Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹6.5 L+₹15,401.99 (2.43%)Admitted-Fee/PreQual/Technical/Finance THEKKEKARA MAKKAPPALLIL PUTHENCHANTHA P O | KERALA | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹6.5 L+₹15,704.34 (2.47%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹6.8 L+₹48,166.99 (7.59%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹7.0 L+₹62,223.40 (9.80%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | RAJAN VARGHESE L6 | JOSEPH JOSE L7 | Midhun Mathew L9 | Shaji Andrews L2 | NIDHIN MATHEW L8 | Aji Joseph L5 | ST. MARYS CONSTRUCTIONS L1 | Ratheesh p s L10 | RIJU I B L3 | Tijo Abraham Varghese L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Road Concreting | |||||||||||||
| 1.00 | OD38749/2026-2027:Surface dressing of the ground including removing vegetation and in -equalities not exceeding 15cm deep and disposal of rubbish, lead upto 1.5m and filling the sides the carriage way.All kinds of soil | 534 | sqm | 29 ₹15,486 | 10 ₹5,340 Lowest | 30.85 ₹16,473.9 | 28 ₹14,952 | 15 ₹8,010 | 29.31 ₹15,651.54 | 26 ₹13,884 | 31.87 ₹17,018.58 | 27.35 ₹14,604.9 | 35 ₹18,690 |
| 1.00 | OD50170/2026-2027:Filling with Quarry Muck
Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 10.8 | cum | 900 ₹9,720 | 750 ₹8,100 | 820.57 ₹8,862.16 | 727 ₹7,851.6 | 700 ₹7,560 Lowest | 779.73 ₹8,421.08 | 710 ₹7,668 | 839.8 ₹9,069.84 | 727.71 ₹7,859.27 | 947 ₹10,227.6 |
| 1.00 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 80.1 | cum | 8,100 ₹6,48,810 | 8,550 ₹6,84,855 | 8,282.21 ₹6,63,405.02 | 7,343 ₹5,88,174.3 | 8,350 ₹6,68,835 | 7,870 ₹6,30,387 | 7,172 ₹5,74,477.2 Lowest | 8,476.35 ₹6,78,955.64 | 7,344.96 ₹5,88,331.3 | 7,603.18 ₹6,09,014.72 |
| 1.00 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification
(i) Nominal mix (1:2:4) | 3.75 | cum | 8,300 ₹31,125 | 7,200 ₹27,000 | 7,955.71 ₹29,833.91 | 7,053.5 ₹26,450.63 | 8,800 ₹33,000 | 7,559.76 ₹28,349.1 | 6,890 ₹25,837.5 Lowest | 8,142.13 ₹30,532.99 | 7,055.4 ₹26,457.75 | 7,395.31 ₹27,732.41 |
| 1.00 | 3.4:Construction of Embankment with Material Obtained from Borrow Pits <br> Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | 26.64 | cum | 400 ₹10,656 | 125 ₹3,330 Lowest | 570.49 ₹15,197.85 | 488 ₹13,000.32 | 550 ₹14,652 | 542.1 ₹14,441.54 | 494 ₹13,160.16 | 573.43 ₹15,276.18 | 505.93 ₹13,477.98 | 658 ₹17,529.12 |
Tender Value
₹8.5 L
EMD Value
₹21,183
Closing Date
24 Jul 2026, 2:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer LID and EW Division Kottayam
Annual Plan-DPK 52/27-Puthuppally Division Puthuppally GP Kaippanattupadi Vattamalappadi Road General Civil Work
2026_LSGD_860809_5
1/2026-27/AEE/LID and EW
Open Tender
Civil Works - Roads
Item Rate
240 days
Kottayam
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,870
Yes
₹21,183
Yes
25 Jul 2026
17 Jul 2026
25 Jul 2026
17 Jul 2026
24 Jul 2026
17 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Road Concreting | |||||
| 1.001 | OD38749/2026-2027:Surface dressing of the ground including removing vegetation and in -equalities not exceeding 15cm deep and disposal of rubbish, lead upto 1.5m and filling the sides the carriage way.All kinds of soil | - | sqm | - | - |
| 1.002 | OD50170/2026-2027:Filling with Quarry Muck
Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | - | cum | - | - |
| 1.003 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 1 | cum | - | - |
| 1.004 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification
(i) Nominal mix (1:2:4) | - | cum | - | - |
| 1.005 | 3.4:Construction of Embankment with Material Obtained from Borrow Pits <br> Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | - | cum | - | - |
stage.html
html • 0.03 MB
finance_1455954.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.18 MB
afida.pdf
Tender Documents • 0.23 MB
BOQ_1455954.xls
BOQ • 0.30 MB
epay.pdf
Tender Documents • 0.24 MB
ferere.pdf
Tender Documents • 0.33 MB
viewsbd.pdf
Tender Documents • 1.89 MB
fot.pdf
Tender Documents • 0.24 MB
pa.pdf
Tender Documents • 0.25 MB
ip.pdf
Tender Documents • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .