good such failure, neglect, or
contravention. Should the Contractor fail to comply with such written
notice within 10 (Ten) days of receipt, it shall be lawful for the
Corporation, without prejudice to any other rights the Corporation may
haveunderthecontract,toterminatethecontractforallorpartofthe
works, and make any other arrangements it shall deem necessary to
complete the work outstanding under the contract at the time of
termination. In this event, the performance Bond shall immediately
become due and payable to the Corporation. The value of the work done
on the date of termination and not paid for shall be kept as deposit for
adjustment of excess expenditure incurred in getting the remaining work
completedandtheCorporationshallhavefreeuseofanyworkswhichthe
Contractormayhave atthesiteatthetimeoftermination ofthecontract.
If Contractor fails to carry out the work in timely manner as mentioned in
clause 20 (Liquidated damages), Rajkot Municipal Corporation may give
notice in writing to the Contractor to expedite the work, so that the work
can be completed as per time schedule. If Contractor fails to expedite the
workwithin10daysofreceiptofnotice,RajkotMunicipalCorporationmay
terminate the contract and debar the Contractor for three years and the
remainingworkwillbeexecutedthroughotheragencyattheriskandcost of the
GC-41 DEFAULTOFCONTRACTOR:
i) The Corporation may upon written notice of default to the Contractor
terminate the contract circumstances detailed as under:
a) If in the opinion of the Corporation, the Contractor fails to make
completion of works within the time specified in the completion schedule
or within the period for which extension has been granted by the
Corporation to the Contractor.
b) IfintheopinionoftheCorporation,theContractorfailstocomplywithany of the
other provisions of this contract.
ii) In the event, the Corporation terminates the contract in whole or in part
asprovidedinArticleGC-50(TerminationoftheContract)theCorporation
reserves the right to purchase upon such terms and in such manner as it
maybedeemappropriate,plantsimilartoonewhichisnotsuppliedbythe
Contractor and the Contractor will be liable to the Corporation for any
additional costs for such similar plant and / or for liquidated damages for
delayuntilsuchtimeasmayberequiredforthefinalcompletionofworks.
iii) IfthiscontractisterminatedasprovidedinthisparagraphGC-40AND/OR GC-30
(Power of Entry)(1)the Corporation in additionto any other rights provided
in this clause, may require the Contractor to transfer title and deliver to
the Corporation.
a) Anycompletedworks
b) Suchpartiallycompleted informationandcontract rightsastheContractor has
specifically produced or acquired for the performance of the contract so
iv) In the event, the Corporation does not terminate the contract as provided
in the paragraph GC-50 (Termination of Contract) the Contractor shall
continue performance of the contract, in which case, he shall be liable to
the Corporation for liquidated damages for delay until the works are
completed and accepted.
GC-42 BANKRUPTCY:
If the Contractor shall become bankrupt or insolvent or has a receiving
ordermadeagainsthim,orcompoundwithhiscreditors,orbeingthe
Corporation commence to be wound up not being a member voluntary
windingupforthepurposeofamalgamationorreconstruction,orcarryon its
business under a receiver for the benefit of his creditors or any of them,
the Corporation shall be at liberty to either (a) terminate the contract
forthwith by giving notice in writing to the Contractor or to the receiver or
liquidator or to any person or Organization in whom the contract may
become vested and to act in the manner provided in Article GC-41
(Default of Contractor) as thought the last mentioned notice had been the
notice referred to in such article or (b) to give such receiver, liquidator or
other persons in whom the contract may become vested the option of
carrying out the contract subject to his providing a satisfactory guarantee
for the due and faithful, performance of the contract up to an amount to
be agreed. In the event that the Corporation terminates the contract in
accordance with this article, the performance bond shall immediately
become due and payable on demand to Corporation.
GC-43 OWNERSHIP :
Works hand over pursuant to the contract shall become the property of
the Corporation from whichever is the earlier of the following times,
a) Whentheworksarecompletedpursuanttothecontract.
b) Whenthecontractorhasbeenpaidanysumtowhichhemaybecome entitled in
respect thereof pursuant to Clause GC-36 (Terms of Payment).
GC-44 DECLARATIONAGAINSTWAIVER:
The condemnation by the Corporation of any breach or breaches by the
Contractor or an authorized sub-contractor of any of the stipulations and
conditions contained in the contract, shall in no way prejudice or affect or
beconstruedasawaiveroftheCorporation'srights,powersandremedies under
the contract in respect of any breach or breaches.
GC-45 LAWSGOVERNINGTHECONTRACT:
This contract shall be construed according to and subject to the laws of
India and the State of Gujarat and under the jurisdiction of the Courts of
Gujarat at Rajkot.
GC-46 OVERPAYMENTANDUNDERPAYMENT:
Whenever any claim for the payment of a sum to the Corporation arises
out of or under this contract against the Contractor, the same may be
deducted by the Corporation from any sum then due or which at any time
thereafter may become due to the Contractor under this contract and
failing that under any other contract with the Corporation (which may be
available with the Corporation), or from his retention money or he shall
pay the claim on demand. The Corporation reserves the right to carry out
postpaymentauditandtechnicalexaminationsofthefinalbillincludingall
supporting vouchers, abstracts etc. The Corporation further reserves the
righttoenforcerecoveryofanypaymentwhendetected,notwithstanding the
fact that the amount of the final bill may be included by one of the parties
as an item of dispute before an Arbitrator, appointed under Article GC-49
(Arbitration) of this contract and notwithstanding the fact that the amount
of the final bill figures in the arbitration award. If as a result of such audit
and technical examinations any over payment is discovered in respect of
any work done by the Contractor or alleged to have been done by him
under the contract, it shall be recovered by the Corporation from
theContractorasprescribedabove.Ifanyunderpaymentisdiscoveredby
theCorporation,theamountduetotheContractorunderthiscontract,
may be adjusted against any amount then due or which may at any time
thereafter become due before payment is made to the Contractor.
GC-47 SETTLEMENTOFDISPUTES:
Except as otherwise specifically provided in the contract, all disputes
concerningquestions offactarisingunderthecontractshallbedecidedby the
Engineer-In-Charge subject to a written appeal by the Contractor to the
Engineer-In-Charge and those decisions shall be final and binding on the
parties hereto. Any disputes or differences including those considered as
such by only one of the parties arising out of or in connection with this
contract shall be to the extent possible settled amicably between the
parties. If amicable settlement cannot be reached then all disputed issues
shallbesettled asprovidedin Article GC-48(Disputesordifferences tobe
referred to) and Article No.GC-49 (Arbitration).
GC-48 DISPUTESOFDIFFERENCESTOBEREFERRED TO:
If at any time, any question, disputes or differences of any kind
whatsoevershallarisebetweentheEngineer-In-Chargeandthecontractor
upon or in relation to or in connection with this contract either party may
forthwith give to the other, notice in writing of the existence of such
question, dispute or difference as to any decision, opinion, instruction,
direction, certificate or evaluation of the Engineer-In-Charge. The
question, dispute or differences shall be settled by the Municipal
Commissioner, Rajkot Municipal Corporation, who shall state his decision
in writing and give notice of same to the Engineer-In-Charge and to the
Contractor.Suchdecisionshallbefinalandbindinguponbothparties.The
contract and work on contract if not already breached or abandoned shall
proceednormallyunlessanduntilthesameshallberevised(oruphold)by any
arbitration proceedings as hereinafter provided. Such decisions shall be
final and binding on the Engineer-In-Charge and the Contractor unless the
Contractor shall require the matter to be referred to an Arbitration panel
as hereinafter provided.
GC-49 ARBITRATION:
In case of any dispute arising during the course of execution, the matter
should be referred to Municipal Commissioner who will be sole Arbitrator
whose decisions will be final and binding to the Contractor.
The word "Arbitration" or "Arbitration Clause" wherever mentioned in this
tender document, is to be treated to be referred to GC-49. In this context, an
Order bearing No.RMC/Legal/1858 dated 18-02-2017 of Legal Department of
Rajkot Municipal Corporation is uploaded separately along with this tender,
whichOrder,willhereafterreferredandtakenintoconsiderationforArbitration
related purpose.
GC-50 TERMINATIONOFTHECONTRACT:
i) IftheContractorfindsitimpracticabletocontinueoperationowingtoforce
majeure reasons or for any reasons beyond his control and/or the
Corporation find it impossible to continue operation, then prompt
notification in writing shall be given by the party affected to the other.
ii) If the delay or difficulties so caused cannot be expected to cease or
become unavoidable or if operations cannot be resumed within two (2)
months then either party shall have the right to terminate the contract
upon ten (10) days written notice to the other. In the event of such
termination of the contract, payment to the Contractor will be made as
a) The Contractor shall be paid for all works approved by the Engineer-In-
Charge and for any other legitimate expenses due to him.
b) If the Corporation terminates the contract owing to Force Majeure or due
to any cause beyond its control, the Contractor shall additionally be paid
for any work done during the said two (2) months period including any
financial commitment made for the proper performance of the contract
and which are not reasonably defrayed by payments under (a) above.
c) The Corporation shall also release allbonds and guarantees at its disposal
except in cases where the total amount of payment made to the
except in cases where the total amount of payment made to the
Contractor exceeds the final amount due to him in which case the
Contractorshallrefundtheexcessamountwithinthirty(30)daysafterthe
termination and the Corporation thereafter shall release all bonds and
guarantees. Should the Contractor fail to refund the amounts received in
excess within the said period such amounts shall be deducted from the
bonds or guarantees provided.
iii) On termination of the contract for any cause the Contractor shall see the
orderly suspension and termination of operations, with due consideration
totheinterestsoftheCorporationwithrespecttocompletionsafeguarding of
storing materials procured for the performance of the contract and the
salvage and resale thereof.
GC-51 SPECIALRISKS:
If during the contract, there shall be an outbreak of war (whether war is
declared or not), major epidemic, earthquake or similar occurrence in any
part of the world beyond the control of either party to the contract which
financiallyorotherwisemateriallyaffectstheexecutionofthecontract,the
Contractor shall unless and until, the contract is terminated under the
provisions of this article use his best endeavors to complete the execution
of the contract, provided always that the Corporation shall be entitled at
anyitemaftertheonsetofsuchspecialrisks,toterminatethecontractby giving
written notice to the contractor and upon such notice being given this
contract shall terminate but without prejudice to the rights of either party
in respect of any antecedent breach thereof.
The Contractor shall not be liable for payment of compensation for delay
or for failure to perform the contract for reasons of Force Majeure such as
acts of public enemy, acts of Government, fires, floods, cyclones,
epidemics, quarantine restrictions, lockouts, strikes, freight embargoes
and provided that the Contractor shall within 10 (ten) days from the
beginning of such delay notify the Engineer-In-Charge in writing, of the
cause of delay, the Corporation shall verify the facts and grant such
extension as the facts justify.
GC-52 CHANGEINCONSTITUTION :
Wherethe Contractor isapartnershipfirm,thepriorapprovalinwritingof
theownershallbe obtainedbefore anychange is made inthe constitution of
the firm. Where the Contractor is an individual or undivided family
business concern such approval as aforesaid shall likewise be obtained
before the Contractor enters into any partnership agreement where under
the partnership firm would have the right to carry out the works hereby
undertaken by the Contractor. If prior approval as aforesaid is not
obtained, the contract shall be deemed to have been assigned in
contravention of contract.
GC-53 SUB-CONTRACTUALRELATIONS:
Allworksperformedforthecontractby asub-contractorshallbepursuant to an
appropriate agreement between the Contractor and the sub- contractor,
which shall contain provision to –
a) Protect and preserve the rights of the Corporation and the Engineer-In-
Charge with respect to the works to be performed under the sub-
contracting party will not prejudice such rights.
b) Requirethatsuchworkbeperformedinaccordancewiththerequirements of
contract documents.
c) Require under such contract to which the contractor is a party, the
submission to the Contractor of application for payment and claims for
additional costs, extension of time, damages for delay or otherwise with
respect to the sub-contracted portions of the work in sufficient time, that
the Contractor may apply for payment comply in accordance with the
contractdocumentsforlikeclaimsbytheContractorupontheCorporation.
d) Waive all rights the contracting parties may have against one another for
damages caused by fire or other perils covered by the property insurance
except such rights as they may have to the proceeds of such insurance
held by the Corporation as trustee and,
e) Obligate each sub-contractor specifically to consent to the provisions of
GC-54 PATENTSANDROYALTIES:
1. Contractor, if licensed under any patent covering equipment, machinery,
materials or composition of matter to be used or supplied or methods and
process to be practiced or employed in the performance of this contract
agreestopayallroyaltiesandlicensefees,whichmaybeduewithrespect thereto.
If any equipment, machinery, materials, composition matters, to
beusedor suppliedor methods practicedor employedinthe performance of
this contract, is covered by a patent under which Contractor is not
licensed, then the Contractor before supplying / using the equipment,
machinery, materials, compositions, methods of process shall obtain such
license and pay such royalties and license fees as may be necessary for
performance of this contract. In the event Contractor fails to pay such
royalty or to obtain any such license, any suit for infringement of such
patentswhichisbroughtagainsttheContractorortheownerasaresultof such
failure will be defended by the Contractor at his own expenses and the
Contractor will pay any damages and costs awarded in such suit. The
Contractor shall promptly notify the owner if the Contractor has acquired
knowledge of any plant under which a suit for infringement could be
reasonably brought because of the use by the owner of any equipment
machinery, materials, process methods to be supplied in hereunder.
Contractor agrees to and does hereby grant to owner together with the
right to extend the same to any of the subsidiaries of the owner an
irrevocable royalty fee license to use in any Country, any invention made
by the Contractor or his employees in or as a result of the performance of
work under contract.
2. With respect to any sub-contract entered into by Contractor pursuant to
the provisions of the relevant clause hereof, the Contractor shall obtain
from the sub-contractor an understanding to provide the owner with the
same patent protection that contracts is required to provide under the
provisions of the clause.
3. TheContractorshallindemnifyandsaveharmlesstheownerfromanyloss on
account of claims against owner for the contributory infringement of
patent rights arising out of and based upon the claim that the use by the
Corporation of the process included in the design prepared by the
Contractor and used in the operation of the plant infringes on any patent
If, at any time, there should be evidence of any lien or claim for which
owner might have become liable and which is chargeable to the
Contractor, the owner shall have the right to retain out of any payment
then due or thereafter to become due an amount sufficient to completely
indemnify the owner against such lien or claim or if such lien or claim be
valid the owner may pay and discharge the same and deduct the amount
aspaidfrom any money whichmay bedueor becomedueandpayableto
theContractor.Ifanylienorclaimsremainingunsettledafterallpayments are
made, the Contractor shall refund or pay to the owner all money that the
latter may be compelled to pay in discharging such lien or claim including
all costs and reasonable expenses.
GC-56 EXECUTIONOFWORK:
Thewholeworkshallbecarriedoutinstrictconformitywiththeprovisions of the
contract document, detailed drawings, specifications and the instructions
of the Engineer-In-Charge from time to time. The Contractor shall ensure
that the whole work is executed in the most substantial, and proper
manner with best workmanship using materials of best quality in strict
accordance with the specifications to the entire satisfaction of the
Engineer-In-Charge.
GC-57 WORKINMONSOON:
When the work continues in monsoon if required, the Contractor shall
maintain minimum labour force required for the work and plan and
execute the construction and erection work according to the prescribed
schedule. No extra rate will be considered for such work in monsoon.
During monsoon and entire construction period, the Contractor shall keep
the site free from water at his own cost. However, monsoon period from
1st July to 30th September will be excluded in time limit.
GC-58 WORKONSUNDAYSANDHOLIDAYS:
No work except curing shall be carried out on Sunday and holidays.
However, if the exigencies of the work need continuation of work on
Sundays and Holidays, written permission of theEngineer-In-Chargeshall
be obtained in advance.
GC-59 GENERALCONDITIONSFORCONSTRUCTIONWORK:
Working hours shall be eight every day. The over time work in two shifts
couldbecarriedoutwiththewrittenpermissionoftheEngineer-In-Charge but
no compensation shall be paid for the same. The rate quoted shall include
this. The Contractor shall plan his work in such a way that his labourers
do not remain idle. The owner will not be responsible for idle labour of the
Contractor. The Contractor shall submit to the owner
progressreporteveryweek.Thedetailsandproformaofthereportwillbe as per
mutual agreement.
GC-60 DRAWINGSTOBESUPPLIEDBYTHEOWNER:(N.A.)
The drawings attached with the e-Tender documents shall be for general
guidanceoftheContractortoenablehimtovisualizethetypeofwork
contemplated and scope of work involved. Detail working drawings
according to which the work is to be done shall be prepared by the
Contractor for executing the work.
GC-61 DRAWINGSTOBESUPPLIEDBYTHECONTRACTOR:
Where drawings, data are to be furnished by the Contractor they shall be
as enumerated in special conditions of contract and shall be furnished
withinthespecifiedtime.Whereapprovalofdrawingshasbeenspecifiedit shall
be Contractor's responsibility to have these drawings got approved before
any work is taken up with regard to the same. Any changes becoming
necessary in those drawings during the execution of the work shall have
to be carried out by the Contractor at no extra cost. All final drawings
shall bear the certification stamp as indicated below duly signed by both
the Contractor and Engineer-In-Charge.
Contractor Engineer-In-Charge
Drawings willbe approved within three (3 weeks of the receipt of the same
by the Engineer-In-Charge.
GC-62 SETTINGOUTWORK:
The Contractor shall set out the work on the site handed over by the
Engineer-In-Charge and shall be responsible for the correctness of the
same. The work shall be carried out to the entire satisfaction of Engineer-
In-Charge. The approval thereof or partaking by Engineer-In-Charge or
setting out work shall not relieve Contractor of any of his responsibilities.
The Contractor shall provide at his own cost all necessary level posts,
pegs, bamboos, flags, ranging rods, strings and other materials and
labourers required for proper setting out of the work. The Contractor shall
provide fix and be responsible for the maintenance of all stakes,
templates, level markets, profiles and similar other things and shall take
allnecessaryprecautionstopreventtheirremovalordisturbanceandshall be
responsible for the consequences for such removal or disturbance. The
Contractor shall also be responsible for the maintenance of all existing
survey marks, boundary marks, and distance marks and centerline marks
either existing or face lines and cross lines shall be marked by small
masonry pillars. Each pillar shall have distance mark at the center for
setting up the theodolite. The work shall not be started unless the setting
out is choked and approved by Engineer-In-Charge in writing but such
approval shall not relieve the Contractor of his responsibilities about the
correctness of setting out. The Contractor shall provide all materials,
labour and other facilities necessary for checking at his own cost. Pillars
bearing geodetic marks on site shall be protected by the Contractor. On
completion of the work, the Contractor shall submit the geodetic
documents according to which the work has been carried out.
RESPONSIBILITIESOFCONTRACTORFORCORRECTNESSOFTHEWOR
The Contractor shall be entirely and exclusively responsible for the
correctness of every part of the work and shall rectify completely any
errors therein at his own cost when so instructed by Engineer-In-Charge.
If anyerrorhascreptintheworkduetonon-observanceofthisclauseThe
Contractor will be responsible for the error and bear the cost of corrective
1. MaterialstobesuppliedbytheContractor:
Contractor shall procure and provide all the material required for the
execution and maintenance of work including M S rods; all tools, tackles,
construction plant and equipment except, the materials to be supplied by
the owner detailed in the contract documents. Owner, shall make
recommendations for procurement of materials to the respective
authorities if desired by the Contractor but assumes no responsibility of
anynature.OwnershallinsistforprocurementofmaterialswithISImarks
supplied by reputed firms of the DGS & D list.
2. If however, the Engineer-In-Charge feels that the work is likely to be
delayedduetoContractor'sinabilitytoprocurematerials,theEngineer-In-
Charge shallhave the right to procure materials, from the market and the
ContractorwillacceptthesematerialsattheratesdecidedbyEngineer-In-
GC-64 MATERIALSTOBESUPPLIEDBYTHEOWNER:
1. If the contract provided certain materials or stores to be supplied by the
owner,suchmaterialsandstorestransportedbytheContractorathiscost from
owner's stores or Railway Station. The cost from Contractor for the value
of materials supplied by the owner will be recovered from the R.A.Bill on
the basis of actual consumption of materials in the work covered and for
which R A Bill has been prepared. After completion of the work, the
Contractor has to account for the full quantity of materials supplied to
2. The value of store materials supplied by owner to the Contractor shall be
charged at rates shown in the contract document and in case any other
material not listed in the schedule of materials is supplied by the owner,
the same shall be charged at cost price including carting and other
expenses incurred in procuring the same. All materials so supplied shall
remain the property of the owner and shall not be removed from the site
on any account. Any material remaining unused at the time of completion
of work or termination of contracts shall be returned to owner's store or
any other place as directed by the Engineer-In-Charge in perfectly good
conditionatContractor'scost.Whenmaterialsaresuppliedfreeofcostfor
useinworkandsurplusandunaccountedbalancethereofarenotreturned
totheowner,recoveryinrespectofsuchbalancewillbeeffectedatdouble the
applicable issue rate of the material or the market rates whichever is
GC-65 CONDITIONSOFISSUEOFMATERIALSBYTHEOWNER:(N.A.)
The materials specified to be issued by the owner to the Contractor shall
beissuedbytheownerathisstoreandallexpensesforitcartingsiteshall
bebornebytheContractor willbeissuedduringworkinghoursand asper rules
of owner from time to time.
Contractor shall bear all expenses for storage and safe custody at site of
materials issued to him before use in work.
Material shall be issued by the owner in standard / non-standard sizes as
obtained from manufacturer.
Contractor shall construct suitable godowns at site for storing the
materials to protect the same from damage due to rain, dampness, fire,
The Contractor should take the delivery of the materials issued by the
owner after satisfying himself that they are in good condition. Once the
materials are issued, it will be the responsibility of the Contractor to keep
them in good condition and in safe custody. If the materials get damaged
or if they are stolen, it shall be the responsibility of the Contractor to
replace them at his cost according to the instructions of the Engineer-In-
For delay in supply or for non-supply of materials to be supplied by the
owner, on account of natural calamities, act of enemies, other difficulties
beyond the control of the owner, the owner carries no responsibilities. In
nocasetheContractorshallbeentitledtoclaimanycompensationforloss
suffered by him on this account.
None of the materials issued to the contractor, shall be used by the
Contractor for manufacturing items which can be obtained from the
manufacturers. The materials issued by the owner shall be used for the
work only and no other purpose.
Contractor shall be required to execute indemnity bond in the prescribed
form for the safe custody and accountof materials issued by the owner.
Contractor shall furnish sufficiently in advance a statement of his
requirements of quantities of materials to be supplied by the owner and
the time when the same will be required for the work, so as to enable
Engineer-In-Charge to make arrangements to procure and supply the
A daily account of materials issued by the owner shall be maintained by
the contractor showing receipt, consumption and balance on hand in the
form laid down by Engineer-In-Charge with all connected paper and shall
be always available for inspection in the site office.
Contractor shall see that only the required quantities of materials are got
issued and no more. The Contractor shall be responsible to return the
surplus materials at owner's store at his own cost.
GC-66 MATERIALSPROCUREDWITHASSISTANCEOFTHEOWNER:
Notwithstanding anything contained to the contrary in any of the clauses
of this contract, where any materials for the execution of the contract are
procured with the assistance of the owner either by issue from owner's
stock or purchase made under orders or permits or licenses issued
materialsastrusteesforowner,andusesuchmaterialsnotdisposedthem off
without the permission of owner and unserviceable materials that may be
left with him after completion of the contract or at its termination for any
reason whatsoever on his being paid or credited such price as Engineer-
In-Chargeshalldeterminehavingdueregardtotheconditionsof
thematerials.ThepriceallowedtoContractorshallnotexceedtheamount
chargedto him excluding the storageof breachof the aforesaidcondition,
the Contractor shall in terms of license or permits and/or for criminal
breach of trust be liable to compensate owner at double the rate or any
higher rates. In the event of these materials at that time having higher
rateornotbeingavailableinthemarketthenanyotherratetobe
determined by the Engineer-In-Charge at his decision shall be final and
GC-67 MATERIALSOBTAINEDFROMDISMANTLING:
If the Contractor, in the course of execution of work, is called upon to
dismantle any part of work for reasons other than on account of bad or
imperfect work, the materials obtained from dismantling will be property
of the owner and will be disposed off as per instructions of Engineer-In-
Charge in the best interest of the owner.
GC-68 ARTICLE OF VALUE OF TREASURE FOUND DURING CONS-
All gold, silver and other minerals of any description and all precious
stones, coins, treasures, relics, antiques and other similar things which
shall be found in, under or upon site shall be the property of the owner
and the Contractor shall properly preserve the same to the satisfaction of
the Engineer-In-Charge and shall hand over the same to the owner.
GC-69 DISCREPANCIESBETWEENINSTRUCTIONS:
If there is any discrepancy between various stipulations of the contract
documents or instructions to the Contractor or his authorized
representative or if any doubt arises as to themeaningof such stipulation
or instructions, the Contractor shall immediately refer in writing to the
Engineer-In-Charge and shall hand over the same to the owner.
GC-70 ALTERATIONSINSPECIFICATIONS&DESIGNS&EXTRAWORK:
The Architect / Engineer-In-Charge shall have power to make any
alterations in, omission from, addition to substitution for, the schedule of
rates, the original specifications, drawings, designs and instructions that
may appear to him to be necessary or advisable during the progress of
work and the Contractor shall be boundto carry outsuch altered/ extra /
newitemsofworkinaccordancewithanyinstructionswhichmaybegiven to him
in writing signed by Engineer-In-Charge and such alteration omissions,
additionsor substitutions, shallnotinvalidatecontract andany altered,
additional or substituted work shall be carried out by the
Contractoronthesameconditionsofcontract.Thetimeofcompletionmay be
extended by Architect as may be considered just and reasonable by him.
The rates for such additional, altered or substitute work shall be worked
a) If the rates for additional, altered or substitutes work are specified in the
contract for work, the Contractor is bound to carry out such work at the
same rates as specified in the contract.
b) If the rates for additional, altered or substituted work are not specifically
provided in the contract for the work, the rates will be derived from the
rates of similar items of work in the contract work. The opinion of
Engineer-In-Charge as to whether the rates can be reasonably so derived
the items of contract will be final and binding to the Contractors.
c) If the rates of altered, additional or substitute work cannot be
determined as specified in (a) or (b) above, the rate shall be paid
asperS.O.R.ofRMCandifnotavailableinRMCSORthanitwillbe paid
according to SOR of R&B/GWSSB.
d) If the rates of altered, additionalor substitute work cannot be determined
asspecifiedin(a)or(b)or (c)above,theContractorshallwithinseven
days of the receipt of order to carry out the work inform the Architect /
Engineer-In-Charge of the rate which he intends to charge for such work
supported by rate analysis and the Architect / Engineer-In-Charge will
determine the rate on the basis of prevailing market rates of materials,
labour cost at schedule of labour plus 15% there on as Contractor's
supervision overheads and profit. The opinion of Architect / Engineer-In-
Charge as to the market rates of materials and the quantity of labour
involved per unit of measurement will be final and binding on Contractor.
But under no circumstances, the Contractor suspends work or the plea of
non settlement of items falling under this clause.
GC-71 ACTIONWHENNOSPECIFICAITONSAREISSUED:
In case of any class of work for which no specifications is supplied by the
owner in the e-Tender documents, such work shall be carried out in
accordance with relevant latest ISS and if ISS do not cover the same, the
work shall be carried out as per General Technical Specification for
building work; and if not covered in then it is to be with standard
Engineering Practice subject to the approval of Engineer-In-Charge.
GC-72 ABNORMALRATES:
Contractor isexpectedto quoterateforeachitem aftercarefulanalysisof cost
involved for the performance of the completed item considering all
specifications and conditions of contract.
GC-73 ASSISTANCETOENGINEER-IN-CHARGE:
Contractor shall make available to Engineer-In-Charge free of cost all
necessary instruments and assistance in checking of any work made by
the Contractor setting out for taking measurement of work etc.
GC-74 TESTSFORQUALITYOFWORK:
1. All workmanship shall be of the best kind described in the contract
documents and in accordance with the instructions of Engineer-In-Charge
andshallbesubjectedfromtimetotimetosuchtestsat Contractor'scost as the
Engineer-In-Charge may direct at the place of manufacture of fabrication
or on the site or at any such place. Contractor shall provide assistance,
instruments, labourandmaterialsasarenormallyrequiredfor
examining,measuring andtestingof any work of workmanshipasmay be
selected and required by Engineer-In-Charge.
2. Alltestsnecessary inconnectionwiththe executionof work as decidedby
Engineer-In-Charge shall be carried out at an approved laboratory at
Contractor's cost.
3. Contractor shall furnish the Engineer-In-Charge for approval when
requested or if required by the specification, adequate samples of all
materials and finished goods to be used in work sufficiently in advance to
permit tests and examination thereof. All materials furnished and finished
goods applied in work shall be exactly as per the approved samples.
GC-75 ACTIONANDCOMPENSATIONINCASEOFBADWORKMANSHIP:
If it shall appear to the Engineer-In-Charge that any work has been
executed with materials of inferior description, or quality or are unsound
or with unsound, imperfect or unskilled workmanship or otherwise not in
accordance with the contract, the Contractor shall, on demand in writing
from Engineer-In-Charge or his authorized representative specifying the
work, materials or articles complained of, notwithstanding that the same
may have been inadvertently passed, certified and paid for, forthwith
rectify or remove and reconstruct the work, so specified. In the event of
failure to do so within a period to be specified by the Engineer-In-Charge
inhisaforesaiddemand, Contractorshallbeliabletopaycompensation at the
rate of half a percent of the estimated cost of work for every work limited
to a maximum of ten (10%) percent of the value of work while his failure
to do so continues and in the case of any such failure, the Engineer-In-
Chargemay onexpiryofthenoticeperiodrectifyandremove andre-
executetheworkorremoveandreplacewithothersattheriskand cost of the
Contractor. The decision of the Engineer-In-Charge as to any question
arising under this clause shall be final and conclusive.
GC-76 SUSPENSIONWORK:
Contractor shall, if ordered in writing by Engineer-In-Charge or his
representative temporarily suspended the work or any part thereof for
such time (not exceeding one month) as ordered and shall not after
receiving such written notice proceed with the work until he shall have
received a written order to proceed therewith. The Contractor shall not be
entitledtoclaimcompensationforanylossordamagesustainedbyhimby
reasonoftemporarysuspensionofworkasaforesaid.Anextensionoftime for
completion of work will be granted to the Contractor corresponding to the
delay caused by such suspension of work if he applies for the same
provided the suspension was not consequent upon any default or failure
on the part of the Contractor.
GC-77 OWNERMAYDOPARTOFTHEWORK:
When the Contractor fails to comply with any instructions given in
accordance with the provisions of this contract, the owner has the right to
carry out such parts of work as the owner may designate whether by
purchasing materials and engaging labour or by the agency of another
Contractor. In such case the owner shall deduct from the amount which
otherwise might become due to Contractor, the cost of such work and
materials with then (10) percent added to cover all departmental charges
and should the total amount thereof exceed the amount due to contract,
and should the total amount thereof exceed the amount due to contract,
Contractor shall pay the difference to owner.
GC-78 POSSESSIONPRIORTOCOMPLETION:
The Engineer-In-Charge shall have the right to take possession of or to
use any completed or partly completed work or part of work. Such
possession or use shall not be deemed to be an acceptance of any work
completed in accordance with the contact. If such prior possession or use
by Engineer-In-Charge delays the process of work, equitable adjustment
inthetimeofcompletionwillbemadeandthecontractshallbedeemedto be
modified accordingly.
GC-79 COMPLETIONCERTIFICATE:
As soon as the work has been completed in accordance with contact
(except in minor respects that do not effect their use for the purpose for
which they are intended and except for maintenance thereof) as per
General Conditions of Contract the Engineer-In-Charge shall issue a
certificate (hereinafter called completion certificate) in which shall certify
thedateonwhichworkhasbeencompletedandhaspassed thesaidtests
andownershallbedeemedtohavetakenoverworkonthedateso
certified. If work has been divided in various groups in contract, owner
shall be entitled to take over any group or groups before the other or
others and there upon the Engineer-In-Charge will issue a completion
certificate,whichwill,however,beforsuchgrouporgroupssotakenover.
In order that Contractor could get a completion certificate, he shall make
goodwillallspeedanydefectarisingfromthedefectivematerialssupplied by
Contractor of workmanship or any act or omission of Contractor that
mayhavebeendiscoveredordevelopedaftertheworkorgroupsofworks
hasbeentakenover.Theperiodallowedforcarryingoutsuchworkwillbe
normally, one month. If any defect be not remedied within the time
specified,ownermayproceedtodoworkatContractor's(Agency,orFirm) risk
and expenses and deduct from the final bill such amount as may be
decided by owner. If by reason of any default on the part of the
Contractor,acompletioncertificatehasnotbeenissuedinrespectofevery
portion of work within one month after the date fixed by contract for
completion of work, owner shall be at liberty to use work or any portion
thereof in respect of which a completion certificate has been issued,
provided that work or the portion thereof so used as aforesaid shall be
affordedreasonableopportunityforcompletionofthatworkortheportion
thereof so used as aforesaid shall be afforded reasonable opportunity for
completion of that work for the issue of completion certificate.
GC-80 SCHEDULEOFRATES:
1. The rates quoted by the Contractor shallremain firm tillthe completion of
the work and shall not be subject to escalation. Schedule of rates shall be
deemed to include and cover all costs, expenses and liabilities of every
description and risks or every kind to be taken in executing, completing
andhandingovertheworktoownerbyContractor.Thecontractorshallbe
deemed to have known the nature, scope, magnitude and the extent of
workandmaterialsrequiredthoughcontractdocumentsmaynotfullyand
precisely furnish them. He shall make such provision in the Schedule of
Rates as he may consider necessary to cover the cost of such items of
work and materials as may be reasonable and necessary to complete the
work. The opinion of Engineer-In-Charge as to the item of work which are
necessary and reasonable for completion of the work shall be final and
binding on Contractor although the same may be not shown on drawings
or described specifically in contract documents.
2. TheScheduleofRatesshallbedeemedtoincludeandcoverthecostof all
constructional plant, temporary work, materials, labour and all other
matters in connection with each item in Schedule of Rates and the
execution of work or any portion thereof finished complete in every
respectandmaintainedasshownordescribedinthecontractdocumentor as
may be ordered in writing during the continuance of the contract.
3. TheScheduleofRatesshallbedeemedtoincludeandcoverthecostof all royalties
and fees for the articles and processes, protected by letters patent or
otherwise incorporated in or used in connection with work, also all
royalties, rents and other payments in connection with obtaining material
of whatsoever kind for work and shall include an indemnity to owner
which Contractor hereby gives against all action, proceedings, claims,
damages, costs and expenses arising from the incorporation in or use on
the works of any such articles, processes or materials. Other Municipal or
local Board charges if levied on material, equipment or machineries to be
brought to site for use on work shall be borne by the Contractor.
4. No exemption or reduction of custom duties, excise duties, sales tax or
any other taxes or charges of the Central or State Government or of any
Local Body whatsoever will be granted or obtained and all such expenses
shall be deemed to have been included in and covered by Schedule of
Rates. Contractor shall also obtain and pay for all permits or other
privileges necessary to complete the work.
5. The Schedule of Rates shall be deemed to include and cover risk on
accountof delay and interferencewithContractor'sconduct ofworkwhich
may occur from any cause including orders of owner in the exercise of his
powers and on account of extension of time granted due to various
6. For work under unit rate basis, no alteration will be allowed in the
Schedule of Rates by reasons of work or any part of them being modified,
altered, extended, diminished or omitted.
GC-81 PROCEDUREFORMEASUREMENTOFWORKINPROGRESS:
1. All measurements shall be in metric system. All the work in progress will
be jointly measured by the representative of Engineer-In-Charge and
Contractor'sauthorizedagent.Suchmeasurements willbegotrecordedin the
Measurement Book by the Engineer-In-Charge or his authorized
representative and signed by the Contractor or his authorized agent in
token of acceptance. If the Contractor or his authorized agent fails to be
presentwheneverrequiredbytheEngineer-In-Chargefortakingmeasures for
every reasons whatsoever, the measurement will be taken by the
Engineer-In-Charge or his authorized representative not withstanding the
absence of Contractor and these measurements will be deemed to be
correct and binding on the Contractor.
2. Contractor will submit a bill in approved proforma in quadruplicate to the
Engineer-In-Charge of the work giving abstract and detailed
measurements of various items executed during a month as mutually
agreed. The Engineer-In-Charge shall verify the bill and the claim, as far
as admissible, adjusted if possible, within 10 days of presentation of the
GC-82 RUNNINGACCOUNTPAYMENTSTOBEREGARDEDASADVANCES:
1. All running account payments shall be regarded as payments by way of
advance against the final payment only and not as payment for work
actually done and completed and shall not preclude the requiring of bad,
unsound and imperfect or unskilled work to be removed and taken away
and reconstructed or rejected or to be considered as an admission of the
due performance of contract or any part thereof.
2. Five (5) percent of the gross R A Bill amount shall be retained from each
bill as retention amount and the same will be paid with the final bill.
GC-83 NOTICEFORCLAIMFORADDITIONALPAYMENT:
If the Contractor considers that he is entitled to extra payment or
compensation or any claim whatsoever in respect of work, he shall
forthwith give notice in writing to the Engineer-In-Charge about his extra
payment and / or compensation. Such notice shall be given to the
Engineer-In-Chargewithinten(10) daysfromthe happeningof anyevent
uponwhich Contractor basis such claims and such notice shallcontain full
Particulars of the nature of such claim with full details and amount
claimed. Failure on the part of the Contractor to put forward any claim
with the necessary particulars as above, within the time above specified
shall be an absolute waiver thereof. No omission by owner to reject any
suchclaim andno delay indealing therewithshall waiver byowner or any
rights in respect thereof.
GC-84 PAYMENTOFCONTRACTOR'SBILL:
1. The price to be paid by the owner to Contractor for the work to be done
and for the performance of all the obligations undertaken by the
Contractor under contract shall be based on the contract price and
payment to be made accordingly for the work actually executed and
approved by the Engineer-In-Charge.
2. NopaymentshallbemadeforworkcostinglessthanRs.2,00,000/-tillthe
workiscompletedandacertificateofcompletionforConstructionisgiven.
ButincaseofworkestimatedtocostmorethanRs.2,00,000/-,Contractor
onsubmittingthebillthereofwillbeentitledtoreceiveamonthlypayment
proportionate to the part thereof, approved and passed by Engineer-In-
Charge, whose certificate of such approval and passing of the sum so
payable shall be final and conclusive against contractor. This payment
shall be made after necessary deductions as stipulated elsewhere in the
contract documents for materials, security deposit etc. The payment shall
be released to the Contractor within two (2) month of submission of the
bill duly pre-occupied on proper revenue stamp. Payment due to
Contractor shall be made by the owner by ECS/RTGS mode in Indian
currency. Successful bidder must furnish his Bank details for RTGS/ECS
with Account Branch of RMC.
GC-85 FINALBILL:
The final bill shall be submitted by Contractor within one (1) month of the
date of physical completion of work, otherwise the Engineer-In-Charge's
certificate of the measurement and of total amount payable for work shall
certificate of the measurement and of total amount payable for work shall
be final and binding on all parties.
GC-86 RECEIPTFORPAYMENT:
Receipt for payment made on account of work when executed by a firm
must be signed by a person holding Power of Attorney in this respect on
behalf of Contractor except when described in the e-Tender as a limited
company in which case the receipt must be signed in the name of the
Company by one of its principal officers or by some person having
authority to give effectual receipt for the Company.
GC-87 COMPLETIONCERTIFICATE:
1. WhentheContractorfulfilshisobligationaspertermsofcontract,heshall be
eligible to apply for Completion Certificate. Contractor may apply for
separateCompletionCertificate in respectof each suchportionof work by
submitting the completion documents along with such application for
Completion Certificate.
TheEngineer-In-Chargeshallnormally issuetoContractor theCompletion
Certificatewithinone(1)monthafterreceivinganapplicationthereoffrom
Contractor after verifying, from the completion documents and satisfying
himselfthatworkhasbeencompletedinaccordancewithandassetoutin the
construction and erection drawings and the contract documents.
Contractor after obtaining the Completion Certificate is eligible to present
the final bill for work executed by him under the terms of contract.
2. Withinonemonthofcompletionofworkin allrespectsContractorshall be
furnished with a certificate by the Engineer-In-Charge of such completion
but no certificate shall be given nor shall work be deemed to have been
executed until all (i) scaffolding, surplus materials and rubbish is cleaned
off site completely, (ii) until work shall have been measured by the
Engineer-In-Charge whose measurement shall be binding and conclusive
and, (iii) until all the temporary works, labour and staff colonies etc.
constructed are removed and the work site cleaned to the satisfaction of
the Engineer-In-Charge. If Contractor shall fail to comply with the
requirementsasaforesaidor beforedatefixedfor thecompletionof work, the
Engineer-In-Charge may at the expense of Contractor remove such
scaffolding, surplus materials and rubbish and dispose off the same as he
3. Thefollowingdocuments willformthecompletion documents:-
a) Technicaldocumentsaccordingtowhichtheworkhasbeencarriedout.
b) Threesetsofconstructiondrawings showingthereinthemodificationsand
corrections made during the course of execution signed by the Engineer-
c) CompletionCertificatefor"Embedded"or"Covered"upwork.
d) Certificateoffinallevelsassetoutforvariousworks.
e) Certificateoftestperformedforvariouswork.
f) Material appropriation statement for the materials issued by owner for
workandlistofsurplusmaterialsreturnedtoowner'sstoredulysupported by
necessary documents. (N.A.)
4. Upon expiry of the period of defect liability and subject to Engineer-In-
Charge being satisfied that work has been duly maintained by Contractor
during the defect liability period of fixed originally or as extended
subsequently and that Contractor has in all respects made up any
subsidenceandperformedallhisobligationsundercontract,theEngineer- In-
Charge (without prejudice to the rights of owner in any way) give final
certificate to that effect. The Contractor shall not be considered to have
fulfilled the whole of his obligation until final certificate shall have been
given by the Engineer-In-Charge.
5. FinalCertificateonlyevidenceofcompletion:
Except the final certificate, no other certificate of payment against a
certificate or on general account shall be taken to be an admission by
ownerofthedueperformanceofcontractoranypartthereofofoccupancy or
validity or any claim by the Contractor.
GC-88 TAXES,DUTIES,ETC.:
1. Contractor agreesto and doesherebyacceptfull andexclusive liabilityfor the
payment of any and alltaxes including Sales Tax, Duties, etc., now or
hereinafterimposed,increasedormodifiedfromtimetotimeinrespectof work
and materials and all contributions and taxes for unemployment,
compensation, insurance and old age pension or annuities now or
hereinafter imposed by the Central or State Government authorities with
respecttoorcoveredbythewages,salariesorothercompensationpaidto the
persons employed by Contractor.
IftheContractorisnotliabletoSalesTaxassessment,acertificatetothat effect
from the Competent Authority shallbe produced without which final
payment to the Contractor shall not be made No.P, 'C' and 'D' Form shall
be supplied by the owner, and the Contractor shall be required to pay full
tax as applicable.
2. Contractor shall be responsible for compliance with all obligations and
restrictions imposed by the labour law or any other law affecting
employer-employee relationship.
3. Contractor further agrees to comply and to secure the compliance of all
sub contractors with applicable Central, State, Municipal and local laws
and regulations and requirement. Contractor also agrees to defend,
indemnify the hold harmless the owner from any liability or penalty which
may be imposed by Central, State or local authority by reasons of any
violation by Contractor or sub Contractor of such laws, regulations or
requirements and also from all claims, suits or proceedings that may be
broughtagainstownerarisingunder,growingoutoforbyreasonsorwork
provided for by this Contract by third parties or by Central or State
Government authority or any administrative Sub-Division thereof.
TheSalesTaxonworkcontractwillbebornebyContractor.
GC-89 INSURANCE:
Contractor shall at his own expenses carry and maintain the reputable
Insurance Companies to the satisfaction of owner as follows :
1. Contractor agrees to and uses hereby accept full and exclusive liability for
compliancewithallobligationsimposedbytheEmployer'sStateInsurance Act,
1948 and Contractor further agrees to defend, indemnify and hold
ownerhardnessfromanyliabilityorpenaltywhichmaybeimposedbythe
CentralorStateGovernmentorlocalauthoritybyreasonsofanyassorted
violation by Contractor or Sub-Contractor or the Employees State
Insurance Act, 1948 and also from all claims, suits or proceedings that
maybebroughtagainstownerarisingunder,growingoutoforbyreasons
oftheworkprovidedforbythiscontractwhetherbroughtbyemployeesof
Contractor bythirdpartiesorbyCentralorStateGovernmentauthorityor any
administrative Sub-division thereof.
Contractor agrees to fill in with the Employees State Insurance
Corporation, the declaration form and all forms which may be required in
respect of Contractor's or sub-Contractor's employees whose aggregate
remuneration is Rs.400/- p.m. or less and who are employed in work
provided for or those covered by ESI from time to time under the
agreement. The Contractor shall deduct and secure the agreement of the
sub-Contractor to deduct the employee’s contribution as per the first
schedule of the Employees State Insurance Act from wages. Contractor
shall remit and secure the agreement of sub-contractor to remit to the
StateBankofIndianEmployeesStateInsuranceAccounts,theemployee's
contributionasrequiredbytheAct.Contractoragreestomaintainallcards and
records as required under the Act in respect of employees and payments
and Contractor shall secure the agreements of the sub contractors to
maintain in such records, any expenses incurred for the
contributions,makingcontributionsormaintainingrecordsshallbeto
Contractors or sub-contractors own account. owner shall retain such sum
asmay benecessaryfromthecontract valueuntilContractorshallfurnish
satisfactory proof that all contribution asrequired by theEmployeesState
Insurance Act, 1948 have been paid.
2. Workman's compensation and employees liability insurance:
Insurance shall be effected for all Contractors employees engaged in the
performanceofthiscontract.Ifanypartofworkissublet,Contractorshall require
the sub-Contractor to provide workman's compensation and employer's
liability insurance, which may be required by owner.
3. Other Insurance required under law of regulations or by owner Contractor
shall also carry and maintain any and all other insurance which may be
requiredunderanylaworregulationfromtimetotime.Heshallalsocarry and
maintain any other insurance, which may be required by owner.
GC-90 DAMAGETOPROPERTY:
1. Contractor shall be responsible for making good to the satisfaction of
owner any loss of and any damage to all structures and properties
belonging to owner or being executed or procured or being procured by
owner or of other agencies within the premises of all work of owner, if
such lossor damageis duetofault and/ orthenegligenceofwillfulactor
omission of Contractor, his employees, agent, representatives or sub-
2. Contractor shall indemnify and keep owner harmless of all claims for
damage to properties other than property arising under by reasons of this
agreement, such claims result from the fault and / or negligence or willful
act or omission of Contractor, his employees, agents representative or
sub-contractor.
GC-91 CONTRACTORTOINDEMNIFYOWNER:
1. The Contractor shall indemnify and keep indemnified the owner and every
member, officer and employee of owner from and against all actions,
claims, demands and liabilities whatsoever under the in respect of the
breach of any of the above clauses and / or against any claim, action or
demand by any workman / employee of the Contractor or any sub-
contractor under any laws, rules or regulations having force of laws,
including but not limited to claims against the owner under the workman
compensation Act, 1923, the Employee's Provident Funds Act, 1952 and /
or the contract labour (Abolition and Regulations) Act,
2. PAYMENTSOFCLAIMSANDDAMAGES :Ifowner hastopay anymoney in
respect of such claims or demands aforesaid, the amount so paid and the
cost incurred by the owner shall be charged to and paid by Contractor
without any dispute notwithstanding the same may have been paid
without the consent or authority of the Contractor.
3. In every case in which by virtue of any provision applicable in the
workman'sCompensation Act, 1923or any other Act, owner beobligedto
pay compensation to workmen employed by Contractor the amount of
compensation so paid, and without prejudice to the rights of owner under
Section-(12) Sub-section-(2) of the said Act, owner shall be at liberty to
recover such amount from any surplus due to on to become due to the
Contractor or from the security deposit. Owner will not be bound to
contestanyclaimmadeunderSection-(12)Sub-section-(2)ofthesaidact
exceptonwrittenrequestofContractorandgivingfullsecurityforallcosts
consequent upon the contesting of such claim.
The Contractor shall protect adjoining sites against structural, decorative
and other damages that could be cased to adjoining premises by the
execution oftheseworksandmakegoodathiscost,anysuchdamage,so caused.
GC-92 IMPLEMENTATIONOFAPPRENTICEACT1954:
ContractorshallcomplywiththeprovisionsoftheapprenticeAct1954and
theordersissuedthereunder from timetotime. If hefailstodoso, itwill be a
breach of contract.
GC-93 HEALTHANDSANITARYARRANGEMENTSFORWORKERS:
Contractor shall comply with all the rules and regulations of the local
Sanitary Authorities or as framed by owner from time to time for the
protection of health and provide sanitary arrangements of all labour
directly or indirectly employed on the work of this contract.
GC-94 SAFETYCODE:
Contractor shall adhere to safe construction practice and guard against
hazardous and unsafe working conditions and shall comply with owner's
rules as set forth herein.
1.0 FirstAidandIndustrialInjuries:
1.1 Contractor shallmaintain First-Aid facilities for its employees and those of
his sub-contractors.
1.2 Contractorshallmakeoutsidearrangementsforambulanceserviceandfor
thetreatmentofindustrialinjuries.Nameofthoseprovidingtheseservices
shallbefurnishedtoEngineer-In-Chargepriortostartofconstruction,and their
telephone numbers shall be prominently posted in Contractor's field office.
1.3 AllinjuriesshallbereportedpromptlytoEngineer-In-Chargeandacopyof
Contractor'sreportcoveringeachpersonalinjuryrequiringtheattentionof a
physician shall be furnished to owner.
2.0 GeneralRules:
2.1 Carrying and striking, matches, lighters inside the project area and
smokingwithinthejobsiteisstrictlyprohibited.Violatorsofsmokingrules shall
be discharged immediately. Within the operation area, no hot work shall
be permitted, without valid gas, safety, fire permits. The Contractor shall
also be held liable and responsible for all lapses of his sub- Contractors /
employees in this regard.
3.0 Contractor'sBarricades:
3.1 Contractor shall erect and maintain barricades without any extra cost,
required in connection with his operation to guard or protect during the
entire phase of the operation of this contract for -
ii) Hoistingareas
iii) AreasadjudgedhazardousbyContractor'sOROwner'sinspectors.
iv) Owner'sexistingpropertyliabletobedamagedbyContractor's
operations, in the opinion of Engineer-In-Charge / Site Engineer.
3.2 Contractor's employees and those of his sub-contractors shall become
acquainted with owner's barricading practices and shall respect the
provisions thereof.
3.3 Barricades and hazardous areas adjacent to but not located in normal
routes of travel shall be marked by red lantern at night.
4.0 Scaffolding:
4.1 Suitable scaffolding shall be provided for workman for all works that
cannot safely be done from ladders. When a ladder is used, an extra
mazdoor shall be engaged for holding the ladder and if the ladder is used
for carrying materials as well suitable footholds and handholds shall be
provided on the ladder and the same shall be given an inclination not
steeper that 1 in 4 (1 horizontal and 4 vertical).
4.2 Scaffolding or staging, more than 3.6 M. (12') above the ground or floor,
swing or suspended from an overhead support or erected with stationary
support shall have a guard rail properly attached, bolted, braced and
otherwise fixed at least 1.0 M (3') high above the floor or platform or
scaffoldingorstagingandextending along theentire lengthofthe outside
endsthereofwithonlysuchopeningsasmaybenecessaryforthedelivery
ofmaterials.Suchscaffoldingorstagingshallbesofastenedastoprevent it from
swaying from the building or structure.
4.3 Working platforms, gangways, and stairways should be soconstructed that
they should not sag unduly or inadequately and if the height of the
platform or the gangway of the stairway is more than 3.6 (12') above
ground level or floor level, they should be closely boarded, should have
adequatewidthandshouldbesuitablyfastenedasdescribedin4.2above.
4.4 Every opening in the floor of a building or in a working platform be
providedwithsuitablemeanstopreventthefailofpersonsormaterialsby
providing suitable fencing or railing whose minimum height shall be 1.0 M
4.5 Safe means of access shall be provided to all working platforms and other
working places. Every ladder shall be securely fixed. No portable single
ladder shall be over 9.0 M. (30') in length while the width between the
side rails in rung ladder shall in no case be less than 30 cms (12 inches)
for ladder up to and including 3.0 M. (10'), in longer ladders this width
wouldbeincreasedatleast6mm(1/4")foreachaddition30c.m.(1.0)of length.
Uniform step spacing shall not exceed 30 cms. (12"). Adequate precaution
shallbe taken topreventdanger from electricalequipment.No materials on
any of the side of work shall be so stacked or placed as to cause danger
or inconvenience to any person or public. The Contractor shall also
provide all necessary all necessary fencing and lights to protect the
workers and staff from accidents, and shall be bound to bear the
expenses of defense of every suit action or other proceedings at law that
may be brought by any persons for injury sustained owning to neglect of
the above precautions and to pay damages and costs which may be
awarded in any such suit or action or proceedings to any such person, or
which, may be with the consent of the Contractor be paid to compromise
any claim by any such person.
5.0 Excavation:
5.1 All trenches 1.2 M (4') or more in depth, shall at all time be supplied with
at least one ladder.
5.2 Ladder shall be extended bottom of the trench to at least 3" above the
surfaceof theground.Thesideof thetrenchwhichare1.5M (5')or more in
depth shall be stopped back to give suitable slope, or securely held by
timber bracing, so as to avoid the danger of sides to collapse. The
excavated materials shall not be placed within 1.5 M (5') of the trench of
halfofthetrenchdepthwhichever ismore.Cuttingshallbedonefrom top to
bottom. Under no circumstances, undermining or under cutting be done.
6.0 Demolition:
6.1 Beforeanydemolitionworkiscommencedandalsoduringtheprogressof the
work all roads and open area adjacent to the work site shall either be
closed or suitably protected.
6.2 Noelectriccableorapparatuswhichisliabletobeasourceofdangershall remain
electricity charged.
6.3 All practical steps shall be taken to prevent danger to persons employed
from risk of fire or explosion of flooding. No floor or other part of the
building shall be so over loaded with debris or materials as to render it
7.0 SafetyEquipment:
7.1 All necessary personal safety equipment as considered necessary by the
Engineer-In-Charge should be made available for the use of persons
employedonthe siteandmaintainedinaconditionsuitableforimmediate use,
and the Contractor should take adequate steps to ensure proper use of
equipment by those concerned.
7.2 Workersemployedonmixingasphalticmaterials,cementandlinemortars shall
be provided with protective footwear and protective gloves.
8.0 RiskyPlace:
8.1 When the work is done near any place where there is a risk of drowning,
all necessary safety equipment shall be provided and kept ready for use
and all necessary steps taken for prompt rescue of any person in danger
and adequate provision should be made for prompt first-aid treatment of
all injuries likely to be sustained during the course of the work.
9.0 HoistingEquipment:
9.1 Use of hoisting machines and tackles including their attachments, and
storage and supports shall conform to the following standards or
9.2 These shall be of good mechanical construction, sound material and
adequate strength and free from patent defect and shall be kept in good
condition and in good working order.
9.3 Every rope used in hoisting or lowering materials or as a means of
suspension shall be of durable quality and adequate strength and free
from patent defects.
9.4 Every crane driver or hoisting appliance operator shall be properly
qualified and no person under the age of 21 Years should be in-charge of
any hoisting machine including any scaffolding.
9.5 In case of every hoisting machine and of every chain ring hook, shackle,
swivel and pulley block used in hoisting or lowering or as means of
suspension, the safe working load shall be ascertained by adequate
means. Every hoisting machine and all gear referred to above shall be
plainly marked with the safe working load and the conditions under which
it is applicable shall be clearly indicated. No part of any machine or any
gear referred to above in this paragraph shall be loaded beyond the safe
working load except for the purpose of testing.
9.6 In case of departmental machine, the safe work load shall be notified by
the Engineer-In-Charge, as regards Contractor s machine, the Contractor
shall, notify, the safety working load of the machine to the Engineer-In-
Charge. Whenever the Contractor brings anymachineryto site ofworkhe
should get it verified by the Engineer-In-Charge concerned.
10.0 ElectricalEquipment:
Motors, gears, transmission, electric wiring and other dangerous parts of
hoisting appliances shall be provided with efficient safeguards, hoisting
appliances should be provided with such means when will reduce to the
minimum the risk of accidental descent of the load, adequate precautions
shall be taken to reduce to the minimum the risk of any part or a
suspended load becoming accidentally displaced. When workers are
employedonelectricalinstallationswhicharealreadyenergized,insulating
mats, wearing apparel such as gloves, and booths as may be necessary
shallbeprovided.Theworkersshallnotwearanyrings,watchesandcarry keys
or other materials which are good conductors of electricity.
11.0 MaintenanceofSafetyDevices:
All scaffolds, ladders and other safety devices as mentioned or described
herein shall be maintained in sound condition and no scaffold, ladder or
equipment shall be altered or removed while it is in use. Adequate
washing facilities should be provided at or near place of work.
12.0 DisplayofSafetyInstructions :
The safety provisions should be brought to the notice of all concerned by
display on a Notice Board at a prominent place at the work spot. The
persons responsible for compliance of the safety code shall be named
therein by the Contractor.
13.0 EnforcementofSafetyRegulations:
To ensure effective enforcement of the rules and regulations relating to
safetyprecautions,thearrangementmadebytheContractorshallbeopen to
inspection by the Welfare Officer, Engineer-In-Charge or Safety Engineer
of the owner or their representatives.
14.0 NoExemption:
14.1 Notwithstanding the above clause 1.0 to 13.0 there is nothing to exempt
theContractorfromtheoperationsofanyotherActorRulesinforceinthe Republic
14.2 In addition to the above, the Contractor shall abide by the safety code
provisions as per C.P.W.D. safety code framed from time to time.
GC-95 ACCIDENTS:
It shall be Contractor's responsibility to protect against accidents on the
works. He shall indemnify the owner against any claim for damage or for
injury to person or property resulting from, and in the course of work and
also under the provisions of the workman's compensation Act. On the
occurrence of an accident arising out of the works which results in death
orwhichissoseriousastobelikelytoresultindeath,theContractorshall within
twenty-four hours of such accident, report in writing to the Engineer-In-
Charge, the facts stating clearly and in sufficient details the circumstances
of such accident and the subsequent action. All other accidents on the
works involving injuries to person or damage to property other than that
of the Contractor shall be promptly reported to the Engineer-In-Charge,
stating clearly and in sufficient details the facts and circumstances of the
accidents and the action taken. In all cases, the Contractor shall
indemnity the owner against all loss or damage resulting directly or
indirectly from the Contractor's failure to report in the manner aforesaid.
This includes penalties or fines, if any, payable by the owner as a
consequence of failure to give notice under the Workman's
CompensationAct,orfailuretoconformtotheprovisionsofthesaidactin regard
to such accidents.
Intheeventof anaccidentinrespectofwhichcompensationmaybecome
payableunderthe Workman's Compensation Act VIII of1923 including all
modificationthereof,theEngineer-In-Chargemayretainoutofmoneydue and
payable to the Contractor such sum of sums of money as may in the
opinion of Engineer-In-Charge be sufficient to meet such liability. On
receipt of award from the Labour Commissioner in regard to quantum of
compensation, the difference in amount will be adjusted.
Addl/Asst.Engineer Dy.Ex.Engineer CITYENGINEER
SignatureofContractorwithSeal
TECHNICALSPECIFICATIONS
SRNO PARTICULARS
1 ScopeofContract
2 e-TENDERPrice
3 CompletionSchedule
4 GeneralTechnicalGuideline
5 ClassificationofStrata
B DETAILEDTECHNICALSPECIFICATION
B1 Materialspecification
1 Providing andtestingofSWGpipe
Providing and supplyingprecast M.H. & H.C.C. frame and
B2 Laborspecification
1 ExcavationandRefilling
2 ProvidingandlayingCCbeddingforpipes
3 Providingsand/granularbeddingforpipes
4 Lowering,layingandjointingofSWGandRCCNP3pipe
5 Removing surplusmaterials
6 Appurtenances
7 BreakingofAsphaltsurfaceandre-instatingofroad
C GENERALMATERIALSPECIFICATION
3 Reinforcement
5 DefinitionofIncompleteWork
6 Contractortoobserveallconditions
D ADDITIONALCONDITIONS
E SCHEDULEOFDRAWING
::TECHNICALSPECIFICATIONS::
1. SCOPEOFCONTRACT:
The work entitled comprise of excavation of trenches with shoring
and strutting wherever required bailing out water wherever
necessary, laying of pipes, jointing including supply of material and
material required for jointing, testing as per specifications,
Construction of appurtenances such as brick Masonry Manholes,
house chambers etc. as per the type design specified entirely of the
specification of various works stipulated in the e- Tender. The work
includes supply of sewer pipes i.e. stone ware pipes of ISI Marked
andR.C.C.precastmanholeframes&covers which shall haveto be
supplied at site or Municipal storebythecontractorat specified and
shown in schedule “B”. Other material like cement etc shall have to
supplied by the contractorfrom open market.
2. E-TENDERPRICE:
The rates quoted in the bill of quantities shall cover everything
necessaryforthedueandcompleteexecutionoftheworkaccording to the
drawings and other condition and stipulations of the contract
including specifications of the evident, intend and meaning of all or
either of them or according to customary usage and for periodical
and final inspection and test and proof of the work in every respect
and for measuring, numbering or weighing the same, including
setting out and laying or fixing in position and the provision of all
materials, power, tools, rammers, labor, tackle, platforms with
impervious lapped joints for scaffolding, ranging roads, straight
edged, cantering and boxing, wedges, molds, templates, posts,
straight rods, straight edged, cantering and boxing, wedges,
moulds, templates, posts, straight rails, boning staves strutting,
barriers,fencinglightingpumpingapparatus,temporaryarrangement for
passage of traffic access to premises and continuance to drainage
water supply and lighting (if interrupted by contractor’s work)
temporary sheds, painting, varnishing, polishing establishment for
efficient supervision and stating arrangements for the efficient
protective oflife and property and all requisite plant and machinery
The contractor shall keep every portion of the work clear of
accumulation from time to time and shall leave every portion of the
work clean, clear, perfect and at the conclusion of whole, providing
attheirowncostallsuchmaterialimplement,appliancesandlabour as the
Engineer in charge may requireto prove if it to be so.
3. COMPLETIONSCHEDULE:
The contract period shall be asprescribed in tenderdocument, from
the date of noticetoproceed. TheContractor shallsubmit
hiscompletionscheduleandtheprogramofworkstogetherwiththis e-
Tender in conformity with completion schedule given in the
4. GENERALTECHNICALGUIDELINE:
4.1 All the items occurring in the work and as found necessary
during actual execution shall be carried out in the best
workman like manner as per specifications and the written
order of the Engineer in charge
4.2 Extra Claim in respect of extra work shall be allowed only if
such work is ordered to be carried out in writing by the
Engineerin charge
4.3 The contractor shall engage a qualified Engineer for the
Execution of work who will remain present for all the time on
site and will receive instructions and orders from the Engineer
inchargeorhisauthorizedrepresentative.Theinstructionand
orders given to the contractor representative on site shall be
considered as it given to the contractor himself.
4.4 Theworkorderbookasprescribedshallbemaintainedon the site of
the work by the contactor and the contractor shall sign the
orders given by the inspecting offers and shall carry out them
4.5 Quantities specified in the e-Tender may vary at the time of
actual execution and the contractor shall have no claim for
compensationon accountofsuchvariation.
4.6 Unexcavated lengths shall be left wherever required and so
directed by the Engineer in charge during the currency of the
contractandshallbetackled.Ifrequired,beforecompletionof work.
4.7 Diversion of road, if necessary, shall be provided and
maintained during the currency of the contract by the
contractor at his cost.
4.8 Figured Dimensions of drawingshallsupersede measurements
by scale, special dimensions ordirections in
thespecificationsshallsupersedeallotherdimensions.
4.9 All levels are given on drawings and the contractor shall be
responsible to take regular level on the approved alignment
before actually starting the work. The levels shall be
commencetotheG.T.S.levelsandshallbegotapprovedfrom the
Engineer in charge
4.10 If the arrangement of temporary drainage is required to be
madeduringanyworkofthisContract,thisshallbemadeby the
Contractor without claiming any extra cost.
5. CLASSIFICATIONOFSTRATA:
5.1 All materials encountered in excavation will be classified in
the following groups irrespective of mode of excavating the
materials and the decision of the Engineer in charge in this
regardshallbe finaland bindingto the contractor.
Soils of all sorts, silt, sand, gravel, soft murrum, stiff clay,
kunkar and other soft excavation not covered in the items
mentioned hereunder.
5.3 HardMurrum:
Hard Materials comprising of all kinds of disintegrated rock
or shale or indurate conglomerate interspersed with
boulders, weathered and decomposed rock which could be
removed with pick, bar, shove, wedges and hammers,
though not without some difficulties.
This shall include all materials which is rock but which does
not need blasting and can be removed with a pick bar,
wedges, pavement breakers, pneumatic tools etc.
This shall include rock accusinginmassorboulders which
need blasting, this will also include rock to be removed by
chiseling oranyothermethodwhereblastingis not
6. Theratesareinclusiveofdewatering,ifrequired.
7. Regarding water supply for hydro testing, necessary water, power,
labour, etc. required for necessary test shall be arranged by the
contractor at his own cost.
8. During construction activity, proper care must be taken for labour
safety and must follow the provisions of the Labour laws.
9. TMT bars of Fe-500 should be confirming to IS:1786. The approved
makes shall be TATA, SAIL, Vizag, Gallent, Electrotherm or other
equivalent make as approved by engineer-in-charge.
10. CementshallbeordinaryPortlandcement53Gradeconformingto
IS:269, IS:8112 orIS:12269for all theworksas per theinstructions of
engineer-in charge. The approved makes shall be Ambuja, Ultratect,
LOTUS,HathiorasperISconfirming.MinimumCementcontentfor the work
should be as per attached circular No.RMC/C/Vigi.(Tech)/231 dt.
11. Testing of the materials like Brick, Sand, Aggregate, Reinforcement
steel, etc. should have to be tested periodically as suggested by the
Engineer-in-charge at Government approved material testing
Laboratory and testing charges for the same has to be borne by the
12. In case of any ambiguity found in inspections / drawings etc, the
decision of engineer-in-charge shall be final and binding to the
A. DETAILEDTECHNICALSPECIFICATIONS
B1 MATERIALSPECIFICATION
Water shall not be salty or brackish and shall be clean, reasonably clear and
freefrom objectionable quantities ofsilt and traces ofoil andinjurious alkalis,
salts, organic matter and other deleterious material which will either weaken
the mortar of concrete or cause efflorescence or attack thesteel in RCC
container for transport, storage and handling of water shall be clean. Water
shall conform to the standards specified in I.S. 456 - Latest edition.
If required by the engineer-in-charge, it shall be tested by comparison with
distilledwater.Comparisonshallbemadebymeansofstandard cementtests
forsoundness,changeintimeofsettingandmortarstrengthasspecifiedin
I.S. 269 (Latest edition). Any indication of unsoundness, change in time of
setting by 30 minutes or more or decrease of more than
10percentinstrengthofmortarpreparedwithwatersamplewhen compared with
the results obtained with mortar prepared with distilled water shall be
sufficient cause for rejection of water under test.
Water for curing mortar, concrete or masonry should not be too acidic or too
alkaline. It shall be free of elements which significantly affect the hydration
reaction or otherwise interfere with the hardening of mortar or concrete
during curing or those which produce objectionable stains or other unsightly
deposits on concrete or mortar surface.
Hardandbitterwatershallnotbeusedforcuring.
Potablewaterwillgenerallyfoundsuitableforcuringmortarofconcrete.
Lime shall be hydraulic lime as per I S 712 - Latest Edition. Necessary tests
shall be carried out as per I S6932 9 (Parts I to X) Latest edition.
Thefollowingfieldtestsforlimesaretobecarriedout:
i) Averyroughideacanbeformedaboutthetypeoflimebyitsvisual
examination i.e. fat lime bears pure white color, lime in form of
porous lumps of dirty white color indicates quick lime and solid
lumps are the unburnt lime stone.
ii) Acid tests for determining the carbonate content in lime, lime
Excessive amount of impurities and rough determination of lime.
Storage shall comply with I S712 - Latest Edition. The slakedlime, it stored,
shall be kept in a weather proof and damp-proof shed with impervious floor
and sides to protect it against rain, moisture, andweather and extraneous
materials mixing with it. All lime that has been damaged in any way shall be
and all rejected materials shall be removed from site of work.
Field testing shall be done according to I S 269 (latest edition) to show the
acceptability of materials.
Cement shall be ordinary Portland cement as per IS:269 or IS:8112 and
IS:12669 (All Latest edition).
M-4 WhiteCement:
ThewhitecementshallconformtoIS8042-ELatestedition.
M-5 ColoredCement:
Color cement shall be with white or grey Portland cement as specified in the
item of the work.
The pigments used for colored cement shall be of approved quality and shall
not exceed 10% of cement used in the mix. The mixture of pigmentand
cement shall be properly ground to have a uniform color and shade. The
pigments shall have such properties as to provide for durability under
exposure to sunlight and weather.
The pigment shall have the property such that it is neither affected by the
cement nor detrimental to it.
Sand shall be natural sand or silica, clean well graded, hard strong, durable
and gritty particles free from injurious amounts of dust, clay,kankarnodules,
soft or flaky particles Shale, alkali, salts organic matter, loam, mica
orotherdeleterioussubstancesandshallbegot approved fromtheengineer- in-
charge. The sand shall not contain more than 8 percent of silt as determined
by field test. If necessary, the sand shall bewashed to make it clean.
The fineness modules of coarse sand shall not be less than 2.5 and shall not
exceed 3.0. The sieve analysis of coarse shall be as under:
I.S. Sieve Percentagebyweight ISSievepercentage byweight
Designation passing sieve Designation percent-
2.36mm 90to 100 300Micron 5-70
Thefinenessmodulesshallnotexceed1.0Thesieveanalysisoffinesand shall be as
I.S.Sieve Percentagebyweight ISSievepercentage byweight
Designation passingsieve Designation percent-
4.75mm 100 600Micron 40-85
2.36mm 100 300Micron 5-50
Thisshallbeobtainedfrom crushing hard blacktrap or equivalent. Itshall not
contain more than 8% of silt as determined by field test withmeasuring
cylinder. The method of determining silt contents by fields testis given as
A sample of stone dust to be tested shall be placed without drying in 200mm
measuring cylinder. The quantity if the sample shall be such that it fills the
cylinder up to 100 mm mark, the clean water shall be added up to
150 mm mark. The mixture shall be stirred vigorously and content allowed to
settle for 3 hours.
The height of silt visible as settled layer above the stone dust shall be
expressed as percentage of the height of the stone dust below. The stone
containing more than 8% silt shall be washed so as to bring the content
within the allowable limit.
Thefitnessnodulesofstonedustshallnotbelessthan1.80
Grit shall consist of crushed or broken stone and be hard, strong dense
durable clean of proper gradation and free from skin or coating likely to
preventproperadhesionofmortar.Gritshallgenerallybecubicalinshape and as far
as possible flaky elongated pieces shall be avoided. It shall generally comply
with the provisions of IS 383 (Latest Edition). Unless special stone of
particular quarries is mentioned, grit shall be obtained from the best black
trap or equivalent hard stone as approved by the engineer-in-charge. Thegrit
shall have no deleterious reaction with cement.
Thegritshallconformtothefollowinggradationaspersieveanalysis:
I.S. Sieve Percentagepassing IS Sieve percentagepass-
Designation through sieve Designation ingthroughsieve
Thecrushingstrength willbesuchastoallowtheconcreteinwhichit usedto build up
the specified strength of concrete.
Thenecessarytestsforgrit shall becarriedout aspertherequirements of S
(Part I to VIII) Latest edition as per instruction of engineer-in- charge. The
necessity of test will be decided by the engineer-in-charge.
Cinder is well burnt furnace residue which has been fused or sintered into
lumps of varying sizes.
Cinderaggregatesshall bewellburnt furnacesresidue obtained from furnace
using coal fuel only. It shall be sound clean and free from clay, dirt, ash or
other deleterious matter.
Theaveragegradingforcinderaggregateshallbeasmentionedbelow:
I.S. Sieve Percentagepassing IS Sieve percentagepass-
Designation Designation ing
M-10 LimeMortar:
Lime: Lime shall conform to specification M-2. Water: Water shall conform
to specification M-1. Sand: Sand shall conform to specification M-6.
ProportionofMix:
Mortar shall consist of such proportions of slaked lime and sand as may be
specifiedinitem. the slakedlime andsand shall be measured by volume.
PreparationofMortar:
Lime mortar shall be prepared by process as per IS 1625 Latest edition.
Powerdrive millshall beusedforpreparationoflime mortar.Theslaked lime shall
be placed in the mill in an even layer and ground for 180 revolutions with a
sufficient water. Water shall be added as required duringgridding(care being
taken not to add more water) that will bring themixed material to a
consistencyofstiffpaste.Thoroughlywettedsand shallthenbeaddedevenly and
the mixture ground for another 180 revolutions.
Mortar shall always be kept damp, protected from sun and rain till used up,
covering it by tarpaulin or open sheds.
All mortar shall be used as soon as possible after grinding. It should be used
on the day on which it prepared. But in no case, mortar made earlier than
hours shall be permitted for use.
M-11 CementMortar:
Water shall conform to specification M-1. Cement: Cement shall conform to
specifications M-3. Sand: Sand shall conform to M-6.
ProportionofMix:
Cement and sand shall be mixed to specified proportion, sand being
measured by measuring boxes. The proportion of cement will be by volume
on the basis of 50 kg/Bag of cement being equal to 0.342 Cu.M. The mortar
may be hand mixed as directed.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01-05-26 Retender Gondal Chokdi FOB.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .