Loading…
Loading…
Tender Value
₹5.6 L
EMD Value
₹6,000
Closing Date
14 May 2026, 6:00 pmClosed
Executive Engineer, Anand Irrigation Division Anand.
Desilting , Jungle Cutting And Removing Debries of various Canal Under the Kunjrav Section
302242
01 of 2026-2027
Open
Miscellaneous Works
Anand
6 documents required · 5 mandatory · 1 optional
₹900
Executive Engineer Anand Irrigation Division Anand
₹6,000
7 May 2026
7 May 2026
7 May 2026
14 May 2026
7 May 2026
Memorandum showing items of works to be carried out
Desilting , Jungle Cutting And Removing Debries of various Canal Under the Kunjrav
Item No Descripation of Item Quantity Unit Amount
Clearing the shrubs, like akadas, weeds and
other vegetables including depositing the
same outside and burning etc. complete
from canal bed, top and both slopes of the
banks, for canal with discharge.Below
Clearing the silt from the canal/drain bed
by a digging the same to the required bed
level and gradient including depositing the
excavated earth regularly in spoil bank for
utilizing the same preparing the banks after
breaking clods as and where directed for all
leads and lifts.For Canals Below
Cusec. & 0 to 1.5 m lift.
Clearing the silt from the CANAL BED /
SLOPE by digging the same to the required
bed level and gradient including depositing
the excavated earth regularly in spoil bank
for utilizing the same preparing the banks
after breaking clods as and where directed
for lead upto 50 m. and all lifts.(BY
Clearing the silt/debris from the pipe
culvert/syphon/ syphon well. Underground
pipe drain/box drain for Drain/Canal by
4 digging the same including depositing the 135.00 meter 548.70
excavated earth/debris etc. for all leads and
lift. For pipe culvert/ Syphon. (i) Upto
900 mm dia. Pipe.
Rs. Five Lac Fifty Eight Thousand Six Hundred Ninety Eight & Sixty Two Paise Only
I / We am /are willing to carry out the work at .....-....... % above /below..........-......................
.................................................( percent should written in figures and words )
of the estimated rate mentioned above.Amount of my / our tender work out as under.
Estimated amount Put to tender Estimated amount Put to tender
Deduct :- ____ % Below Add ____ % above
In words Rs. In words Rs.
Notes 1 - The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
Notes 2 - The labour cess will be deducted as pe rprevailing rules i.e.1% of the work done.
Notes 3 - GST and Incometax TDS will be deducted at a source while making payments of bills.
Note 4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.:PRC-10/2017CementConsumption/16/CDate:11/05/2017as stated in
S.O.R.therefore in R.C.C.items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the rate of input rate
mentioned in all the tender.
Deputy Executive Engineer
Signature of contractor. Ode Irrigation Sub Division
Price Adjustment Statement
Name of Work:- Desilting , Jungle Cutting And Removing Debries of various Canal Under the Kunjrav Section
Qty Brake up of Rate Brack Up Amount
Estimated Without GST Rate
Item No. Item of work Unit Amount (Rs.) Plant & Net Amount
but may be (Rs.) Plant &
more or less Labour Cement Steel Bitumen POL Machinery Other Material Labour Cement Steel Bitumen POL Other Material
Machinery Spares
Clearing the shrubs, like akadas, weeds and other
vegetables including depositing the same outside and
burning etc. complete from canal bed, top and both slopes
of the banks, for canal with discharge.Below 20 Cusec.
Clearing the silt from the canal/drain bed by a digging the
same to the required bed level and gradient including
depositing the excavated earth regularly in spoil bank for
utilizing the same preparing the banks after breaking clods
as and where directed for all leads and lifts.For Canals
Below 20 Cusec. & 0 to 1.5 m lift.
Clearing the silt from the CANAL BED / SLOPE by digging
the same to the required bed level and gradient including
depositing the excavated earth regularly in spoil bank for
utilizing the same preparing the banks after breaking clods
as and where directed for lead upto 50 m. and all lifts.(BY
Clearing the silt/debris from the pipe culvert/syphon/
syphon well. Underground pipe drain/box drain for
4 Drain/Canal by digging the same including depositing the 135.00 548.70 meter 74074.50 543.97 0.00 0.00 0.00 4.73 0.00 0.00 73435.95 0.00 0.00 0.00 638.55 0.00 0.00
excavated earth/debris etc. for all leads and lift. For pipe
culvert/ Syphon. (i) Upto 900 mm dia. Pipe.
Deputy Executive Engineer Executive Engineer
Ode Irrigation Sub Division Anand Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Front Page.pdf
2 Certificate Final.pdf
3 Notice Inviting online Tender.pdf
4.SBD Book.pdf
5.Item Technical Specification.pdf
7. BOQ AND POL.pdf
Tender Notice-01 of 2026-27 Online.pdf
Download all tender documents and submit your bid