Loading…
Loading…
Tender Value
₹17.1 L
EMD Value
₹42,740
Closing Date
17 Jul 2026, 3:00 pm
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER PH DIVISION KOLLAM
O and M Water Supply Schemes ANNUAL MAINTENANCE 2025 26 RWSS Thrikkaruva Rectification of leakage blockages etc in various size of pipelines in distribution network and other related works in Thrikkaruva Panchayath General Civil Work
2026_KWA_859671_1
22/2026-27/EEPHDNK/RTR/16793
Open Tender
Civil Works - Water Works
365 days
THRIKKARUVA
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,760
₹42,740
8 Jul 2026
8 Jul 2026
18 Jul 2026
8 Jul 2026
17 Jul 2026
8 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Working charges | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | - | cum | - | - |
| 1.003 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | - | - |
| 1.004 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | - | metre | - | - |
| 1.005 | 15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road | - | sqm | - | - |
| 1.006 | 100.47.1.3:Leak rectification work in 50mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. | - | no | - | - |
| 1.007 | 100.47.1.4:Leak rectification work in 63mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. | - | no | - | - |
| 1.008 | 100.47.1.5:Leak rectification work in 75mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. | - | no | - | - |
| 1.009 | 100.47.1.6:Leak rectification work in 90mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. | - | no | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.04 MB
GENERALSPECIALCONDITION1.pdf
Additional Documents • 0.03 MB
22RTRNITTHRI.pdf
Additional Documents • 0.43 MB
SPECIALCONDITIONFORTHEMAINTENANCEWORK_NEW.pdf
Tender Documents • 0.01 MB
BOQ_1453637.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid