Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC 23A 1 SHAKTI VIHAR TANKI ROAD BADARPUR NEW DELHI 110 044 | SOUTH EAST | DELHI | 110044 | L1 | Accepted-AOC Lowest Bid | |
| 2 | L2₹9.3 L+₹80,410 (9.47%)Rejected-Finance | L2 | Rejected-Finance other than lowest |
Tender Value
₹8.2 L
EMD Value
₹16,400
Closing Date
12 Mar 2022, 6:00 pmClosed
Estate Manager, EMU Delhi
Estate Management Unit DRDO, Lucknow Road, Timarpur Delhi
Maintenance of various air conditioners at DRDO Complex Timarpur
2022_DRDO_674427_1
92051/EMUDEL/AC/TMPR/2021-2022
Limited
Miscellaneous Works
Item Rate
365 days
DRDO Residential Complex, Timarpur
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹16,400
Yes
23 Mar 2022
18 Feb 2022
14 Mar 2022
18 Feb 2022
12 Mar 2022
19 Feb 2022
19 Feb 2022 - 28 Feb 2022
Amount
Maintenance of following split/window type air conditioners including voltage stablizer by replacement minor spare parts line, thermostate, filter pads, contactors capacitors relays, control wiring complete as per instructions of Engineer-in-Charge. (Deployment of atleast one AC mechanic along with one AC technician from 0800 hrs to 2000 hrs minimum from Date of Commencement of Work to 31st Oct 2022 and 1st Mar 2023 to date of validity of contract at site on all working days is mandatory)
EMU Office
1.5 ton window air conditioner
2.0 ton Split air conditioner
Day Care and Family Welfare Centre
1.5 ton window air conditioner
1.5 ton Split air conditioner
1.5 ton window air conditioner
2 ton Window air conditioner
ANNEXE & PMO
3 ton capacity tower air conditioners
2 ton Split air conditioner
Anusandhan Vihar
Maintenance of 3.6 TR floor standing type Air conditioners make Daiken along with refrigerant piping, cables etc all complete including maintenance of 3 phase 2 HP capacity blower 2900 RPM with inlet/outlet existing duct connection facility (2 Nos). Including pressure testing, vacuumization etc all complete.
Gas filling R-22 or refrigerant as approved by Engineer-in-Charge
Part B
Supply the following replacable spare parts at site. The rates quoted shall be after considering the credit of old items etc. (The Rate only items shall be executed on as and when required basis only. The quantities mentioned could vary at the time of execution of work).
Replacement of compressor capacity 3.6 TR make Daikin
Replacement of compressor capacity 3.0 TR for tower Acs
Replacement of compressor for window air conditioner 1.5 ton
Replacement of compressor for window air conditioner 2.0 ton
Replacement of compressor for split air conditioner 1.5 ton
Replacement of compressor for split air conditioner 2.0 ton
Removal of outdoor unit/FCU and Replacement of outdoor FCU including installation of Split air conditioners 1.5 tonne
Removal of outdoor unit/FCU and Replacement of outdoor FCU including installation of Split air conditioners 2.0 tonne
Repair of Control Card of Daikin Acs 3.6 TR
Replacement of Control Card of Daikin Acs 3.6 TR
Repair of PCB for 1.5 - 2.0 TR Window/Split Acs
Replacement of PCB for 1.5 - 2.0 TR Window/Split Acs
Dismantling Charges Window AC or Portable AC
Dismantling Charges Split AC
Installation Charges Window AC or Portable AC
Installation Charges Split AC
CLYMATE CONTROL
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .