Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.1 L+₹5,847.42 (2.86%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.1 L+₹6,461.40 (3.16%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹2.1 L+₹7,280.04 (3.56%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
EMD Value
₹5,840
Closing Date
1 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW BARAMULLA
EXECUTIVE ENGINEER REW BARAMULLA
Tile work at middle school zandfran under ADP DDC for the year 2026-27 p/h Zandfran block NARWAHA
2026_RDPR_316144_20
118/Xen/Rew/Bla/2026-27 Dated 15/07/2026
Open Tender
Civil Works
Percentage
30 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹5,840
6 Aug 2026
15 Jul 2026
3 Aug 2026
15 Jul 2026
1 Aug 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | desmentling and demolishing cement concrete flooring incl disposal of unservisable material | 62.91 | sqm | - | - |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 6.13 | cum | 1 | ₹6.12 |
| 3 | Providing and fixing Ist quality vetrified d wall/ floor tiles conforming to IS : 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades 600mm* 600mm | 120.83 | sqm | - | - |
| 4 | p/fixing of 16mm thick HDHMR sheets ceilling single side laminated incl all accesssiors used complete job | 540 | sft | - | - |
| 5 | p/f of wooden frames for ceilling KD wood incl all acessiours copmlete job | 18.5 | cft | - | - |
| 6 | Carraige of sand/aggregate by mt 10km | 8.25 | cum | - | - |
| 7 | add for sighn board to b paid as per actual | 1 | no | - | - |
stage.html
html • 0.02 MB
finance_1029712.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
BOQ_1029712.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .