Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
20 Mar 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM(P AND P)UC
DEPUTY GENERAL MANAGER PROJECTS AND PLANNING PD ADMINSTRATION FACT
ANNUAL CLEANING OF BOILERS IN THERMAL PLANT - II
2024_FACT_797564_1
5050/2023-2024/E29034
Limited
Miscellaneous Works
Item Rate
365 days
Udyogamandal
LIMITED TENDER
5 documents required · 5 mandatory
₹0
₹12,000
Yes
21 Mar 2024
27 Feb 2024
21 Mar 2024
27 Feb 2024
20 Mar 2024
27 Feb 2024
ANNUAL CLEANING OF BOILERS IN THERMAL PLANT - II
Cleaning of Boiler in PD-CPP, water wall tubes in furnace area, bank tubes, LTSH, PSH, FSH, penthouse area, boiler drum inside, drum internals etc., after providing adequate scaffolding. Cleaning and removal of accumulated soot in the flue gas duct, air duct, ID fan casing etc., as per the instruction of Plant Manager or his authorized representative. The removed soot should be safely collected in sacks and disposed to non-decayable yard .
Cleaning of both passes of Air Preheater in PD-CPP. The individual tubes are to be cleaned by removing accumulated soot, either by pushing out with flexible hose or using water as per the instruction of Plant Manager .
Cleaning and removal of accumulated soot in the first and second flue gas path and Chimney bottom of startup boiler in PD-CPP. Cleaning of individual flue gas tubes thoroughly as per the instruction of Plant Manager or his authorized representative . The removed soot should be collected in sacks and disposed to non–decayable yard .
Cleaning of PD-CPP Main chimney bottom and removal of accumulated soot. The Removed soot should be collected in sacks and disposed to non-decayable yard.
Hydraulic testing of Boilers by High pressure pump. Internal hydraulic test has to be carried out for confirming the leak of pressure parts of Boilers and same has to be carried out in the presence of Boiler Inspector.
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .