Tender Value
₹1.4 L
EMD Value
₹1,380
Closing Date
30 Mar 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Chief Officer, Tarsadi Nagarpalika
Construction Work of Entry Gate A S,R, No. 435 Lack, At Tarsadi, Dist: - Surat Under Swarnim Jayanti Mukhyamantri Shaheri Vikas Yojana Year 2022 23.
287861
Tender 03/2026 Work No.12 Gate
Open
Civil Works - Buildings
Surat
1 document required · 1 mandatory
₹600
Chief officer Tarsadi Nagarpalika
₹1,380
18 Mar 2026
18 Mar 2026
18 Mar 2026
30 Mar 2026
18 Mar 2026
NAME OF WORK :- CONSTRUCTION WORK OF ENTRY GATE
Location :- AT- S.R. NO 435 LACK,TARSADI, DIST-SURAT
PERCENTAGE RATE TENDER
Item No. & Description Qty. Rate Per Amount
Excavation for foundation upto 1.5 m depth
including sorting out and stacking of useful
materials and disposing off the excavated stuff
all lead & Lift.(B) Dense or Hard soil
Excavation for foundation for depth from 1.5 m
to 3.0 m including sorting out and stacking of
useful materials and disposing off the
excavated stuff all lead & Lift.(C) Hard Murrum
Providing and laying cement concrete 1:3:6 (1-
Cement : 3- coarse sand : 6- hand broken stone
aggregates 40 mmnominal size) and curing 1.75 3253.21 Cumt.
complete excluding cost of formwork in (A)
Foundation and Plinth
Providing and laying controlled cement concrete
M.200 and curing complete excluding the cost
of formwork and reinforcement for reinforced
concrete work in (A) Foundations, footings,
Base of columns and Mass concrete
Providing and laying controlled cement concrete
M.200 and curing complete excluding the cost
of formwork and reinforcement for reinforced
concrete work in (C) 0.74 6385.22 Cumt.
Slabs,landing,shelves,Balconies Lintels,
Beams, Girders and Cantilever upto floor two
level. Plinth Beam.
Providing and laying controlled cement concrete
M.200 and curing complete excluding the cost
of formwork and reinforcement for reinforced
concrete work in (D) Columns, Pillars posts and
struts upto floor two level. G. F.
Providing TMT Bar FE 500D reinforcement for
R.C.C. work including bending, binding and
placing in position complete upto floor two level
Filling available excavated earth (excluding
rock) in trenches. plinth, sides of foundations
etc. in layers not exceeding 20 cm. in depth 22.37 136.71 Cumt.
consolidating each disposited layer by ramming
Brick work using common burnt clay building
bricks having crushing strength not less than
kg./Sq.Cm. in foundation and plinth in Cement 3.00 4533.81 Cumt.
Mortar 1:5. (1- Cement : 5 -fine sand) (B)
Providing 20 mm thick double coat mala
cement plaster on interior brick / concrete work
for plastering comprising of base coat of 12 mm
thick cement plaster in cement mortar (1
Cement : 4 coarse sand) in rough finishing and 7.92 286.10 Sqmt
8 mm thick top coat of cement mortar 1:2 (1
Cement : 2 Coarse sand) finished with trovel
including scaffolding curing etc. complete.
Finishing wall with weather proof exterior
emulsion paint on wall surface (two coats) to
give an required shape even shade after
thoroughly brushing the surface to remove all
dirt, and remains of loose powdered
materials.etc complete
Steel work, welded in built up sections framed
work including cutting, hoisting, fixing in position
and applying a priming coat of red lead paint.
(A)In beams and joists, channels angles Tees,
flats, with connecting plates or angle cleats as
in main and cross beams. Hip and jack rafters,
purlins conneted to common rafters and the like
Applying priming coat over new steel and other
metel surface after and including preparing the
surface by throughly cleaning, oil,grease, dirt
and other foreign matter and scoured with 11.16 36.74 Sqmt
brushes fine steel wood, scrapers and sand
paper with ready mixed priming paint brushing
Painting two coats (excluding priming coat) on
new steel and other metal surface with enamel
paint, brushing, interior to give an even shade
including cleaning the surface an even shade
including cleanicn the surface of all dirt, dust
and other foreign matter.
Total Amount Rs………..
Total Amount Rs………..
Say Amount Rs………..
I/We am/are willing to carry out the work @ ________% Above / Below__________Percentage (should
be writen in figures and words) of the Estimated rates mentioned above amount of my / our Tender works
Estimated Amount Estimated Amount
Put to Tender Rs. 1,37,281=00 Put to Tender Rs. 1,37,281=00
Add % Rs. Deduct %Rs.
Total Rs. Total Rs.
(In Words (In Words
Stamp with Signature of Contractor
Consl.Engineer Engineer
"DESIGN POINT" Tarsadi Nagarpalika
Chief Officer President
Tarsadi Nagarpalika Tarsadi Nagarpalika
Tarsadi Tarsadi
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 Tender.pdf
02 Form B-1.pdf
03 Schedule B.pdf
04 Term and Condition.pdf
05 SPECIFICATIONS BUILDING WORK.pdf
06 Vendor List.pdf
07 TEST REQUIRE FOR CONSTRUCTION MATERIAL.pdf
08 GR_(2025).pdf
Download all tender documents and submit your bid