Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹1.6 LAccepted-AOC CALICUT ROAD KAKKATTIL CALICUT | KOZHIKODE | KERALA | 612906 | ₹1.6 L | 2 | Accepted-AOC LOWEST |
| 2 | Rejected-Technical | - | - | Rejected-Technical highest bid |
| Sl No | Description | Qty | Unit | KALPETTA ZONE LABOUR CONTRCT CO-OPERATIVE SOCIETY LTD L2 | NOUFAL K K L1 |
|---|---|---|---|---|---|
| 1.00MAINTANANCE | |||||
| 1.00 | 50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 1.73 | cum | 8,367.28 ₹14,441.93 | 8,300 ₹14,325.8 Lowest |
| 1.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 0.55 | cum | 12,546 ₹6,925.39 Lowest | 12,546 ₹6,925.39 Lowest |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1.44 | sqm | 712.02 ₹1,025.31 | 712 ₹1,025.28 Lowest |
| 1.00 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 2.46 | sqm | 897.16 ₹2,207.01 | 897 ₹2,206.62 Lowest |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 38.64 | kilogram | 104.93 ₹4,054.5 | 104.9 ₹4,053.34 Lowest |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 33.49 | sqm | 345.11 ₹11,557.73 | 345 ₹11,554.05 Lowest |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.92 | cum | 7,404.03 ₹6,796.9 | 7,404 ₹6,796.87 Lowest |
| 1.01 | 11.41.1:Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 500x500 mm. | 13.92 | sqm | 1,561.75 ₹21,739.56 | 1,561 ₹21,729.12 Lowest |
| 1.01 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 61.8 | kg | 174.58 ₹10,789.04 | 174 ₹10,753.2 Lowest |
Tender Value
₹1.6 L
EMD Value
₹4,106
Closing Date
10 Mar 2026, 6:00 pmClosed
AE LIDEW Section Kottathara GP
AE LIDEW Section Kottathara
Improvements to Aneri Second Anganvadi
2026_LSGD_843009_3
TN/005/AE/LIDEW/KTRA/2025-26
Open Tender
Civil Works - Buildings
Item Rate
180 days
Kottathara GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
₹4,106
Yes
7 Aug 2026
3 Mar 2026
12 Mar 2026
3 Mar 2026
10 Mar 2026
3 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1MAINTANANCE | |||||
| 1.001 | 50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | - | cum | - | - |
| 1.002 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | - | - |
| 1.003 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1 | sqm | - | - |
| 1.004 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - |
| 1.005 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
| 1.006 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | - | sqm | - | - |
| 1.007 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.008 | 11.41.1:Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 500x500 mm. | - | sqm | - | - |
| 1.009 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 1 | kg | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1422764.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.09 MB
Tendernotice_2.pdf
PDF • 0.11 MB
Tendernotice_3.pdf
PDF • 0.05 MB
Tendernotice_4.pdf
PDF • 0.11 MB
Tendernotice_5.pdf
PDF • 0.05 MB
Tendernotice_6.pdf
PDF • 0.13 MB
BOQ_1422764.xls
BOQ • 0.31 MB
SBD105.pdf
Tender Documents • 1.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .