| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹1.6 CrAccepted-Finance BHAJAN GARH KAILASH GATE MUNI KI RETI DISTT TEHRI GARHWAL | ₹1.6 Cr | L 1 | Accepted-Finance QUALIFIED |
| 2 | L2₹1.6 CrRejected-Finance VILLAGE MANDOW TEHSIL JOSHIYARA DISTT UTTARKASHI | UTTAR KASHI | UTTARAKHAND | 249128 | ₹1.6 Cr | L2 | Rejected-Finance DISQUALIFIED |
| Sl No | Description | Qty | Unit | daya sankar baluni L2 | SANGAM CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Slip clearance (by manual means) of earth and boulders including disposal complete as directed by the Engineer-in-charge. | 1,020 | CUM | 240.1 ₹2.4 L | 239 ₹2.4 L |
| 2.00 | Excavation in foundation for retaining, breast walls etc, in all types of soils
and rocks including all lead, lift and disposal of surplus material as per
direction of engineer - in - charge, as per drawing and technical
specifications Clause 305.1 of MORD Specifiction | 800 | CUM | 403.19 ₹3.2 L | 402 ₹3.2 L |
| 3.00 | Providing concrete (1:3:6) for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 | 345 | CUM | 7,013.43 ₹24.2 L | 6,995.8 ₹24.1 L |
| 4.00 | Stone masonry in (1:5) cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 | 1,810 | CUM | 4,234.52 ₹76.6 L | 4,223.9 ₹76.5 L |
| 5.00 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls,
etc. including supply of all material, labour, T&P and royaltiies etc.
complete as per drawing and technical specifications Clauses 702, 704,
1202 & 1203 of MORD Specifiction | 60 | CUM | 2,342.43 ₹1.4 L | 2,336 ₹1.4 L |
| 6.00 | Hand Packed stone filling in back of wallls including cost of all materials,
royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | 140 | CUM | 1,040.79 ₹1.5 L | 1,038 ₹1.5 L |
| 7.00 | 40MM Thick CC 1:2:4 Grouting in channel Bed | 4,500 | SQM | 315.52 ₹14.2 L | 314 ₹14.1 L |
| 8.00 | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 | 13,000 | SQM | 230.95 ₹30.0 L | 230 ₹29.9 L |
| 9.00 | Pointing with cement mortar (1:3) on brickwork as per drawing and technical
specification Clauses 613.3 and 1204 | 150 | SQM | 88.4 ₹13,259.77 | 88 ₹13,200 |
| 10.00 | Providing and laying reinforced cement concrete For nominal mix 1:2:4 (Hand mixed) in superstructure as per drawing
and technical specifications Clauses 800, 1205.4 and 1205.5 | 12 | CUM | 9,995.42 ₹1.2 L | 9,970 ₹1.2 L |
Updated dates
Tender Value
₹1.9 Cr
EMD Value
₹3.9 L
Closing Date
2 May 2026, 5:00 pmClosed
SANJAY RAJ
Office of Superintending Engineer Irrigation Works Circle Joshiyara Uttarkashi
Reconstruction and Restoration work of 04 damaged hill canals in Dunda Block,District Uttarkashi (Dungi Canal Reach -0.00 Km to 4.20Km. and Branch Gule)
2026_IRDCE_94387_1
02/SE/2026-27
Open Tender
Civil Works - Canal
365 days
DUNDA BLOCK
REQUIRED DETAILS TO BE FILLING AS PER STANDARD BIDDING DOCUMENT
4 documents required · 4 mandatory
₹5,900
EXECUTIVE ENGINEER IRRIGATION DIVISION
₹3.9 L
Office of Superintending Engineer Irrigation Works
14 May 2026
18 Apr 2026
4 May 2026
18 Apr 2026
2 May 2026
19 Apr 2026
21 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Slip clearance (by manual means) of earth and boulders including disposal complete as directed by the Engineer-in-charge. | - | CUM | - | - | Excavation in Marshy Soil Excavation for roadway in marshy soil with hydraulic excavator 0.9 Cum bucket capacity including cutting and loading in tippers and disposal with a lift upto 1.5 m and lead upto 1000 m, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification |
| 2 | Excavation in foundation for retaining, breast walls etc, in all types of soils
and rocks including all lead, lift and disposal of surplus material as per
direction of engineer - in - charge, as per drawing and technical
specifications Clause 305.1 of MORD Specifiction | - | CUM | - | - | Providing cement concrete for open foundations complete as per drawings and technical specifications Nominal mix 1:2:4 |
| 3 | Providing concrete (1:3:6) for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 | - | CUM | - | - | Reinforced cement concrete in substructure complete as per drawingsand technical specification (For Height 5m to 10 m ) R.C.C grade M 25 |
| 4 | Stone masonry in (1:5) cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 | - | CUM | - | - | Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification. |
| 5 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls,
etc. including supply of all material, labour, T&P and royaltiies etc.
complete as per drawing and technical specifications Clauses 702, 704,
1202 & 1203 of MORD Specifiction | - | CUM | - | - | Providing weepholes in brick masonry/stone masonry,plain/ reinforced concrete abutment, wing wall, return wall with 90 mm dia (PE 63 grade PN8) drawing face complete as per drawing and technical specification. |
| 6 | Hand Packed stone filling in back of wallls including cost of all materials,
royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | - | CUM | - | - | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 |
| 7 | 40MM Thick CC 1:2:4 Grouting in channel Bed | - | SQM | - | - | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per |
| 8 | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 | - | SQM | - | - | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 In cement mortar (1:5) |
| 9 | Pointing with cement mortar (1:3) on brickwork as per drawing and technical
specification Clauses 613.3 and 1204 | - | SQM | - | - | Providing fitting and fixing mild steel railing complete as per drawing and technicalspecifications Clause 1208.2 |
| 10 | Providing and laying reinforced cement concrete For nominal mix 1:2:4 (Hand mixed) in superstructure as per drawing
and technical specifications Clauses 800, 1205.4 and 1205.5 | - | CUM | - | - | Painting on Steel Surfaces Providing and applying two coats of ready mix paint including primer coat of approved brand on steel surface after through cleaning of surface to give an even shade as per drawing and Technical Specification Clause 1701 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.08 MB
Tendernotice_2.pdf
PDF • 0.47 MB
Tendernotice_3.pdf
PDF • 3.15 MB
BOQ_111703.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid