| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-Finance | ₹3.9 L | L1 | Accepted-Finance Recommended subject to the condition of submission of work experience certificate of similar nature work along with requisite value of work order |
| 2 | L2₹4.0 LAccepted-Finance | ₹4.0 L | L2 | Accepted-Finance Recommended subject to the condition that estate officer should ensure receipt of labour licence in accordance with the undertaking given by the firm |
| 3 | L3₹4.7 LAccepted-Finance | ₹4.7 L | L3 | Accepted-Finance Complied |
| 4 | Rejected-Technical H NO 437 42 PROFESSER COLONY DHAN NADI RAOD AJMER RAJASTHAN 305007 | AJMER | RAJASTHAN | 305007 | - | - | Rejected-Technical NOT RECOMMENDED |
Tender Value
₹5.0 L
EMD Value
₹10,089
Closing Date
16 Apr 2021, 4:00 pmClosed
DIGP
TO THE DIGP GC CRPF GANDHINAGAR
REPAIR AND CONSTRUCTION OF BOUNDARY WALL BY USE OF BRICK MASONARY STONE MASONARY RCC AND FIXING OF IRON ANGLE ON TOP OF BOUNDARY WALL
2021_CRPF_624668_1
B.V.01/2020-21-MW(ARMO) GC GNR
Open Tender
Civil Works
Works
60 days
GC CRPF GANDHINAGAR
13 documents required · 13 mandatory
₹0
₹10,089
Yes
15 Sept 2021
30 Mar 2021
17 Apr 2021
31 Mar 2021
16 Apr 2021
31 Mar 2021
31 Mar 2021 - 16 Apr 2021
Excavation work by echanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms,lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : Ratio of 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) .
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : ratio of 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size).
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : Ratio of 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded tone aggregate 20 mm nominal size).
Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in cement mortar 1:4 (1 cement : 4 coarse sand) .
12 mm cement plaster of mix ratio of 1:4 (1 cement: 4 coarse sand).
Structural steel work in single section, fixed with or without connecting plate,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete.
Lintels, beams, plinth beams, girders, bressumers and cantilevers.
Columns, Pillars, Piers, Abutments, Posts and Struts .
Coursed rubble masonry (first sort) with hard stone in foundation and plinth with : Cement mortar 1:6 (1 cement : 6 coarse sand).
Coursed rubble masonry (second sort) with hard stone in foundation & plinth with : Cement mortar 1:6 Ratio of (1 cement : 6 coarse sand).
Priti Electronics Services
Siya Entrprise
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].