Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAdmitted-Finance | ₹2.3 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | ASSOCIATED CONSTRUCTORS L1 |
|---|---|---|---|---|
| 1.00 | Biennial Maintenance contract for execution of:-
A) Building work (Vol-I) as per PWDSOR (WC-II) Govt. of W.B as per relevant books effective from 01.11.2017 up to 15th addendum & corrigendum w.e.f 07.09.2022 thereof.
B) Sanitary & plumbing work (Vol-II) as per PWDSOR (WC-II) Govt. of W.B as per relevant book effective from 01.11.2017 up to 7th addendum & corrigendum w.e.f 22.01.2020 thereof.
C) Roads work, Bridge & culverts work and carriage etc. (Vol-III) as per PWDSOR Govt. of W.B for works as per relevant books effective from 30.08.2018 up to 10th addendum & corrigendum w.e.f 24.08.2022 thereof.
Payable quantity will be as per execution at actual and rates for payment will be on the basis of rates given in above WBPWD schedule for different items. | 1 | Activity Unit | 1,56,00,000 ₹1,56,00,000 Lowest |
| 2.00 | Maintenance of Aquarium at BTPS Guest House [Gongotri] for changing of different types of colour fishes, food, medicine for treatment of water, time to time change of ater, maintenance of pumps etc. all charges complete. | 40 | Each | 3,855.6 ₹1,54,224 Lowest |
| 3.00 | Supply of unskilled listed worker for sanitary & plumbing works and other works of miscellaneous nature on as and when required basis. | 626 | Man Day | 1,372.7 ₹8,59,310.2 Lowest |
| 4.00 | Differential wage rate to accommodate existing labour (covered under settlement) wages at BTPS with respect to the assumed/estimated wage rate as per WBPDSOR [Manday means working day including CL, EL & holiday] | 5,634 | Man Day | 891.25 ₹50,21,302.5 Lowest |
| 5.00 | A) Cost of PPE and Liveries for listed workers for 02 years period [i) soap 6 nos per month, ii) Duster 04 nos per year, iii) Helmet 01 no per 2 year iv) Safety shoe 01 pair per 2 years, v) Hand gloves 01 pair per month, vi) Nose guard 02 nos per month].
B) Cost of PPE for 02 Non-listed worker for 02 years period [i) Safety shoe 01 pair per 2 years, ii) Hand gloves 01 pair per month, iii) Helmet 01 no per 2 year, iv) Nose guard 02 nos per month].[As per Analysis prepared by HR&A departament] The PPE quantities are indicative only but does not absolve the responsibility of executing agency to maintain the safety standard applicable within factory area. | 1 | Activity Unit | 1,09,518.08 ₹1,09,518.08 Lowest |
| 6.00 | Laying of 38mm thick acid proof tiles in floors, wall and drains with acid proof cement mortar including application of primer and 6mm thick of potassium silicate mortar as under bed and pointing the joints (upto 15mm) with acid or alkali proof epoxy mortar including preparing the surface all complete as per the direction of EIC. | 50 | Square meter | 5,133.86 ₹2,56,693 Lowest |
| 7.00 | Grouting with Conbextra GP-2(Fosroc) or equivalent product under equipment bases, steel structures etc. including preparation of concrete surfaces by chipping, cleaning, etc. with approved quality of formwork as required curing and finishing the exposed surface with 1:1:2 cement concrete (nominal mix) by volume with 6mm down graded stonechips and necessary antishrinkage admixture as per the drawing, specification and direction of E-I-C. | 5 | Cubic meter | 58,800 ₹2,94,000 Lowest |
| 8.00 | Supplying fitting and fixing of 5 inch DASH FASTNER including drilling of holes and subsequent mending of damages as per the direction of EIC. | 200 | Each | 34.3 ₹6,860 Lowest |
| 9.00 | Hire and labour charges for erection of special steel scaffolding in conformity with the safety norms under Factory Act'1948 to faciliate safety of workers and use of PPEs like safety belt,net,helmet etc. for job performed beyond 4.00 mtr. elevation related to repairing and manitenance of building,S&P,glazing,painting works etc. including dismantling of the same as per direction of EIC . | 10,000 | Square meter | 30 ₹3,00,000 Lowest |
| 10.00 | Applying Acrylic emulsion paint of approved make and brand on walls and ceilling including sand papering in intermediate coats including putty. One coat. (a) Luxury quality | 2,000 | Square meter | 63.6 ₹1,27,200 Lowest |
Tender Value
₹2.0 Cr
EMD Value
₹2.0 L
Closing Date
3 Aug 2026, 3:00 pmClosed
GM BTPS
Administrative Building, Bandel Thermal Power Station, Tribeni, Dist Hooghly Pin-712503
Biennial Contract for Various Civil jobs under Civil-IPH at BTPS.
2026_WBPDC_1033433_1
WBPDCL/BTPS/NIT/E2849/26-27
Open Tender
Support/Maintenance Service
Item Rate
730 days
Bandel Thermal Power Station
Please refer Tender documents
5 documents required · 5 mandatory
₹0
₹2.0 L
Yes
2 Sept 2026
22 Jul 2026
5 Aug 2026
22 Jul 2026
3 Aug 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Biennial Maintenance contract for execution of:-
A) Building work (Vol-I) as per PWDSOR (WC-II) Govt. of W.B as per relevant books effective from 01.11.2017 up to 15th addendum & corrigendum w.e.f 07.09.2022 thereof.
B) Sanitary & plumbing work (Vol-II) as per PWDSOR (WC-II) Govt. of W.B as per relevant book effective from 01.11.2017 up to 7th addendum & corrigendum w.e.f 22.01.2020 thereof.
C) Roads work, Bridge & culverts work and carriage etc. (Vol-III) as per PWDSOR Govt. of W.B for works as per relevant books effective from 30.08.2018 up to 10th addendum & corrigendum w.e.f 24.08.2022 thereof.
Payable quantity will be as per execution at actual and rates for payment will be on the basis of rates given in above WBPWD schedule for different items. | - | Activity Unit | 1,30,00,000 | - |
| 2 | Maintenance of Aquarium at BTPS Guest House [Gongotri] for changing of different types of colour fishes, food, medicine for treatment of water, time to time change of ater, maintenance of pumps etc. all charges complete. | - | Each | 3,213 | - |
| 3 | Supply of unskilled listed worker for sanitary & plumbing works and other works of miscellaneous nature on as and when required basis. | - | Man Day | 1,247.91 | - |
| 4 | Differential wage rate to accommodate existing labour (covered under settlement) wages at BTPS with respect to the assumed/estimated wage rate as per WBPDSOR [Manday means working day including CL, EL & holiday] | - | Man Day | 754.15 | - |
| 5 | A) Cost of PPE and Liveries for listed workers for 02 years period [i) soap 6 nos per month, ii) Duster 04 nos per year, iii) Helmet 01 no per 2 year iv) Safety shoe 01 pair per 2 years, v) Hand gloves 01 pair per month, vi) Nose guard 02 nos per month].
B) Cost of PPE for 02 Non-listed worker for 02 years period [i) Safety shoe 01 pair per 2 years, ii) Hand gloves 01 pair per month, iii) Helmet 01 no per 2 year, iv) Nose guard 02 nos per month].[As per Analysis prepared by HR&A departament] The PPE quantities are indicative only but does not absolve the responsibility of executing agency to maintain the safety standard applicable within factory area. | - | Activity Unit | 97,784 | - |
| 6 | Laying of 38mm thick acid proof tiles in floors, wall and drains with acid proof cement mortar including application of primer and 6mm thick of potassium silicate mortar as under bed and pointing the joints (upto 15mm) with acid or alkali proof epoxy mortar including preparing the surface all complete as per the direction of EIC. | - | Square meter | 4,278.22 | - |
| 7 | Grouting with Conbextra GP-2(Fosroc) or equivalent product under equipment bases, steel structures etc. including preparation of concrete surfaces by chipping, cleaning, etc. with approved quality of formwork as required curing and finishing the exposed surface with 1:1:2 cement concrete (nominal mix) by volume with 6mm down graded stonechips and necessary antishrinkage admixture as per the drawing, specification and direction of E-I-C. | - | Cubic meter | 49,000 | - |
| 8 | Supplying fitting and fixing of 5 inch DASH FASTNER including drilling of holes and subsequent mending of damages as per the direction of EIC. | - | Each | 29.8 | - |
| 9 | Hire and labour charges for erection of special steel scaffolding in conformity with the safety norms under Factory Act'1948 to faciliate safety of workers and use of PPEs like safety belt,net,helmet etc. for job performed beyond 4.00 mtr. elevation related to repairing and manitenance of building,S&P,glazing,painting works etc. including dismantling of the same as per direction of EIC . | - | Square meter | 25 | - |
| 10 | Applying Acrylic emulsion paint of approved make and brand on walls and ceilling including sand papering in intermediate coats including putty. One coat. (a) Luxury quality | - | Square meter | 53 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.92 MB
BOQ_2538077.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .